My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.3.5.During pressure tests,ambient air temperature can affect 4.5.2.If the tank is not configured as shown in Figure 4-2 prior <br /> pressure-gauge readings. to installation,contact the manufacturing facility that shipped the tank. <br /> 4.3.6.When testing tanks with wet monitoring,remove <br /> the reservoir fitting plug. <br /> ----------- <br /> 4.3.7.If the tank has threaded fittings,the installer is Interstitial <br /> responsible forselectingathread sealantthatiscompatible Test Manifold Nylon Tie <br /> with the product being stored.Some sealants cannot be used <br /> with some stored products. -------- ------- <br /> 4.3.8.Remove factory-supplied <br /> -----[----- <br /> 4.3.8.Removefactory-supplied temporary plugs and - <br /> install permanent plugs in all openings where piping will <br /> not be installed. -----<>-------� Assembly Quick Disconnect <br /> � �, <br /> 4.3.9.Make sure all manway bolts orflange bolts are <br /> torqued to 25 ft-Ib[34 N-m],and fitting plugs are properly <br /> doped and sealed. <br /> 4.3.10.The tank may be pressure tested with the Monitor Monitor <br /> factory-supplied temporary plugs.Redope and tighten Access Fitting Access Fitting <br /> temporary plugs if needed. ill <br /> 4.3.11. Keep one service fitting open in each compartment <br /> for the test manifold. <br /> 4.3.12.Tanks equipped with flanged nozzles may <br /> require contractor-supplied blind flanges for preinstallation ALTERNATE STANDARD <br /> pressure testing. METHOD METHOD <br /> 4.4.PRESSURIZING THE PRIMARY TANK <br /> 4.5.3.The quick-disconnect assembly must not be connected to the <br /> 4.4.1.Install the test manifold in the open service fitting service fitting when pressure testing the primary tank.Keep the nylon <br /> and connect the pressure source to the test manifold. tie in place. <br /> 4.4.2.If the interstitial space is dry,close the valve 4.5.4.Maintain the pressure in the primary tank. <br /> on the interstitial test manifold before pressurizing the <br /> primary tank. NOTICE <br /> Do not conned the pressure supply directly to the access fitting for <br /> 4.4.3.Open the pressure-supply valve and pressurize the primary interstitial-space monitoring.Pressurizing the secondarytank(in- <br /> tankto 5 psig[35 kPa](3 psig[21 kPa]for 12-foot-diameter tanks). terstitial space)by itself could damage the primary tank orcause <br /> Allow a few minutesforthe temperature in the tank to stabilize, tankfailure. <br /> then allow the pressure to stabilize by adding or removing pressure <br /> as necessary. 4.5.5.Free the hose from the service fitting by cutting the nylon tie. <br /> 4.4.4.Close the valve on the primary tank test manifold 4.5.6.Insertthe hose into the quick-disconnect fitting and open thevalve <br /> and disconnect the pressure supply. to allow pressure to transfer from the primary tank to the interstitial space. <br /> 4.4.5.Hold and monitorthe pressure fora minimum of 1 hour. 4.5.7.Reconnect the pressure-supply line.Allow the pressure <br /> to stabilize at 5 prig[35 kPa](3 psig[21 kPa]far 12-foot-diameter <br /> 4.4.6.If the interstitial test manifold shows a pressure build-up tanks)by adding or removing pressure as necessary. <br /> in the interstitial space of a dry-monitor,double-wall tank,contact the <br /> manufacturing facility that shipped the tank. 4.5.8.Close the pressure-supply valve on the test manifold <br /> NOTE: Do not attempt unauthorized repairs. and disconnect the pressure-supply line. <br /> 4.5. PRESSURIZING THE INTERSTITIAL SPACE 4.6.SOAPING THE TANK <br /> IN A DRY TANK 4.6.1.After pressurizing the tank,soap the tank to check the tank's <br /> integrity. <br /> A WARNING • Soap either the fittings,manways and covers or the entire exterior of the <br /> Never lift or hoist a tank under pressure.Failuretofollow tank,depending on what part of the testing process the tester is at and <br /> thiswarning could resultin death or serious injury. what kind of tank is being pressure tested.See Pressure-Testing Sidebar <br /> NOTE:Do not attempt unauthorized repairs. instructions for specific types of tanks. <br /> • Watch foractive bubbles.There should not be any. <br /> 4.5.I.Tankswithadryinterstitialspace come with aquick-disconnect • During freezing conditions,a suitable solution such aswindshield <br /> assembly that maybe used as the interstitial test manifold.See Figure 4-2. washerfluid maybe added to the soap and water mixture. <br /> 4:TESTING DURING INSTALLATiui. 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.