Laserfiche WebLink
PRESSURE TESTING SIDEBAR <br /> Single-Wall (or Primary)Tank 4.If there is no monitoring fluid on Dry Double-Wall <br /> eithertheinteriorortheexteriorof Multicompartment Tank <br /> 1.Pressurize the tank. any compartment,backfill the tank Not Under Vacuum <br /> 2.Check threaded orflanged joints to the top of the tank. <br /> for problems with the tank. 5.After the tank is backfilled to the top 1.Install a test manifold in the base tank <br /> 3.Soap the entire exterior of the tank of the tank,it may be pressure tested and in each end compartment. <br /> (not applicable for a double-wall tank), as in Single-Wall(or Primary)Tank 2.Pressurize the base tank and the end <br /> including all service fittings and steps 1-6. compartment(s)as in a Single-Wall <br /> manways when present. NOTE:For multicompartmenttanks, (or Primary)Tank steps 1-4. <br /> 4.Hold and monitor the pressure follow these instructions to test ea ch 3.Pressurize the interstitial space using <br /> for a minimum ofIhour. tmentthe quick-disconnect assembly and follow <br /> compartment.5.Carefully release the pressure from the tank. instructions for Dry Double-Wall Tank <br /> 6.Remove the test manifold and replace Not UnderVacuum steps 3-6. <br /> the protective covers in the service fittings. Dry Double-Wall Tank 4.Afterthe tank is backfilled to the top <br /> Not Under Vacuum of the tank,it may be pressure tested <br /> Wet Double-Wall Tank as in Single-Wall(or Primary)Tank <br /> 1.Testthe primary tank as in Single-Wall steps 1-6. <br /> NOTICE (or Primary)Ta nk steps 1-4. <br /> Never pressurize a wet interstitial space. 2. Use the quick-disconnect assembly Dry Double-Wall Tank <br /> Doing so could result in damage to the to pressurize the interstitial space. Under Vacuum <br /> primary tank and/or tank failure. 3.Soap the entire exterior of the tank. <br /> 4.Hold and monitorthe pressure in 1.Follow the pass/fail criteria shown <br /> 1.Check the level of the monitoring fluid the interstitial space for a minimum in section 4.9.4for double-wall <br /> in the reservoir. of 1 hour. tank shipped undervacuum <br /> 2.Visually checkthe interior and the 5.Carefully release the pressure from to determine if preinstallation <br /> exterior of each compartment for the primary tank. d. <br /> the presence of monitoring fluid. 6.Remove the test manifold and replace pressure testing is require <br /> 2.Afterthe tank is backfilledd. the top <br /> 3.If the monitoring fluid isnotatthe the protective covers in the service fittings. of the tank,it may be pressure tested <br /> proper level,and/or monitoring fluid 7.Afterthe tank is backfilled to the top as in Single-Wall(or Primary)Tank <br /> is found on eitherthe interior orthe of the tank,it may be pressure tested steps 1-6. <br /> exterior of any compartment,contact as in Single-Wall(or Primary)Tank <br /> the manufacturing facility that shipped steps 1-6. <br /> the tank. <br /> NOTE:All UL-and ULC-label and potable watertanks must be pressure tested after backfill is brought close to the top of the tank. <br /> 4:TESTING DURING INSTALLATION 19 <br />