My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.12.Use the tops of the ribs to establish longitudinal level. 5.2.18.If secondary backfill material is to be used on the perimeter <br /> Establish lateral level by placing the level across the top of a fitting of the installation,it must be placed and compacted at the same time <br /> ora manway. as the primary backfill material. <br /> NOTICE 5.2.19.During the backfilling process,it is good practice to continue <br /> Do not place straps between ribs(not applicable for 4-foot- to check tank deflection. <br /> diameter tanks).Failure to properly place straps could result <br /> in damage to the tank. NOTICE <br /> Thoroughly hand-tamp backfill to eliminate all voids under the <br /> 5.2.13.If anchor straps are to be used,install them at this time. tank.Do not allow the tank to shift during the backfill procedure. <br /> See section 1 and follow these instructions: If there are voids under the tank and/or the tank has shifted once <br /> • The locations for anchor straps are marked on tank ribs by the backfilliIng has commenced,itwill benecessarytoremove andreinstaII <br /> arrow head symbol(on the tank itself on 4-foot-diameter tanks). the tank.Failure to follow this notice could result in damage to the <br /> • All marked anchor strap locations must have straps. tank and other property damage. <br /> • Place a strap on each marked location and install anchoring <br /> hardware.See section 1. 5.2.20.After backfill has been broughtto the top of the tank,take <br /> • Tighten each anchor strap until it is snug over the rib(overthe tank anothertank diameter measurement.Record it as Measurement#3 <br /> itself on a 4-foot-d ia meter tank),but does not cause any deflection in the Tank Installation Checklist,and determine whether tank deflection <br /> of the tank.Straps must be uniformly tight. is within the allowable limits. <br /> • A 12-inch-thick(30 cm]bedding is required under the tank, 5.2.21.All UL-label,ULC-label and potable watertanks must be <br /> even when low-profile deadmen are used. pressure tested after backfill is brought close to the top of the tank. <br /> • Afterthe straps have been installed and tightened,take a tank diameter <br /> measurementto checktank deflection,and record itas Measurement#2 5.2.22.If additional testing(postinstallation testing for pressure- <br /> on the Tank Installation Checklist. testable tanks or optional hydrostatic testing)is to be done,perform <br /> those tests now.See section 6 for instructions. <br /> NOTICE <br /> Overdeflection of the tank could result in damage to the tank. 5.2.23.Typically,installers choose whether the tank should <br /> be ballasted at this time.See section 5.5 for instructions. <br /> 5.2.14.Install bottom fittings and bottom piping on water/wastewater <br /> tanks at this time.See section 5.4. 5.2.24.If piping and/orventing needs to be installed, <br /> 5.2.IS.Place approximately 121nches[30cm]ofprimary backfill around cc m p late th is wo rk n ow.See sectio n 7 fo r i nstru ctio ns. <br /> the bottom of the tan ksbetweenthe rIbs(if present)and under the end 5.2.25.If containment sumps need to be installed,do that <br /> domes. now.See section 7 for instructions. <br /> • Use a nonmetal tamping rod long enough to reach beneath the tank 5.2.26.Continue to backfill to grade,or to subgrade if concrete <br /> to push material under the tank body and domes until solid resistance or asphalt is to be installed. <br /> is felt.All voids must he filled and the tank must be fully supported. <br /> See Figure 5-1. 5.2.27.When the tank has been backfilled to subgrade <br /> (but before placement of slab),take the last required tank <br /> diameter measurement. <br /> Hill • Record it as Measurement#4 and determine whethertank <br /> RIGHT _IIII— WRONG III - deflection is within the allowable limits shown in Table 1.6. <br /> III=IIIII III= • Subtract Measurement#4 from Measurement#1 and record it <br /> IIIII= IIIII- as the Deflection Measurement on theTank Installation Checklist. <br /> IIII—IIIII IIII—IIIII 5.2.28.Install reinforced or unreinforced concrete/asphalt, <br /> if used,at this time.See section 1. <br /> NOTICE • The cover depth must meet the appropriate minimum specified <br /> Do not use metal probes.Failure to follow this notice could result in section 1. <br /> in damage to the tank. • All backfill that is to be compacted must be compacted with <br /> a hand-guided,vibrating-plate,mechanical compactor. <br /> NOTICE E <br /> Do not strike the tank with the tamping rod.Failure to heed NOTICE <br /> this notice could result in damage to the tank. Do not Failure to follow this notice could result in damage to the tank <br /> 5.2.16.Repeat point 5.2.15 with a second lift of approximately and/or surrounding property. <br /> 12 inches[30 cm]of primary backfill. <br /> 5.2.29.If the tank has a monitoring system,after backfilling <br /> 5.2.17.Afterthe second lift of material has been placed and is completed and after top slab is in place(if used),perform necessary <br /> worked underthe tank,bring the backfill to the top of the tank. monitoring checks.See section 8. <br /> • Place backfill material evenly on opposite sides of the tank <br /> so that the tank does not shift. 5.2.30.Complete theTank Installation Checklist. <br /> 5: INSTALLING TANKS 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.