Laserfiche WebLink
7.4.VENTING INTERSTITIAL SPACES NOTICE <br /> NOTICE Make sure that no heavy objects are allowed to distort the <br /> AIwetmonitoringsystemsmustbeventedforproperopera- containment sump top after final assembly.This includes <br /> tion.Failure to do this could result in damage to the tank and/or the street box and concrete pad.No weight should be <br /> surrounding property. transferred to the tank.Failure to follow this notice could <br /> 7.4.1.When the tank's interstitial space is filled with a monitoring result in property damage. <br /> fluid,the space must be vented.It is sufficientto drill a 1/4-inch-dia meter 7.5.6.To complete the containmentsump installation: <br /> [6-mm-diameter]hole in the side orcap of the reservoir standpipe as • Backfill to the top of the containmentsump system. <br /> supplied by the installer.If the groundwater level could be high enough • Backfill around the outside edge of the containment sump, <br /> to entera drilled vent hole,install a vent line from the standpipe and making sure that no backfill is on top of the containment <br /> position it above the high-water level. sump.See Figure 7-1,Backfill A. <br /> • Isolate the containment sump from all traffic loads. <br /> 7.4.2.When the interstitial space is dry,it is not necessary to vent • Install a concrete form/barrier(for example,the concrete pad/street- <br /> the space to atmosphere. box frame)to allow a minimum 3-inch[7.5 cm] clearance between <br /> 7.5.INSTALLING CONTAINMENT SUMPS any load-bearing item and the containmentsump top. <br /> • Typically,a sheet of plywood(or other material)is used as a barrier <br /> 7.5.1.Containment sumps come in a variety of models and sizes. and is set on the backfill to ensure that there is at least a 3-inch <br /> 7.5.2. Instructions forthe different models are found in supplemental [7.5 cm]clearance above the containmentsump top.See Figure 7-1, <br /> materials.See the Introduction for information on where to obtain Barrier B. <br /> supplemental instructions. • Choose a street-box size that allows enough clearance around <br /> the containment sump top opening for proper operation <br /> 7.5.3.The contammentsump provides an enclosure fora submersible of the cover. <br /> pump and a termination point for secondary piping systems. • Set the street box,and check for clearance to allow access <br /> • It provides containment of product from the pump and/or piping and space to remove the watertight cover.See Figure 7-1, <br /> connections. Street Box C. <br /> • It is designed to be monitored continuously using electronic sensors. • Contin uewith backfill,asreq uired,tosubgrade.See Figure7-1, <br /> 7.5.4. Before installing containment sumps: Backfill A. <br /> • consult all codes and regulations of appropriate governmental • Maintain good drainage of water away from the access opening <br /> agencies to ensure proper monitoring compliance of the containment sump top when installing the surface pad. <br /> • sssure that all containment sumps will be isolated from See Figure 7-1,Surface Pad D. <br /> traffic loads <br /> • perform a visual inspection of the sump for potential shipping <br /> damage No Backfill on the Barrier B <br /> • contact the manufacturing facility that shipped the tank if damage is ContainmentSump <br /> detected <br /> • check to make sure the sump is the correct length for intended Surface <br /> burial depth. Pad D Street Box C Backfill A <br /> • obtain the specific containment sump supplement for the <br /> application installation.See Introduction for list of supplements. 1 <br /> 7.5.5.Install the containment sump according to the supplemental <br /> instructions that apply.Go to zcl.com to find additional copies of the <br /> supplements. „ <br /> CAUTION ���i iii <br /> ilii iii <br /> Always wear eye protection and gloves when handling,grinding, i ���iii <br /> cutting and attaching the containment sump unit.Failure to do so TYPICAL ii ii <br /> could result in minor or moderate injury. i i INSTALLATION viii <br /> NOTICE (Watertight Cover Shown) i�iiiii� <br /> Do not drop the containment sump assembly components or ' iiiiii <br /> allow the sum body to roll.Since high damage ii,� i <br /> P Y 9 9 ilii ii <br /> sump components,protect and secure all pieces ifwindy condi- <br /> tions arise.Failure to follow this notice could result in damage to <br /> surrounding property. <br /> 7: PIPING,VENTING AND CONTAINMENT SUMPS 25 <br />