My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
INSTALL 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 1:59:23 PM
Creation date
11/8/2018 9:40:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\1490\PR0541436\2018 INSTALL.PDF
QuestysFileName
2018 INSTALL
QuestysRecordDate
5/2/2018 6:57:48 PM
QuestysRecordID
3878462
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.4. FILLING TANKS (IN GENERAL) 10.1.2.After instaIlation,tankown ormust retain: <br /> 9.4.1.Never overfill the tank. • the Installation Manual forfuture reference to and compliance <br /> with operating guidelines, <br /> 9.4.2.If pump-filling or pressure-filling a tank,owner/operator • the Tank Installation Checklist <br /> musttakeprecautionstoprevenIoverip ressurization. • the limited warranty <br /> A WARNING • any written waivers applicable to these instructions. <br /> Overpressurizingthe tank could result intank failure,and could 10.2.APPENDICES <br /> result in death or serious injury. <br /> 10.2.1.These appendices are found in the following pages: <br /> A WARNING • Appendices Al,A2,A3,A4:Actual Capacities and Dimensions <br /> If a tank does not have overfill protection,the vent must be of Single-Wall and Double-Wall Tanks <br /> unrestricted and the vent size must be equal to or greater than the . Appendices B7,B2,83,B4:Weights of Single-Wall,Double-Wall <br /> fill.Failure to followthis warning could result in death or serious and MulticompartmentTanks <br /> injury. • Appendix C:Primary Backfill Requirements <br /> 9.5.FILLING UL-LABELED/ULC-LABELED TANKS • Appendix D:Split Backfill Requirements <br /> A WARNING • Appendix E:Tank Installation Checklist <br /> Pump-filling or pressure-filling of the tank is not <br /> recommended because an overfill oroverpressurization <br /> could occur.Overfilling the tank while under pressure <br /> could cause tank failure even if the tank is vented <br /> properly.Failure to follow this warning could result in <br /> tankfailure,and could result in death orserious injury. <br /> 9.5.1.Each time the tank is filled,the tank owner oroperator must <br /> make sure the tank is properly vented.See section 7. <br /> 9.5.2.The tank owner or operator must determine whether the tank <br /> has overfill protection,such as an automatic shut-off device(fill pipe <br /> flapper valve)or vent-restriction device(ball-Float valve),which will close <br /> off the internal piping and reduce the tank's capacity. <br /> • If a tank has a vent-restriction device(ball-float valve), <br /> we recommend that the tank be gravity-filled only. <br /> • The tank owneror operator must notify whoever fills the tank if the <br /> tank has overfill protection,which reduces the tank's capacity. <br /> • Before each tank filling,the tank owneror operatororthe delivery <br /> service must determine the tank's reduced capacity due <br /> to the overfill protection. <br /> • Then,the tank owner or operator orthe delivery service mustconsult <br /> the instructions or guidelines provided bythe installer <br /> and manufacturer of the overfill-protection device to <br /> determine how much additional productthe tank can hold. <br /> 9.5.3.The tank owner or operator mustensure thatthe fill line and <br /> drop tube are adequately grounded to prevent static discharge during <br /> filling. <br /> 9.5.4.Initial fill rate should be controlled to limit the possibility <br /> of product sloshing. <br /> 10: DOCUMENT REVIEW <br /> 10.1.INSTALLATION MANUAL <br /> 10.1.1.After installation,tank installer must deliver the following to the <br /> tank ownerand keep a copy of each: <br /> • the Installation Manual <br /> • completed Tank Installation Checklist <br /> 28 9: OPERATING GUIDELINES/10: DOCUMENT REVIEW <br />
The URL can be used to link to this page
Your browser does not support the video tag.