My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:03 PM
Creation date
11/8/2018 9:41:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-LLvJk:.`* <br /> SWRCB,January 2002 JUL Py Of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professign <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#1&2 UDC#3&4 UDC#5&6 UDC#7&8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel Coated Steel Coated Steel <br /> UDC Depth: 8" 8" 8" 8" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from Bottom Enters from Bottom Enters from Bottom Enters from Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Level 6" Water Level 6" Water Level 6" Water Level 6" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No No No <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:30 9:35 9:45 10:05 <br /> Initial Reading(R,): .001 .001 .001 .001 <br /> Test End Time: 10:00 10:05 10:15 10:35 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Chane in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? No No No No <br /> Was sensor properly replaced and N/A N/A N/A N/A <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.