My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3440
>
2300 - Underground Storage Tank Program
>
PR0231173
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:03 PM
Creation date
11/8/2018 9:41:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231173
PE
2361
FACILITY_ID
FA0006423
FACILITY_NAME
CENTRAL GAS STOCKTON
STREET_NUMBER
3440
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
3440 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\3440\PR0231173\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 JUL 1P&2416-of <br /> 9. SPILLIOVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S ill/Overfill Containment Boxes El o , <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X *See comments below <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum f_'Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(Rr R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> *Spill/Overfill Boxes tested with,Annual Monitoring System Certification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.