Laserfiche WebLink
INKNOLOGYv - UNDERGROUND LEAK DE'' TION SYSTEM - (V2. 1'�i <br /> . Page 11 <br /> HOO9204-ITBO96 62327 - Apr 23, 1991, 03:31 <br /> E :R -r IE C-)UE�: 1 0Men1 I F_�� <br /> Does water ever fill the boy area? N <br /> Which one? <br /> Are the fill caps locked during off-hours? N <br /> How often are dips made? - <br /> Have inventory shortages been noticed? N <br /> Which tank'? <br /> When did they begin? <br /> Fuel delivery that date? N <br /> Have shortages been consistent'-' N <br /> Have any customers complained of water in their tanks? N <br /> Water detecting paste used? N <br /> How often? - <br /> What has been the water level over the past two weeks? <br /> Are tanks tandemed'-' N x <br /> Which one(s)? <br /> Dispensing pumps: Submersible`' N <br /> Vacuum style? N <br /> Vapor recovery system present? N <br /> Style? <br /> Is the pipe fill cap water tight providing a goad seal? N <br /> Have dispensing pumps recently been calibrated? N <br /> Date (YY/MM/DD)? <br /> Has the sight glass been empty after 12 hours? N <br /> Are any of your dispensing pumps difficult to start? N <br /> Do any of your dispensing pumps develop a hesitation during delivery? N J <br /> Has a meter revolved without any accompanying delivery of product'?' N ° <br /> Are leaf; detectors in place? N <br /> Have any other tank tests or line tests recently been conducted? N <br /> Method <br /> Date (YY/MM/DD) <br /> Results <br /> ,i <br /> Witnesses present : 1 . <br /> 2. <br /> 3. <br /> 4. <br /> J. <br /> 6. <br /> 7. <br /> 9. <br />