Laserfiche WebLink
- <br /> Name of Sunnite"Own.,01 Deal., Addbaa No.and Sleet(.) Che slab 0.1.pt.Tell . <br /> 15. TANK TO TEST 16. CAPACITY Flom <br /> r$talion Chart <br /> �IrtBy most accurate (a ° <br /> m _ ominal Capacity capacity chair avaltable�O� <br /> l Tank Menulectuui s Chen <br /> N <br /> s� O _maedi,be poshbn Call... Glom I I Company Engineering Data <br /> A� Is there doubt as to True Capacity 7 I I Charge supplied with ro T1`'S <br /> I —e10nd m Onae See Section"DETERMINING TANK CAPACITY" l <br /> � ( .( Other_ <br /> 17. FILL-UP FOR TEST Slick Readings Total Gallons <br /> to W In. Gallons on.Reeding <br /> Slick Water Bottom ?,/ „ F Q <br /> before Fill-up_ _ — Inventory '�Uy <br /> to SV In. Gallons <br /> Fill Up:STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank DiameterCSC 1 e Product In lull tank(up to 1111 pipe) <br /> QOo /✓ pt <br /> W • 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK QU/ ��� ��ay sexy VAPOR RECOVERY SYSTEM <br /> °$ 010, 6�PI �er�do ?D <br /> x <br /> O C1 D See manual sections applicable.Check below and record procedure In log(26). Stage I <br /> Z Of ^ lorreefed 4Wr <br /> pj • Water In lank High water table In lank excavation 1 1 Line(s)being tested with LVLLT El Stage II <br /> D p m <br /> N <br /> 21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br /> l� 19. TANK MEASUREMENTS FOR Is Today Warmers 1 I Cnldero I I _. ^F Product in Tank . ^F fill-lip Product on (luck . ^F Expected Change( l or 1 <br /> TSTT ASSEMBLY <br /> Bottom o/lank to Grade..................... 22. Thermal-Sensor reeding after circulation <br /> ndgna N earl <br /> 5. --1 Add 30"for 1"L ................. _ <br /> Add 24”for 3"L or air seal....... 23. Dlylls per°F In range of expected change a Is <br /> Cn <br /> k1 G <br /> ITT :Ca <br /> Tobi tubing to assemble ADD,oximela ........ L[rG <br /> 20. EXTENSION HOSE SETTING 24. � — x.. gallons <br /> (j = 00 TO, <br /> qusni ly In eoettlelenl of expansion for volume change In INe Tank— <br /> _10 <br /> ank <br /> IT FDT7 /�- Tans lop to grade°.................................. full tank(1U or 17) Involved product per°F <br /> Extend hose on auction lube 6"or more <br /> _ below tank top .. ........................ ...... 25. This Is <br /> _ volume change per"F(24) Digits per"F In lest Volume change per digit. feel <br /> '11 Fill pipe extends above grade,use lop of fill. Range(23) Compute to 4 decimal places. lector(a) <br /> 26, 30. HYDROSTATIC 31. 34. 38.NIT vOLUME 39. <br /> PRESSURE VOLUME MEASUREMENTS IR I[MP[AANA(CIYPfNS1110R ACCUMULATED <br /> LOG OF TEST PROCEDURES CONTROL EACH REACHED RECORD 10.IDI CAL. USE(ACTOR Tal CHANGES CHANGE <br /> 27. 28. 29. Sbadpipe Luul 32. Tsmpr,nure M Nip bbl nail <br /> Predu[r in Prrdu[I 35. 36China. 3 Cabpvmiom Adlarimmr b1Y IN sarladtea <br /> gg[ Retard details of selling up asset" In Inlhn Grrdprb RgIwA 1-1 TMlmd Highs 1[) - Isl - volume Minus - <br /> and running lest. (Use full Ks. 0rgianieg I.Z n -- - Samel Lrwat- 'IF msto, r Ei:pamion(l)or AT In heal narde <br /> ItaE length of line it needed.( of whish I Lee Alb, Product Readleg ([I Corin Lien - Conuadbn 1 ) Chays Tax Mee <br /> IN re t Ru/ins Rntobd Rmn"If Reading Her eeand(t) 033(VI-13fET) (KFN nsaM) <br />