Laserfiche WebLink
SAN JOAQUINLINTY ENVIRONMENTAL HEALTH DEOTMENT <br />DERGROUNDSTORAGETANK <br />MONITORING PLAN - PAGE I <br />TYPE OF ACTION ®l. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): - <br />FACILITY NAME Beacon Station #3492 <br />M05. <br />Muo. crry Manteca <br />FACLITY SH"E ADDRESS 470 N. Main Street <br />M31. <br />TESTING AND PREVENTIVE MAINTENANCE <br />M33. <br />II. EQUIPMENT <br />State law requires that testing, preventive maintenance, and calibration of monimdng equipment (erg., sensors, p robes, line leak detectors, etc.) be performed in <br />or annually, whichever is more frequent Such work must be performed by qualified personnel. <br />M06. <br />Mov <br />accordance with the equipment manufacturers' insWcdons, <br />❑ 1. ANNUALLY ❑ 99.OTHER (Specify): <br />M36. <br />M37. <br />MONITORING EQUIPMENT IS SERVICED <br />MONITORING LOCATIONS <br />III. <br />ng ( <br />This monitoring plan us[ include a Site Plan showing the general tank and piping layouts and the locations where monitoriperformed iter, location of each sensor, <br />m , current UST Monitoring Site Plan from a Monitoring System Certification <br />I have a diagram (erg.,Iude <br />line leak detector, monitoring system control panel, etc.). you already <br />form, Hazardous Materials Business Plan map, etc.) which showseq aired it with this Ian <br />I r'I'ANKIMONITORING <br />® 2. MECHANICAL LINE LEAK DETECTOR (MELD) <br />IV. <br />M10. <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />OR SECONDARY CONTAINMENT VAULT(S) <br />MELD MANUFACTURER(s): Red Jacket h LEAK TESTS <br />THAT ROUTINELY PERFORMS 3.0 g.p.h. <br />® L CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) <br />E] b. LIQUID FILLED ❑ El d. UNDER VACUUM <br />Mn <br />M12. MO PRESSURE <br />SECONDARY CONTAINMENT IS: ® a. DRY <br />DEL#: EMC <br />M13. <br />PANEL MANUFACTURER: Gilbaroo M14 MODEL #(S): 420 <br />M15. <br />LEAK SENSOR MANUFACTURER: Gilbarco <br />USED TO MONITOR SINGLE WALL TAN 6(S) <br />M17. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM <br />MODELM <br />❑ 4. INTEGRITY TESTING M45. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />❑ c. MIN. MONTHLY &EACH TIME SYSTEM OPERATED <br />PANEL MANUFACTURER: M11 MODEL #(S): <br />M19. <br />IN -TANK PROBE MANUFACTURER: <br />❑ b. DALYMIGHTLY El c. WEEKLY <br />M20. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS Mat <br />❑ e. OTHER (Specify): <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ d. MONTHLY no". <br />M23. <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. ❑ c. OTHER (Specify): <br />❑ b. STATISTICAL PER 23 CCR §2646.1 <br />Mia <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />M25. <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 M26. M27. <br />❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): <br />TEST FREQUENCY: <br />❑ 6.VISUALMONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY(Peaires agency approval) <br />M28 <br />❑ 99. OTHER (Specify): <br />MONITORING IS PERFORMED USING THE FOLLOWING METHODS) (Check all that apply) <br />AND OTHER SECONDARY CONTAINMENT <br />® 1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)ITRENCH(ES) <br />❑ PRESSURE ❑ d. UNDER VACUUM <br />M31. <br />M3UNDER <br />SECONDARY CONTAINMENT IS: ®a. DRY ❑ h. LIQUID FILLED <br />MODEL #: EMC <br />M33. <br />PANEL MANUFACTURER: Gilbarco M34 MODEL #(S): 208 <br />M35. <br />LEAK SENSOR MANUFACTURER: Gilbarco <br />TRIGGER AUTOMATIC PUMP (ire., TURBINE) SHUTDOWN? ® a. YES ❑ b. NOUMp <br />M36. <br />M37. <br />WILL A PIPING LEAK ALARM <br />THE MONITORING SYSTEM TRIGGER AUTOMAThC SHUTDOWN? <br />WILL FALURE/DISCONNECTION OF ANDRRES RICTS O❑R SHUTS <br />THAT ROUTINELY PERFORMS 3.0 g.p. . LEAK TES <br />OFF <br />® 2. MECHANICAL LINE LEAK DETECTOR (MELD) <br />PRODUCT FLOW WHEN A LEAK IS DETECTED M38 MODEL #(S): FX1V <br />M39. <br />MELD MANUFACTURER(s): Red Jacket h LEAK TESTS <br />THAT ROUTINELY PERFORMS 3.0 g.p.h. <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) <br />Moo. MODEL #: <br />Mal <br />ELLD MANUFACTURER; <br />❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 <br />Mae, <br />PROGRAMMED LINE INTEGRITY TESTS: <br />DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. [I YES ❑ b. NO <br />M43 <br />Moa. <br />WILL ELLD ❑ a .YES [I b. NO <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? <br />❑ 4. INTEGRITY TESTING M45. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />❑ c. MIN. MONTHLY &EACH TIME SYSTEM OPERATED <br />M46. <br />M47. <br />C]S.VISUAL MONITORING DONE: ❑ a. DAILY El WEEKLY* 5 <br />'Rvquvcs agency approval *'Alloweg ror monimring of unbur¢tl emergency gencra26361aipg only per HSC ¢228L5(h)(3) <br />El 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR § O(3 ) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />M48. <br />Cl 99.0THER (Specify) 07/23/03 <br />SJCEHD-d (07/03) -1/4 <br />