Laserfiche WebLink
oct 09 06 09:56a R R E*eering - 818842376[• p•5 <br />9 <br />a <br />9a. <br />a. Describe the method that will be utilized to purge and or inert the tant<(s <br />OGSGuiv 6^/g\ TahK kA LL E <br />b. Tank/Piping Hauler:-�- <br />Name G r <br />- <br />Address 255 P/�[z r� City <br />Zip y� <br />Phone No.( <br />Hauler Registration # (if hauled as hazardous) <br />C. Tank/Piping Disposal Site: <br />Name G 3 <br />Address 2'%s C A`�2(L �i.7St� GtyRlCWMC(41Z <br />Zip l t{Ba <br />Phone No.( 5la 11 235- 1393 <br />EPA ID# (if transported to a permitted TSD facility) <br />Is the sampling firm an independent third party from the contractor? YES [ ] <br />NO [ ] <br />��ofL�b� <br />benea the tank <br />obtained: <br />Describe, in detail, how the soil and/or water samples) wdyEZ <br />A-tTA4r-j aw <br />SfIAQLM <br />e� <br />I0. Describe how the excavation will be backfilled with suitable material upon removaL <br />Gj_Zt,� jvip=LaX ckA46oMQ=Q2 <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />t lelLcnL6,. <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name i NKKNQOh AT 'itit1S TYN'6 Hauler Registration <br />Zip <br />Phone No. <br />EH 23 046 (Revised 8/9/06) 5 <br />