My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
REMOVAL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:10:22 PM
Creation date
11/8/2018 9:41:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2006
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\REMOVAL 2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br />EMERGENCY CONTACT LISTING <br />Nature of Emergency <br />Phone Number <br />Ambulance <br />911 <br />Fire <br />911 <br />Police <br />911 <br />Poison Control Center <br />(800) 662-9886 <br />Chemical Spills <br />(800) 852-7550 <br />Hospital <br />911 <br />TRITON <br />(408) 475-8141 <br />12.0 TRAINING REQUIREMENTS <br />All personnel assigned to this project will be required to demonstrate that they have <br />completed the Initial Training Requirements (40 hours). An annual 8 hour refresher course is <br />also required in accordance with 29 CFR 1910. <br />Field personnel from Triton and their sub -contractors will attend a project briefing for safety <br />issues and project work task review before beginning work. All Triton site personnel shall <br />have completed training relative to the project operations plans, and the materials to be <br />encountered during the project. <br />13.0 MEDICAL SURVEILLANCE <br />Triton personnel and sub -contractors engaged in project operations shall be participants in the <br />Medical Surveillance program, and must be cleared by the examining physician(s) to wear <br />respiratory protection devices and protective clothing for working with hazardous materials. <br />The applicable requirements under 29 CFR 1910 will be observed. <br />A. Examination Requirements <br />All Triton personnel on-site shall have successfully completed a pre -placement or periodic <br />medical examination in accordance with established Triton policies and procedures, and <br />sslurojecr ivv. 12 Dare <br />
The URL can be used to link to this page
Your browser does not support the video tag.