My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
REMOVAL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:10:22 PM
Creation date
11/8/2018 9:41:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2006
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\REMOVAL 2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY CONTACT LISTING <br /> Nature of Emergency Phone Number <br /> Ambulance 911 <br /> Fire 911 <br /> Police 911 <br /> Poison Control Center (800)662-9886 <br /> Chemical Spills (800)852-7550 <br /> Hospital 911 <br /> TRITON (408)475-8141 <br /> 12.0 TRAINING REQUIREMENTS <br /> All personnel assigned to this project will be required to demonstrate that they have <br /> completed the Initial Training Requirements(40 hours). An annual 8 hour refresher course is <br /> also required in accordance with 29 CFR 1910. <br /> Field personnel from Triton and their sub-contractors will attend a project briefing for safety <br /> issues and project work task review before beginning; work. All Triton site personnel shall <br /> have completed training relative to the project operations plans, and the materials to be <br /> encountered during the project. <br /> 13.0 MEDICAL SURVEILLANCE <br /> Triton personnel and sub-contractors engaged in project operations shall be participants in the <br /> Medical Surveillance program, and must be cleared by the examining physician(s) to wear <br /> respiratory protection devices and protective clothing for working with hazardous materials. <br /> The applicable requirements under 29 CFR 1910 will be observed. <br /> A. Examination Requirements <br /> All Triton personnel on-site shall have successfully completed a pre-placement or periodic <br /> medical examination in accordance with established Triton policies and procedures, and <br /> SSP.Projecr Ago. 12 Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.