My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
REMOVAL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:10:22 PM
Creation date
11/8/2018 9:41:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2006
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\REMOVAL 2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH tEPARTMENT <br />OPgU1N O SAN JOAQUIN COUNTY <br />Unit Program Coordinators <br />Donna K. Heran, R.E.H.S. 304 East Weber Avenue, Third Floor Carl Borgman, R.E.H.S. <br />Director Mike Huggins, R.E.H.S., R.D.I. <br />Stockton, California 95202 Margaret Lagorio, R.E.H.S. <br />• .. P • Laurie A. Cotulla, R.E.H.S. Telephone: (209) 468-3420 Robert McClellon, R.E.H.S. <br />gciFiiaa Assistant Director JeffCarruesco,R.E.H.S. <br />Fax: (209) 468-3433 Kasey Foley, R.E.H.S. <br />APPLICATION FOR PERMIT TO CLOSE <br />UNDERGROUND STORAGE TANKS STORING HAZARDOUS MATERIALS <br />I. GENERAL INSTRUCTIONS: <br />[ ] I. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br />applicant with comments. <br />[ ] 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br />adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings, underground <br />public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If <br />underground utilities are not included on the site map, you must state in writing that USA Dig will be contacted prior to <br />excavation activities. <br />[ ] 3. Complete page 3, "Application for Underground Storage Tank Closure Permit". of : Sampling firm shall be <br />an independent third party from the contractor. <br />[ ] 4. Complete page 9, "Authorization to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the facility. <br />[ ] 5. Submit a "Service Request' form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br />(formerly State A & B forms) and complete the "Underground Storage Tank Program Fee Worksheet'. <br />[ ] 6. Complete all questions on page 10, the Environmental Health Department (EHD) "Underground Storage Tank <br />Disposition Tracking Record", except those requiring a signature and date of tank removal. The holder of the permit shall <br />be responsible for ensuring that this form is completed and returned to EHD within 30 days of the tank removal. <br />[ ] 7. Submit a "Site Health & Safety Plan" as an addendum to this application, to address all potential hazards for this <br />specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br />[ ] 8. If facility is located outside of the city limits, submit a "Backfill Excavation Certificate" as required by the <br />County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the Uniform <br />Building Code STD 70-11. <br />[ ] 9. Obtain a "Grading and Excavation Permit' from the City of Tracy Building Division prior to EHD approval of <br />the closure plan. <br />[ ] 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed plan. If <br />gross deficiencies are identified, an addendum will be required with a $95.00/hour fee and the review will begin on the date <br />of resubmittal. <br />[ ] 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. <br />[ ] 12. Advance inspection notice of at least 48 hours is required by EHD. <br />[ ] 13. Submit Contingency Plan for over -excavation at time of UST removal (if planning to over -excavate). <br />See "III. SITE MITIGATION" on Page 2. <br />EH 23 046 (Revised 11/21/06) <br />
The URL can be used to link to this page
Your browser does not support the video tag.