Laserfiche WebLink
0 0 <br />8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />b. Tank/Piping Hauler: <br />Name <br />Address City zip <br />Phone No.( ) <br />Hauler Registration # (if hauled as hazardous) <br />C. Tank/Piping Disposal Site: <br />XT --- <br />zip <br />Phone <br />EPA ID# (if transported to a permitted TSD facility) <br />9. Is the sampling firm an independent third party from the contractor? YES [ ] NO [ ] <br />9a. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />11. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the final destination of the excavated stockpile? <br />c) Contaminated Soil Hazardous Waste Hauler: <br />City <br />Phone No. <br />EH 23 046 (Revised 11/21/06) 5 <br />Hauler Registration <br />