My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T Lt=hank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> uipment is used to perform leak detection monitoring. <br /> This section must be completed if in-tank gauging eq <br /> Com lete the following checklist: <br /> binspected for proper entry and termination,including testing for ground <br /> ❑ yes No* faults? <br /> Has all input wiring been <br /> ❑ yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ yes No* Was accuracy of system product level readings tested? <br /> ❑ Yes No* Was accuracy of system water leve]readings tested? <br /> ❑ Yes No* Were all probes reinstalled properly? <br /> ❑ y� Nd* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe now and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> ComTete the followingchecklist: verify erformance? <br /> Y <br /> es El No* For equipment start-up or annual equipment certification, was aea❑ imulatedsimulated <br /> to vert UD p <br /> O N/A (Check all that apply) Simulated leak rate: 'Q 3 g.p. g•p•h <br /> Yes ❑ No* Were all I confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> yes ❑ No* For mechanical LLDs,does the LID restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ yes ❑ No* For electronic LLDs,does the rurbine automatically shut off if the LLD detects a leak? <br /> 0( N/A <br /> ❑ yes ❑ No* For electronic LEDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LEDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 'VJ N/A <br /> V— 13 No- were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H.below,describe dohand when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 03/01 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.