Laserfiche WebLink
T Lt=hank Gauging/ SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> uipment is used to perform leak detection monitoring. <br /> This section must be completed if in-tank gauging eq <br /> Com lete the following checklist: <br /> binspected for proper entry and termination,including testing for ground <br /> ❑ yes No* faults? <br /> Has all input wiring been <br /> ❑ yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ yes No* Was accuracy of system product level readings tested? <br /> ❑ Yes No* Was accuracy of system water leve]readings tested? <br /> ❑ Yes No* Were all probes reinstalled properly? <br /> ❑ y� Nd* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe now and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> ComTete the followingchecklist: verify erformance? <br /> Y <br /> es El No* For equipment start-up or annual equipment certification, was aea❑ imulatedsimulated <br /> to vert UD p <br /> O N/A (Check all that apply) Simulated leak rate: 'Q 3 g.p. g•p•h <br /> Yes ❑ No* Were all I confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> yes ❑ No* For mechanical LLDs,does the LID restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ yes ❑ No* For electronic LLDs,does the rurbine automatically shut off if the LLD detects a leak? <br /> 0( N/A <br /> ❑ yes ❑ No* For electronic LEDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LEDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 'VJ N/A <br /> V— 13 No- were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H.below,describe dohand when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 03/01 <br /> Page 3 of 3 <br />