My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04-16-04 11 : 16AM FROM R000NSTRUCTION 6 F02 <br /> Kern County Construction, Inc. <br /> P.O.Box 6096,Bakersfield,CA 93386 <br /> Contractors License#481053 <br /> (661)634.9950 Fox(661)634-9233 <br /> April 16,2004 <br /> San Joaquin County Environmental Health Dept. <br /> 304 E. Weber Ave. <br /> Stockton, Ca <br /> Attn: John Jackson <br /> Re: Conoco Phillips Site 2705445 <br /> We propose to remove concrete paving as necessary to excavate and remove a portion of <br /> the existing vapor recovery piping between the existing 91 octane tank and the existing <br /> 89 octane tank. The vapor line will be cut at the point the line manifolds between the two <br /> tanks. The existing FRP tee will be replaced with a new Ameron Phialloy 90 degree <br /> elbow. The existing bulkhead fitting in the 91 turbine sump will be removed and the <br /> turbine sump enclosure-will-be patched with fiberglass. The exposed portions of the <br /> remain7hcturbine <br /> or line will be pneumatically feted-in_ ance with the manufacturer's <br /> guideli sump enclosure will be lake teste . <br /> Please feel free to call with any questions. <br /> Thank you, <br /> Travis Simmons <br />
The URL can be used to link to this page
Your browser does not support the video tag.