My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:I N C 0 N SUMP TESTER Equipment Resolution: 0.002" <br /> �. <br /> UD -47-8 UDC#9-10 UDC# UDC# <br /> UDC Manufacturer: Bendel Bendel <br /> UDC Material: Fiberglass Fiberglass — <br /> UDC Depth: 34" 34" <br /> Height from UDC Bottom to Top 12" 12" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 14" 14" <br /> Lowest Electrical Penetration_ <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested' 27 Penetrations 2"/Penetrations <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No ®NA Elves ❑No ®NA ❑Ycs ❑No ❑NA ❑Yrs []No ❑NA <br /> product and water)?* - — <br /> Turbine shutdown res once time N/A NIA <br /> Is system programmed for fail- ®NNo Elves ❑No ❑NA Elves ❑No ❑mt❑Yes ❑ <br /> safe shutdown?` <br /> Was fail-safe verified to be Elves ❑No ®NA Elves ❑No ®NA Elves ❑No [INA Elves ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 10 min 1D min <br /> starting test — <br /> Test Start Time: 11:10am 11:46am <br /> Initial Reading(P4): 5.7515" 6.9073" --- <br /> Test End Time: 11:25am 12:01pm <br /> Final ReadingRF): 5.7515" 6.9067" <br /> Test Duration: 15min 15min <br /> pPass/Fail <br /> Reading(RF-R,): 0.000" -0.0006" <br /> reshold or Criteria: +I-0.002" +1-0.002" _ . +/-0.002"t. ®Pass ❑FailPass ❑Fail ❑Pass ❑Fail ❑Pass ❑Failremoved fortestin ? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA properly replaced and ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> ctional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS ; <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.