Laserfiche WebLink
SLOPE CONCRETE AROUND ALL SLOPE CONCRETE AROUND ALI. SINGLE WALL STAGE li--, <br /> MANHOLE`> 1" RISE OVER 12" RUN 6 MANHOLES I" RISE OVER Ir RUN - DOUBLE WALL UNDERGROUND STORAGE TANKS <br /> SLOPE CONCRETE AROUND ALL Al\ VAPOR RECOVERY LINE <br /> 6 MANHOLES 1" RISE OVER 12" RUN (MARK PIPE 'TO SEPARATE PRODUCT' PIPING IYPORT'ANT: <br /> F--036 FROM PRODUCT LINES) TANKS ARE To BE INSTALLED AND TESTED PER CURRENT <br /> X7 MANUFACTURER'S INSTRUCTIONS, <br /> 55 4&0 - <br /> �@ <br /> GENERAL: <br /> EXCAVATE FOR, SET AND FILL, AROUND ALL UNDERGROUND <br /> C27 <br /> ...... TANKS AS SHOWN ON DRAWINGS AND SPEC I FICATIONS. <br /> FANKS ARE TO BE BALLASTED WITH GASOLINE OR WATER <br /> <1 44 AFTER INSTALLATION AND BACKFILL, <br /> 4 4 4 E' I> 4 4 4 WHERE rHIS DRAWING IS IN CONFLICT WITH THE LOCAL <br /> REGULATIONS, LOCAL REGULATIONS WILL SUF)ERCEDE THIS <br /> DRAWING IF THEY ARE MORE STRINGENT, <br /> 2� <br /> PFA GRAVEL AND BACKFILL: <br /> C4, -,/ 1 11 - I <br /> (4 ...... <br /> USE PEA GRAVEL (ROUNDED PARTICLES) WITH A MINIMUM <br /> DIAMETER OF <br /> 1/8" AND MAXIMUM DIAMETER OF 3/4', <br /> �2-C�)) <br /> STONE CRUSHINGS SHOULD BE WASHED AND FREE FLOWING, <br /> ANGULAR PARTICLE SIZE SHOULD BE BEl"WEEN <br /> I/F ' AND 1/2" <br /> AL AND MUST MEET ASTM C-33 PARAGRAPH 9,1 REQUIREMENTS, <br /> T7 <br /> NO MORE THAN 3% OF BACKFILL MATERIAL SF-iALL PASS <br /> THROUGH A NUMBER 8 SIEVE, <br /> 47 <br /> 4 7 ANfiiQEIN-(�, <br /> IF NECESSARY, rANKS ARE TO BE ANCHORED PER <br /> MANUFACTURER'S SPECIFICATIONS, CONSULT WITH OWNER'S <br /> LJ <br /> A <br /> FIELD REPRESENTATIVE TO DETERMINE IF ANCHORING IS <br /> TO BE INCLUDED, (STRAPS PROVIDED BY OWNER) <br /> PIPING TRENCH TANK TEST: <br /> TANKS MUST BE 'TESTED ACCORDING "TO CURRENT <br /> PLAN VIEW MANUFACTURER'S PROCEDURES, NOTE THAT PROCEDURE <br /> .......... <br /> VARIES BETWEEN MANUFACTURERS, <br /> i o" <br /> IMMEDIATELY BEFORE INSTALLATION, ALL UNDERGROUND <br /> A STORAGE TANKS SHALL BE TESTED ABOVE GROUND WITH <br /> SLOPE CONCRETE AROUND ALL 5 PSI AIR PRESSURE, <br /> CONTRACTOR TO FOLLOW MANUFACTURER'S 6) WNHQLES 1" RISE OVER 14'* RUN <br /> INSTALLATION INSTRUQjI,Q S TO INSURE <br /> AFTER INSTALLATION AND BACKFILL. TO TOP Of- TANK AND <br /> PROPER PL.ACEMEN- <br /> 000, INSTALLATION OF PIPING CONNECTIONS, ALL UNDERGROUND <br /> 0", <br /> 7 SPI <br /> 'R STORAGE TANKS SHALL AGAIN BE TESTED WITH AIR <br /> 5)6 PRESSURE AT 5 PSI WITHOUT PRODUCT AS BALLAST, <br /> ALL YARD PAVEMENT WORK, <br /> z <1 AFTER COMPLETION OF <br /> INCLUDING TANK PADS AND PUMP ISLANDS, A PETROTITE <br /> (OR APPROVED EQUIVALENT) TEST SHALL BE PERFORMED <br /> AT' THE EXPENSE OF THE OWNER ON THE TANK, <br /> PRODUCT <br /> :ZxJ AND VENT L-INES,(NiTROGEN TEST FOR VAPOR RECOVERY PIPING) <br /> CONTRACTOR SHALL COMPLETE THE TANK MANUFACTURER'S <br /> CHECKLIST AND SUBMIT THIS LIST TO THE OWNER'S <br /> REPRESENTATIVE, <br /> PIPING <br /> DEFLECTOR PLATE DEFLECTOR PLATE co PIPE: <br /> 3c TANK BOTTOM 0 TANK BOTTOM <br /> FIBERGLASS PIPE TO BE A,O. SMITH OR AMERON (BRANDS <br /> MAY NOT BE MIXED, INSTALL PER <br /> MANUFACTURER'S <br /> RECOMMENDATIONS), STEEL PIPE TO BE SCI-i, 40 GALV, <br /> PIPE JOINT SEAL: <br /> 7" GASOILA SOFTSET SHALL BE USED ON ALL STEEL- PIPE <br /> 74' 8" 8 8" <br /> FITTINGS AND THREADED METAL CONNECTIONS, <br /> ALL PIPE AND PIPING SHALL BE AS NOTED ON DRAWINGS, <br /> UINE OBSERVATION WELL DETAIL. F" SPACE PIPING IN TRENCHES 0 8" O.C. <br /> TANK VENTS, <br /> STAGE I VAPOR RECOVERY 110 = 1 "-ol# <br /> 2 2 ALL TA' <br /> 'TANK GAUGE DETAIL AND FILL PIPE DETAIL D E NOTE: <br /> =Z=== - - -AR , SPACE MONITOR DETAIL BACKFILL� <br /> ill v-011 2/2 2/2 NUMBER AND LOCATION OF LINE BACKFILL OVER PRODUCT AND VENT LINES IN TRENCH SHALL BE <br /> OBSERVATION WELLS PER PLOT PLAN, <br /> CLEAN COMPACTED PEA GRAVEL, PIPING SHALL BE LAID AND <br /> CONTINUOUSLY SUPPORTED ON 6" OF COMPACTED PEA GRAVEL, <br /> NO PIPING SHALL BE SUPPORTED BY BLOCKS, PLANKS <br /> DISPENSER OUTLINE <br /> 3/4" CONDUIT , <br /> (1) 1" T <br /> R OTHR DRIS. <br /> FOR SPEAKERFOR DISPNR *STAGE 11 VAPOR <br /> SLOPEre <br /> NOTE: <br /> RECOVERY LINE <br /> CONFIGURATION SHOWN IN 'THIS DETAIL IS FOR ALL PIPING MUST SLOPE TO UNDERGROUND TANKS, <br /> 3 1/8- 32 <br /> A GILBARCO "MPD--3" DISPENSER. - <br /> PIPE TESTING, <br /> FOR GILBARCO "ADVANTAGE", WAYNE "DL-390" <br /> AND "V-390" DISPENSERS REFER TO DRAWING C6 EACH PIPE SYSTEM, PRODUCT PIPING AND <br /> 15R-S2VR-G/W 212. VENT PIPING, SHALL BE PRESSURED TO <br /> 50 PSI AND MAINTAINED AT THAT PRESSURE FOR 24 <br /> **NOTE: HOURS BEFORE BACKFILLING AND FOR 24 HOURS <br /> INSTALL TRAFFIC BEARING PLATE TO PROTECT C2Tmm <br /> AFTER BACKFILLING, IF' NO PERCEPTIBLE CHANGE IN <br /> LATERAL PIPING DURING CONSTRUCTION, PRESSURE HAS OCCURED AT THE END OF THE TEST <br /> PERIOD, THE SYSTEM SHALL BE CONSIDERED INITIALLY <br /> ***NOTE: ACCEPTABLE, THIS SAME TEST SHALL BE PERFORMED <br /> PROTECT MAIN RUN PIPING UNTIL SLOPING PIPE �/4" CONDUITS—�//; AFTER BACKFILLING, <br /> REACHES THE MANUFACTURE'S MINIMUM BURY FOR DISPENSI�R "A7 SIDE <br /> DEPTH. GRIP BOX SENSOR <br /> OR 12 1 4 11/16" (�4) IF DOUBLE' WALL,, PIPE IS USED, THE SECONDARY PIPE IS <br /> TO BE PRESSURE TESTED AT 5 PSI FOR 60 MINUTES <br /> 42" BEFORE BACKFILLING AND 60 MINuTES AFTER BACKFILLING, <br /> 2 <br /> *GIL-BARCO MPD-3 01 <br /> CONCRETE <br /> STRAP VENT <br /> DISPENSER I <br /> PLAN DETAIL @ PUMP BOX LINES TOGETHER 4 CONCRETE USED SHALL MEET BP STANDARD SPECS., <br /> i o" DRAWING OP-S-1, SECTION 1 ,01, <br /> SUMP UNITS <br /> "Y' SIDE "A:' SIDE PAINT GRAY FIBERGLASS SUMP UNITS ARE TO BE SEALED PER <br /> 42" S' BUILDING WALL MANUFACTURE'S INSTALLATION INSTRUCTIONS, <br /> 6" <br /> (n4D6 9 15zi 11 7/8" 11 8 STAGE 11 VAPOR RECOVERY <br /> DISPENSER ISLAND - 4 1 11/16" <br /> PIPING UNIONS-,,-- --T REFER TO DWG, 15R-,-S2VR-G/W 2/2 FOR COMPILE <br /> fi BY GILBARCO IjLS, Lj <br /> 12" <br /> d C11(17- STRAP LINES <br /> 'T TO BUILDING 16 1991 <br /> le 7 <br /> 2 9 C6 0 <br /> CONCRETE SLAB (3 (Do J" <br /> Lz <br /> & "'IATES P <br /> Axa10 <br /> &0 <br /> C5O) lit- REIAIL MARKETING <br /> 90 GRADE BP OIL CQc <br /> DESIGN AND ENGINEERING <br /> z 200 PUBLIC, SQUARE <br /> T -7� z <br /> 38 <br /> 5 <br /> Ld 15 I J CLEVELAND, 01110 4 41 14 <br /> 0 C3)- SLOPE TO TANKS <br /> (6 2 4" <br /> 2" <br /> 10 <br /> 54 14 �"',� L- - -j :E <br /> 7 ._SAI 4 1/'4" <br /> Al2 <br /> _�C(63:3� ------�1- ----------,-- '41 <br /> DIA. HOLE FOR <br /> ENVIRON FLEXIBLE DOUBLE WALL FIBERGLASS U <br /> ENTRY 8 CK <br /> 9 COT <br /> (TYP,) FREE STANDING PROFILE PLAN VIEW WALL MOUNTED PROFILE TANK AND LINE DETAILS <br /> Al <br /> _141, - 1206 MARCH LANE <br /> '7 <br /> VENT RISER DETAILS CD <br /> 1 4pt 8" 8" 4 8 <br /> -7 015 - <br /> Az— 32" 10" <br /> ---Pl-b--------I- MADE BY: TAtTz <br /> PEA GRAVEL.-"... <br /> DATE 10--15-91 KED BY: <br /> 8" SIDE <br /> 7" 8" 8" 18" d --, I <br /> ------ CKD <br /> ........... ------ rlll� <br /> .......... <br /> PRODUCT PIPING AT DISPENSER ISLAND ELEVXFION DETAIL @ DRIP BOX ------------ ...........----------- ------ <br /> i <br /> -------------- <br /> 10 <br /> 4-1, <br /> 7 4 <br /> 0 <br /> lc:) <br /> 111 90"FS2 <br />