Laserfiche WebLink
EQUIPMENT DESCRIPTION SUPPLIED <br /> BY NOTES <br /> STAGE I RISER —1 _3" _FIBERG­LAS`S __ _ <br /> ISLAND MULTI PRODUCT DISPENSER PIPE (FRP) <br /> A.0, SMITH RED THREAD 11 OR CON-TRACTOR 1 . MAIN VAPOR RETURN LINE IS 3" DIAMETER FRP, <br /> AMERON DUALLOY 3000 USE 2" DIAMETER FRP PIPE BF-rWEEN MAIN RETURN <br /> FRP PRODUCTLINES -2" FRP VAPOR 2" FRP VAPOR FILL RISER UNE AND DISPENSER, <br /> RETURN LATERAL RETURN LATERAL 2 2" FIBERGLASS PIPE (FRP) <br /> SEE STAGE 11 TANK GAUGE RISER A.O. SMITH RED THREAD 11 OR CONTRACTOR 2� <br /> PIPING ISOMETRIC AMERON DUALLOY 3000 SLOPE VAPOR RE-TURN LINE NOT LESS THAN 1/8- <br /> ------- PER FOOT AND NOT MORE THAN 1/4- PER FOOT <br /> REINFORCED CONCRETE 3 8 FT, LONG DISPENSER HOSE- FROM DISPENSERS TO TANKS, NO AIR OR LIQUID <br /> OR ASPHALT PAVEMENT DAYCO PETROFLEX 2000 OWNER <br /> PEA GRAVEL-- FROM <br /> ARE ACCEPTABLE, <br /> BACKFILL 3" FRP MAIN VAPO R - 4 STAGE 11 VAPOR RECOVERY NOZZL.E-- <br /> 'TANK PAD RETURN LINE FROM EMCO WHEATON A-4001 (MPD-,-3 ONLY) OWNER <br /> NEW OR EXISTIING MPD INSTALLATION DISPENSERS 3 FIBERGLASS PIPE AND FITTINGS TO BE A.0. SMITH <br /> 5 HOSE RETRACTOR ASSEMBLY OR AMERON, FIT-TINGS MAY NOT BE MIXED, <br /> MAIN VAPOR RETURN LINEQ'lj POMECO HIMAST 73" OWNER <br /> 7 v CONTRACTOR 4� STEEL PIPE SHALL BE SCHEDULE 40 GALVANIZED, <br /> 6 GASOLINE CONNECTION HOSE STEEL FITTINGS SHALL BE CLASS 150, USE GASOILA <br /> b§t KaI5' <br /> DAYCO <br /> -PRODUCT 1 SOFT SET FOR PIPE JOINT SEAL, <br /> 8 BREAKAWAY COUPLING— <br /> ca LINES 3" FRP VAPOR EMCO, WHEATON COAXIAL. "SAFEBREAK" CONTRACTOR <br /> 2 <br /> RETURN LINE 5, VAPOR RECOVERY PIPING SHALL BE LAID AND <br /> Xyl MODEL #A4019--002 <br /> X CONTINUOUSLY SUPPORTED ON A 6" BEDDING OF <br /> ---------- <br /> IPE NIPPLE <br /> N <br /> PEA GRAVEL, TRENCHES SHALL BE BACKFILLED <br /> SCHEDULE 40 GALVANIZED CONTRACTOR COMPLETELY TO THE UNDERSIDE OF PAVING WITH <br /> 11(o 2" FRP PCA GRAVEL. <br /> 10 l STEEL UNION CONTRACTOR <br /> VENT LINE NO PIPING SHALL BE SUPPORTED BY BLOCKS, <br /> 0 11 1" STEEL UNION <br /> 7 -777,77 PLANKS OR OTHER DEBRIS. <br /> 12 1 1/2" X 3/4" GALVANIZED <br /> xx 2" FRP VAPOR EXTRACTOR REDUCER NPT FEMALE X NPT MALE CONTRACTOR <br /> ---------- <br /> RETURN LATERAL FITTING 6, CONNECT UNDERGROUND STAGE U PIPING TO MPD <br /> CONTRACTOR--- -_ -- -,- <br /> . 3" FRP VAPOR , Ij:ap 13 3/4' <br /> DISPENSER PIPING DURING CONSTRUCTION FOR <br /> RETURN LINE CON-TRACTOR <br /> 8pl 8" 7" BOTH IMMEDIATE AND FUTURE USE, <br /> t t SUBMERGED PUMP 5 3/4� STEEL UNION CONTRACTOR <br /> CONTAINMENT SUMP <br /> 36' SINGLE OR DUAL 16 STAGE 11 VAPOR RECOVERY NOZZLE-- 7, FOR SINGLE AND DUAL DISPENSERS, STUB UP THE <br /> 11PI 7LIED <br /> �TION �y <br /> z_7 <br /> PF D I <br /> L I�o <br /> NES <br /> DISPENSER EMCO WHEATON A-4005 (ADVANTAGE ONLY) OWNER PIPING AND CAP OFF WHEN PIPING WILL NOT BE <br /> ____t1l) --------------- USED IMMEDIATELY, <br /> 2" FR�P VENT LINES 17 12" SPACER HOSE- <br /> OWNER <br /> TO VENT RISERS ISLAND DAYCO PETROFLEX 2000 MODEL #7574 8. SAFETY BREAKS ARE TO BE INSTALLED, <br /> PIPING TRENCH DETAIL NEW OR EXISTING SINGLE DUAL INSTALLAflON STAGE If PIPING ISOMETRIC 1B PUMP HOLD DOWN B-O- --F"-O--R—M—EX,----''----O,WNER--', <br /> FRP PRODUCT LINES OR MORGAN <br /> 9, T° 'TI F <br /> G �RDQL QRL <br /> NO SCALE <br /> 19 DISPENSER DRIP BOX--WESTERN„ <br /> FIBERGLASS OWNER <br /> AIR PRESSURE TEST THE STAGE Ir VAPOR RETURN <br /> LINE FOR ONE HOUR AT 50 PSI, BRUSH A SOAP <br /> STAGE 11 PIPING PLAN1 2 3 NOTE: <br /> AND WATER SOLUTION ON EVERY FIl-TING AND <br /> NO SCALE REFER TO DRAWINGS 15-CA 1/2 AND 2/2 FOR INSPECT FOR AIR BUBBLES, <br /> EQUIPMENT DESCRIPTION NOT SHOWN THIS SHEET, <br /> AFTER BACKFILLING THE TRENCHES, BUT BEFORE <br /> PAVING AND SETTING THE DISPENSERS, PERFORM <br /> -THE "PRESSURE DROP DURING FLOW TEST" AND <br /> CCU7 <br /> THE "BLOCKAGE TEST" ACCORDING TO THE <br /> -, <br /> J7 REQUIRED LOCAL PROCEDURES, <br /> RECORD BACK PRESSURES MEASURED DURING BOTH <br /> TESTS WITH FLOW RATES OF 60 CFH AND 100 CFFl <br /> ON THE DATA SHEETS PROVIDED, <br /> BACK PRESSURE MAY NOT EXCEED 0,45 INCHES OF <br /> C:l rand ran rond <br /> WATER AT A FLOW OF 60 CFH OR 0.95 INCHES <br /> rand ran <br /> rand rand ESE 1=9 EM, OF WATER AT A FLOW OF 100 CFH. IF LIQUID <br /> BLOCKAGE IS INDICATED, MAKE NECESSARY REPAIRS <br /> (4 <br /> OR ADJUSTMENTS TO ELIMINATE THE BLOCKAGE, <br /> "IN <br /> REPEAT THE "PRESSURE DROP DURING FLOW TEST" <br /> AND THE "BLOCKAGE TEST" AFTER COMPLETION OF <br /> 0 THE YARD WORK AND INSTALLATION OF DISPENSERS. <br /> SUBMIT COMPLETED TEST DATA SHEET'S TO THE <br /> @6 FIELD ENGINEER FOR APPROVAL, <br /> 171 <br /> to z <br /> 5 <br /> 10. STAGE 11 FLEXIBLE CONNECTOR TO BE CONTAINED <br /> WITHIN DISPENSER DRIP BOX. FOR SITES WITH NO <br /> CONTAINMENT BOX, THE FLEXIBLE CONNECTOR MUST <br /> BE ISOLATED USING AN ISOLATION SLEEVE. <br /> 00 <br /> ELEVATION ELEVATION - <br /> IL MPD-3 GI(BARCO ADVANTAGE MPDI NGLS & DUAL DISPENSERS <br /> 1/2" 1 0" <br /> X 30 FRP VAPOR <br /> 3" FRP VAPOR <br /> RETURN LINE RETURN LINE <br /> ot <br /> ISLAND DISPENSIR ISLAND & DISPENSER <br /> ISLAND & DISPENSER <br /> z z <br /> uj uj <br /> 0 <br /> a. CL <br /> V) ------ <br /> " <br /> "Y'. SIDE 2" ",RP VAPOR 3 2 FRP VAPOR, S I D E 3" FRF' VAPOR �o <br /> 3/4CONDUIT RE RN LATERAL. RETURN LATERAL, RE-TURN LINE <br /> FOR SPEAKER to ui <br /> 3 1/8" 7' PRODUCT LINES 2" FRP VAPOR -'_ <br /> z z C) Z <br /> "I-,\ Z uj <br /> mo, 18 RE­,T'URN LATERAL <br /> P <br /> PRODUCT LINES (A <br /> ------- (1) 1" CONDUIT <br /> FOR DISPENSER <br /> 4 1 111 3/4!' 5_1 <br /> (1) 1- CONDUIT -1­� 3/4- CONDUIT 14 (l)--l" CONDUIT <br /> FOR DISPENSER FOR SPEAKER <br /> "A" SIDEA7 SIDE <br /> (J BOX SIDE) <br /> (J B OX SIDE) <br /> 4", <br /> PIPING PLAN <br /> PIPING PLAN PIPING PLAN <br /> GILBARCO MPD— <br /> GILBARCO ADVANTAGE MPD SINGLE & DUAL DIPENSERS <br /> i/z,=v_o" 1/2"=l '-Op# rem. pxzam <br /> 3" 42" 3" <br /> Pp 42" 3'v 21" <br /> 7" 7-1 7" B P OIL COO <br /> 9 ZZ 15" 13 1 2" 18 ll � 5" <br /> b 1 7/8" 8 5 1 STAGE 11 PIPING (15) @3 <br /> STAGE 11 PIPING <br /> CONNECTION KIT CONNECTION KIT PIPING UNIONS <br /> PIPING UNI <br /> ONS [—A IBSIODX11] 1,0sigRETAIL MARKETING <br /> BY ILRco '1� BY GILBA,RCO BY GILBARC0 k SIDE BY GILBARCO A <br /> J_Box J-pox <br /> J_Box DESIGN AND ENGINEERING <br /> 0 <br /> 1 h, 200 PUBLIC SQUARE <br /> F_ CLEVELAND, OHIO 44114 <br /> "VO <br /> (l)--l" CONDUIT 15 <br /> FOR DISPENSER,/ " F' CALIFORNIA <br /> 102 <br /> SAWCUT 4 1/4!' <br /> STAGE 11 VAPOR RECOVERY <br /> CONDUIT DIA, HOLIE FOR SAWCUT 4 1/4 <br /> A <br /> FOR DISPENSER ANT VIRON( (OOT XIBLPE�) N�IR� <br /> FRRY BTYEN FLEXIBLE <br /> ENTRY BOOT (TYP,) 7" <br /> U000, <br /> to DWG. NO. : 15R--S2VR--CA 2/2 <br /> _T <br /> BY­: ­_AVCF <br /> SCALE:_iz�nfm <br /> z <br /> DATE. 4--25--91 CHECKED BY: <br /> —J DATE DWN CKD <br /> STAG E II PIPING CONNECTION /A\ STAGE 11 PIPING CONNECTION STAG E I1 PIPING CONNECTION <br /> GILBARCO MPD-3GILBARCO ADVANTAGE —------ <br /> zfiA MPD SINGLE & DUAL DISPENSERS <br /> I" = v–o" _l_ = 1 , o" .,__._._.-_m.._,.-_...____.»_..._._. <br /> 15S2VRCA <br />