My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jj �� //LIVED <br /> F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used onlfdt ntEfy 1.' <br /> 11 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. EEC 3 12015 <br /> Compleft the followi checklist: KIRAP1 <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground n;:P4RTMFN TL <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> C Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe In and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): , Check this box if LLDs are not installed. <br /> Complete the followingchecklist: <br /> X Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> ❑ WA that apply) Simulated leak rate: x 3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> X Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑ No- Was the testing apparatus property calibrated? <br /> ❑ Yes ❑ No' For mechanical LLDS,does the LLD restrict product flow if it detects a leak? <br /> X N/A <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off rf the LLD detects a leak? <br /> WA <br /> x Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off'rf any portion of the monkoring system malfunctions or fails <br /> N/A a test? <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> CN/A <br /> X Yes No' Were all hems on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.