Laserfiche WebLink
A I B I C D E F <br /> 5UOYANCY CALCULATIONS FOR 15, 000 COAL. DOU5LE WALL TANK <br /> SAMPLE BUOYANCY CALCULATI245 F=CJR 15, 0(D0 COAL, DOUBLE WALL_LNC?ERGR0? Q TANK SAMPLE BUOYANCY CALCULATIONS W/ DEADMEN ANCHORS <br /> FINISH 30. 08' 12. 08' <br /> SURFACE 0 1 <br /> 0 2 MANWAY (TYP) 2, 1' 10. 08' !' <br /> " CONCRETE SLAB BACKFILL COLUMN aK'� °`.i-� !`. �� -b !`�ti** r,:f,� ���4 ��; �•4��' �,��.e <br /> f \ (TYP BOTH SIDES) <br /> 4. 50' V/zS. 00' BURY <br /> CONCRETE DEADMEN <br /> A 110 1' x i' x 28' LONG b' THICK REINF_ PEA CsRAVEL <br /> H ■ 9. 54' CONC. SLAB_ <br /> 5. 04' <br /> — U.G. FUEL TANK <br /> -� 10. 08' - - (TYP) <br /> 1 INSTALL PRE-ENGINEERED <br /> SHORINCs SYSTEM ON Al <br /> BIDES <br /> } I <br /> i . <br /> I. 15ACKFILL COLUMNS i <br /> L - 26. 08' 1' x 14. 58' HIGH x 28' LONG 408 C. F. <br /> INSTALL NEW DEADMEN <br /> EVEN WITH OUTSIDE EDGE <br /> CALCULATIONS OF TAI," <br /> BASIS. W = 408 C. F. x 2 x 60 L55 / C. F. <br /> 1. WATER CABLE AT BOTTOM OF CONCRETE BLAB (}) W,, ■ 48, 989 LBS. <br /> 12' PEA GRAVEL !] <br /> 2. SUBMERGED WEIGHTS : 2. CONCRETE DEADMEN BED <br /> MATERIAL WE1CxNT 1' x 1' H1Cs1-4 x 28' LONCs 28 C. F. <br /> FILTER FABRIC LINE <br /> Milli <br /> PEA GRAVEL 60_ @POUNDS PER CUBIC FOOT <br /> CALCULATIONS DEADMEN ANCHO 241 3 - CONT. <br /> 6 <br /> REINFORCED CONCRETE 81. POUNDS PER CUBIC FOOT ' <br /> WATER i. 48 GALLONS PER CUBIC 1=001 FULL LENGTH OF <br /> 2 WATER 62. 4 POUNDS PER CUBIC FOOT Wcv ■ 28 C. F. x 2 x 60 LBS / C. F. 2 - 06 CONT. TANK + 2 -0 <br /> TYP. BETWEEN ANY 2 <br /> Wm 3, 36@ LBS. AD.)AGENT TANKS <br /> 3_ WEIGHTS IN A1R <br /> MATERIAL WEIGHT 3. TOTAL ADDITIONAL DOWNFORCE <br /> PEA GRAVEL 120 LBS. PER CUBIC FOOT F. <br /> REINFORCED CONCRETE 150 LBS. PER CUBIC FOOT TYPICAL SECTION <br /> TANK 23, 200 LBS. <br /> CALCULATIONS <br /> 12E5CRIPTION CALCULATIONS %jMMA�•?Y <br /> F, 48, 989 LB.g. + 3, 360 LBS. <br /> I. REFLECTED AREA : Ai = 10. 05 x 26. 08 = 263. 0 S. F. (}) FA ■ 52, 349 LBS. <br /> 2. I719ELACED VOLUME : V - 700. 08)2/4 C. F. x 26. 08 - 2, @81' C. F. <br /> 4. FACTOR OF SAFETY WITH ANCHORS, <br /> 3, UPLIFT FORCE : F u - 62. 4 LBS / C. F. x 2, 081 C. R - 129, 868 LBS. (1) Fug 129, 868 LBS. <br /> 4. F. 5.== Pw + PA ■ 159. 636 + 52. 34g - 1. 63 OK <br /> Fu 129, 868 <br /> A) TANK WEIGHT (PER MFR. SPECS.) W , ■ 23, 200 LBS. N) W, = 23, 200 LBS. <br /> B) 6' CONCRETE SLAB = 150. 00 LBS. / C. F. <br /> SLAB AREA A, - A , = 12. ADB x 30. 08 363 S. P_ <br /> SLAB WEIGHT EXCLUDING REINFORCEMENT W e ■ 150 x 363 x .50 ■ 21, 252 LBS. (0 W4 ■ 21' 2E'2 LBS. <br /> C) WEIGHT OF PEA GRAVEL OVERBURDEN VOLUME <br /> FROM CENTER OF TANK TO CONCRETE SLAB : <br /> (USE 5'-m' MIN. BURY DEPTH TO FINISI.1 SURFACE <br /> 4'-6' TO SLAB BOTTOM WITH SUBMr=WsED WEIGHT V,= (H/3) (Al + A,+A A ) - (0. 5VT + Y„) <br /> OF PEA GRAVEL ■ 60 LBS. / C. F.) Vs■ (9.54/3) (263 + 363 + 263 x 363 ) - ((0. 5 x 2, 081) + 113) <br /> OVERBURDEN VOLUME FROM CENTER OF TANK TO GONG. SLAB Wp= 1820 C_ F. x 60 LBS. / C. F. ■ 10c3, 184 LBS. N) W, = 105, 154 LBS. <br /> V r = VOL. OF TANK <br /> V r - VOL. OF MANWAY F, - 23, 200 + 2-1, 252 + 10c3, 184 = 159, 6036 LBS. (j) F,, ■ 159, 636 LBS. <br /> TOTAL HOLD-DOWN FORCES : FH = (A + 5 + C) 1=HD■ F„- Fu ■ 159, 636 - 129, 868 a 29„ 7(o8 LBS. l}) EHD - 29, T68 LBS. •• •.' , .. . x. -- <br /> 5. EXCESS HOLD DOWN FORGES EHD: ' <br /> 6. FACTOR OF SAFETY EXCLUDING ERICTIg2Sm <br /> F. S., • P" 159, 636 / 129, 868 - I. 23 MARGINAL <br /> 3 Pu ------------ -------------- ---------- 1/4' x 3' HOT DIP GALVANIZED FLAT BAR HOLD DOWN STRAP 3 <br /> 7. CONCLUSION: USE 6' THICK, 12. 08' x 32. 08' CONIC. SLAB AND I I AS PROW-DED BY TANK MANUFACTURER. BRUSH WITH <br /> TANK BURY DEPTH 5'-@` TO FINISH SURFACE ; FIBERGLASS RESIN, THEN WRAP WITH 30 MIL BLACK PIPE WRAP <br /> I I TAPE. INSTALL OVER 6' WIDE EPDM RUBBER ISOLATION STRAP. <br /> I (AVAILABLE FROM STEEL TANK INSTITUTE MEMBER TANK MANUFACTURERS) <br /> NOTE : DUE TO SITE SPECIFIC VARIABLES, BUOYANCY CALCULATIONS MUST I 1 I <br /> BE CALCULATED FOR EACH INDIVIDUAL 51TE BASED ON ACTUAL CONDITIONS. <br /> I I 1` DIA HOT DIP GALVANIZED ROUND BAR W / 12' LONG THREAD t 2 NUTS <br /> I I AS PROV DED BY THE TANK MANUFACTURER BRUSH WITH FIBERGLASS RESIN <br /> I 1 THEN WRAP WITH 30 MIL BLACK PIPE WRAP TAPE. <br /> I I <br /> ---------- ------- ------ — - - - ------ <br /> GENERAL NOTES: DEAPtl TEN / ANCH01RINC; INSTALLATION <br /> !_ TANK ANCHOORING SHALL BE INSTALLED ONLY WHEN I_ CONTRACTOR 15 TO INSTALL DEADMEN IN SUCH A MANNER THREAD ROD ANCHORS ATTACHED TO 06 REBARS TYPICAL OF ALL <br /> APPROVED BY UNOCAL ENGINEER AND AS REQUIRED AS TO NOT REQUIRE PERSONNEL IN THE BOTTOM OF THE <br /> BY LOCAL AGENCIES. IT IS REQ-OMMENDED THAT EXCAVATION, THESE INSTALLATIONS ARE INTENDED TO BE LOCATIONS. INSTALL WITH 'L' LECs UNDER REBAR 4 TIE-WIRE <br /> DURING TAMC SETTING, CONTRACTOR MUST PROVIDE PROTECTION ON ENDS OF TANKS BE ANCHORED FOR INSTALLATIONS WHERE ONLY A GUIDE. CONTRACTOR nW COMPLY WITH ALL SECURELY M PLACE <br /> I' ANCHOR BOLTS TO ELIMINATE THE POSSIBILITY OF DAMAGING THE f�P COATING <br /> GROUNDWATER IS LESS THAN 16 FEET BELOW CsRADE. APPLICABLE 03HA OR GAL/OSHA R4`GULATIONS_ I0'-0" 9'-6' Im'-@' <br /> go- <br /> OF THE TANK PROTECTION MAY CONSIST OF 1' HOSE OR REBAR PROTECTIVE 2. FOR HOLD-DOWN STRAP LOCATIONS, REFER TO 2. CONCRETE DEADMEN SHALL BE PRECAST ABOVE GRADE WITH �00� <br /> CAPS AND PIPE WRAP TAPE AT CONTRACTOR'S OPTION. IN ADDITION, IF TANK DETAIL HEREON ANCHOR RODS IN PLACE, ON CENTERS (AS SHOWN), A MINIMUM <br /> EXCAVATION 15 APT TO FILL WITH WATER FROM ANY SOURCE, TANK 15 TO BE O'F -1 DAYS PRIOR TO INSTALLATION. 8'-0' 8'-0' # 8'-0' m. <br /> J <br /> BALLASTED WITH GLEAN WATER At NO TIME IS BALLAST WATER LEVEL IN TANK 3. 5010 GALLON WASTE OIL TANK, WHEN INSTALLED MODEM <br /> TO EXCEED LEVEL OF WATER (OR BACKFILL) IN TANK EXCAVATION. AFTER PER UNOCAL. STANDARD PLANS AND SPECIFICATIONS, 3. PROPERLY POSITION DEADMEN IN THE HOLE (ON TOP OF WELD INCA <br /> INSTALLATION, ALL WATER 18 TO BE REMOVED BY PUMPINCs WITH SUCTION HOSE AT YIELDS A SAFETY FACTOR OF 3. 62 : 1, THEREFORE FILTER FABRIC) PRIOR t0 ANY BACKFILL.- <br /> NO SUPPLEMENTAL ANCHORS ARE REQUIRED. <br /> LOW END OF TANK. AFTER WATER 15 REMOVED, CIRCULATE DRY COMPRESSED AIR 4- PLACE A 12' THICK BED OF PEA GRAVEL AND GRADE SMOOTH. <br /> THROUGH TANK OPENINGS TO DRY TANK INTERIOR ALL TANK OPENINGS MUST BE 4, SHORINCs WILLB�CUIRE© FOR ALL PROJECTS 5 SET TAWS ON PEA GRAVEL BED. <br /> LEFT OPEN DURING THIS DRYING OPERATION. CONTRACTOR MUST PROVIDE REQUIRING AINCHORINCs. (ALL WET HOLE CONDITIONS) <br /> CERTIFICATION THAT THE TANK WAS DRIED COMPLETELY AND IS CLEAN ' DO NOT 6. BACKFILL TO CENTERLINE OF TANKS. <br /> USE TUR51NE PUMP TO EMPTY WATER IN TANK <br /> 1. POSITION ANCHOR STAPS AND ATTACH TO ANCHOR RODS. <br /> TIGHTEN TO OBTAIN A SNUG PIT. <br /> 8. BACKFILL t0 TOP OF TANK <br /> o�srr:or ui PNi�rTs��_.___ -- Rev, c�co. ,�'o <br /> 4 I REV DATE ; -� REVISED 13EMING EARLIER 111E BY BY By APPROVAL RECORD APPROVALS 4 <br /> c UNION OIL OF CALIFORNIA, d b a UNOCAL, 1994 t- MILESTONE DATE APPROVAL DRAWN BY TAIT <br /> THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN IS ISSUED FOR C.U.P, , ; UNDERGROUND GASOLINE STORAGE TANK COUNTER <br /> PROPRIETARY TO UNION OIL OF CALIFORNIA (UNOCAL) AND HAS �� � WD ! BUOYANCY DETAILS AND CALCULATIONS <br /> BEEN FURNISHED IN CONFIDENCE AND ARE SUBJECT TO THE - ! ISSUED FOR PLAN CHECK �'EMAL M''� ' ' DATE, <br /> TERMS OF A SEPARATE SECRECY AGREEMENT BETWEEN UNOCAL . - "PPD I <br /> AND THE RECIPIENT. THE RECIPIENT IS NOT TO COPY, DUPLICATE — — 1ssuED FOR GEN. 131D <br /> 1 DAT, 2-8-95 s <br /> cLe� urur a�r�} I � 'aw�w�Nc No. ��v No. <br /> OR DISCLOSE THE CONTENTS TO ANY PERSON OR ENTITY EXCEPT — 1ssuED FOR CONSTRUCT.. ir <br /> AS EXPRESSLY AUTHORIZED BY SAID AGREEMENT OR BY UNOCAL -Y {� I UNOrAL*DATE J <br /> 0= SHE' <br /> sGUF NONE <br /> IN WRITING. � � RECORD DRAWING _ ! t ,�N fTIGINEER} <br /> A B V D E F K:\UN\UN1682\JDWGS\ <br />