My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:07 PM
Creation date
11/8/2018 9:43:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2003 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
6/24/2016 3:46:18 PM
QuestysRecordID
3117371
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-05-2007 09:40 Service Station Systems 408 938 8888 P.04 <br />Monitoring System Certification - P. 3 of 3 <br />1-r <br />Site Address: 2132 Mariposa Rd. @ Farmington Rd. Date of Testing/Servicing: 6/4/07 <br />F. In - Tank Gauging / SIR Equipment: <br />IH Check this box if tank gauging is used only for inventory control. <br />a Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring, <br />r'nm ntafw ♦hw rnlinwina chechli*t- <br />0 Yes <br />o No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />D Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />0 Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />0 Yes <br />0 No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />0 No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLD's are not installed. <br />* in Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />yYes <br />11 No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />Cl N/A <br />(Check all that apply) Simulated leak reate: R 3 g.p.h. (1.); 0 0.1 g.p_h. (2.); 0 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />• Yes <br />0 No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />CK Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />13 Yes <br />0 No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />0 N/A <br />0 Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />Q N/A <br />0 Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />0 N/A <br />or disconnected? <br />0 Yes <br />0 No* <br />For electronic LLD's. does the turbine automatically shut off if any portion of the monitoring system <br />M N/A <br />malfunctions or fails a test? <br />0 Yes <br />❑ No* <br />For electronic LLD's. have all accessible wiring connections been visually inspected? <br />N/A <br />M Yes <br />I ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.