Laserfiche WebLink
JUN -26-2007 16:06 Service Station Systems <br />'I <br />5. SECONDARY PIPE TESTING <br />4b0 IJ30 0000 r.u, <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />Other (,Spec) <br />Test Method Used: 0 Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges <br />Piping Run # 1 Piping Run # 2 <br />Equipment Resolution: 0.5% of span <br />Piping Run # 3 Piping Run At 4 <br />Piping Material: <br />Gcatlex <br />Geoflex <br />Geoflex <br />geoflex <br />Piping Manufacturer. <br />Environ <br />Environ <br />Environ <br />environ <br />Piping Diameter: <br />2" <br />2" <br />2" <br />2" <br />Length of Piping Run: <br />75' <br />70 <br />65' <br />70' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Gasoline <br />Gasoline <br />Method and location of <br />i in -run isolation: <br />Reducer Boots/Fittings <br />Reducer BwWFittings <br />Reduar Boots/Fittings <br />Reducer Boots/F9nings <br />Wait time between applying <br />pressure/vacuum/water and <br />startingtesti <br />10 minutes <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8:30 am <br />8:30 am <br />8:30 am <br />8:45 am <br />Initial Reading (Ri): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />9:30 am <br />9:30 am <br />9:30 am <br />9:45 am <br />Final Reading (Rr): <br />5 psi <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hr. <br />1 hr. <br />1 hr. <br />I hr. <br />Change in Reading (RF-Ri): <br />none <br />none <br />none <br />none <br />Pass/Fa: Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />0 Pass Fait <br />® Pass Fail <br />El Pass Fail <br />O Pass Fail <br />Comments— (include information on repairs made prior to testing, and recommended follow -cep for failed tests. <br />1 -87 product to dispenser _ <br />2 -89 product to dispenser <br />_ <br />3 -91 product to dispenser — <br />4 -Diesel product to dispenser <br />