Laserfiche WebLink
SWRCB, January 2002 page 2. <br />9. SILL/OVERFILL CONTAINMENT BeXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />Spill Bucket Manufacturer <br />Other (Specify) <br />❑X <br />Industry Standard <br />F—] Professional Engineer <br />Test Method Used: <br />Pressure <br />E]Other (Specify) <br />0 <br />Vacuum <br />F_X] Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box# 1-87 Spill Box # 2-89 Spill Box# 3-91 Spill Box # 4 -DIESEL <br />Bucket Diameter: <br />1 11" <br />11" <br />11" <br />11" <br />Bucket Depth: <br />1511 <br />15 " <br />1511 <br />15'. <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />SMIN. <br />SMIN. <br />5MIN. <br />5MIN. <br />Test Start Time: <br />9:10 <br />9:10 <br />9:10 <br />9:10 <br />Initial Reading(Rf ): <br />11" <br />11" <br />11" <br />11" <br />Test End Time: <br />10:15 <br />10:15 <br />10:15 <br />10:15 <br />Final Reading (RF ): <br />ll" <br />11" <br />11" <br />0" <br />Test Duration: <br />60MIN. <br />60MIN. <br />60MIN. <br />60MIN. <br />Change in Reading (R F - Rt) <br />0 " <br />0" <br />01. <br />11 <br />Pass/Fail Threshold or <br />Criteria: <br />PASS <br />Fail:. <br />PASS <br />PASS <br />FAIL <br />Comments - (include information on repairs made prior to testing, and <br />USA GAS, SHE SAID SHE WOULD SEND MAINTENANCE OUT FOR REPAIRS ASAP. <br />