My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2003 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:07 PM
Creation date
11/8/2018 9:43:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2007
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2003 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2007
QuestysRecordDate
6/24/2016 3:46:18 PM
QuestysRecordID
3117371
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />✓ ENVIRONMENTAL HEALTH DEPARTMENi- <br />304 East Weber Avenue, 3`d Floor, Stockton, CA 95202-2708 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehil <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />l9SA h�S S��tL7/vJ <br />o Z22 <br />Inspection Da <br />7� v� <br />Facility Address: <br />2 13 2 M,Qr <br />ServicJT80t <br /><< <br />❑ Caldwell System ❑ Other <br />❑ electronic Serial #: <br />Spill bucket ❑ minimum 5 gallon <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Certification #: <br />Manufacturer Training: <br />Val er /Ln) L <br />❑ <br />❑ mechanical Model: <br />Spill bucket ❑ minimum 5 gallon <br />rpm W-5 <br />SERVI E <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ Caldwell System ❑ Other <br />❑ electronic Serial #: <br />Spill bucket ❑ minimum 5 gallon <br />❑ line test programmed <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />Spill bucket ❑ minimum 5 gallon <br />❑ electronic Serial #: <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ line test programmed <br />❑ Caldwell System ❑ Other <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />psi <br />❑ electronic Serial #: <br />minutes <br />❑ line test programmed <br />Secondary piping testing at: <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />minutes <br />❑ fail safe Serial #: <br />Secondary containment repairs for: <br />❑ NA <br />UDC(s) Piping <br />sensor <br />y� <br />❑ positive shutdown Model: <br />Cold start of monitoring panel <br />Mail safe Serial #: <br />Corrosion protection <br />❑ NA <br />Other: see below <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />rpm W-5 <br />SERVI E <br />L ZU NU af\ <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />r)e v\,j <br />❑ Caldwell System ❑ Other <br />ori tl <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />EHD 1Qspector <br />❑ Caldwell System ❑ Other <br />Receive y: <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment repairs for: <br />❑ <br />UDC(s) Piping <br />Sump(s) UST(s) <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />_ L °I - <br />L ZU NU af\ <br />a , w <br />1 KA -40-\, . NhelC �S <br />l be 4-� <br />r)e v\,j <br />i U e4av <br />ori tl <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD 1Qspector <br />- <br />Receive y: <br />Titled <br />e— <br />M <br />EHD 23-04 <br />1/3/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.