My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECEIVED <br /> FILL SUMP TESTING Nov 2 3 2016 <br /> DEPARTMENT <br /> Test Method By: o Manufacturer • Industry Standard Professional Engr o Other(see below) <br /> Test Method Uses: o Pressure vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Tank#1 Tank IN 2 Tank#3 Tank#4 <br /> Tank product 87 Gasoline 89 Gasoline 91 Gasoline Diesel <br /> Sump material FRP FRP FRP FRP <br /> Sump diameter (inches) 48 48 48 48 <br /> Sump depth (inches) 60 63 59 59 <br /> Height from tank top to highest 18 18 18 18 <br /> piping penetration (inches) <br /> Height from tank top to lowest 17 18 18 18 <br /> electrical penetration (inches) <br /> Method of sump attachment to tank Tank Collar Tank Collar Tank Collar Tank Collar <br /> Condition of sump prior to testing Dry Dry Dry Dry <br /> Portion of sump tested Entire Entire Entire Entire <br /> Is system programmed for fail-safe operation? Unknown Unknown Unknown Unknown <br /> Was fail-safe verified to be operational? N/A WA N/A N/A <br /> Was sensor removed for testing? _Yes Yes Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes Yes <br /> Depth of water level from tank lop (inches) 22 22 22 23 <br /> Wait time for water level to stabilize (hr:min) :05 :05 :05 :05 <br /> Test start time 11:43 AM 12:25 PM 12:25 PM 11:43 AM <br /> Initial Probe Reading 6.8022 3.9959 3.5281 4.7130 <br /> Test end time 11:58 AM 12:40 PM 12:40 PM 11:58 AM <br /> Final Probe Reading 6.8026 3.9964 3.5280 4.7129 <br /> Test duration (hr:min) 0:15 0:15 0:15 0:15 <br /> Change in water level it 0.0000 inches) 0.0004 0.0005 -0.0001 -0.0001 <br /> Pass/Fail threshold (±0.0020 inches/I Hr.) 0.0020 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> ® 2016 Walton Enginxring,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.