Laserfiche WebLink
-S WRCB,January 2002 _� Page_14 of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer O Industry Standard ro&%s ionat Engineer <br /> ❑Other(Specify) <br /> Test Method Used: D Pressure -"A0 Vacuum ydtnstatic <br /> O Other(Spect J - <br /> Test Equipment Used: (' Jam- vJej .Lrt diep4K Equipment Resolution: . ted Z.)— <br /> 'i., '.Irv ,,ti �: � n-�j r • - •..ra.- . .,. ;. ::: ,:,•=:... t•. <br /> Sump# Sump#•Z• -4Sump# amp#` <br /> Sump Diameter: q2_11 Oe44,0 +•J 2"DG <br /> Sump Depth: -7s;1 + <br /> Stump Material: d ?1 <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 8 <br /> Condition of sutmp prior to testing: 01f Dr <br /> Portion of Sump Tested' .)4-A+'),Lnw- IV++ Wg•/W t.a.4. !"j" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both.: NVIYes . ❑No• O NAes ❑Nn, DNA ❑Y O ONA D <br /> 7 Yes' No DNA <br /> roduct and water - � ` <br /> Turbine shutdown response time ,va�e16,t.ta j pidfefasclet ' <br /> Is system programmed for fail-safe 1�M O No O NA ea O No DNA 0 Yea No ❑NA 13Yes IDo ONA <br /> sbuwown?' <br /> Was fail-safe verified to be ayes,. ❑NA byes dNA 4Y No ONA ' ❑YesNA <br /> e[atianal?' r;�'10 :.:. ClO ' <br /> Wait time betweoa lying . : . . :,r :. <br /> PM urelvacuu ater d starting ... <br /> - test:. <br /> Test Start Time: <br /> Wtial Reading(Rt): 404& rlt 1�4 <br /> Test End Time: . . C2:.�•/):,. .:;.,... ..., y.. sem..:,.. . . . . <br /> Final Reading(RF): k-Cole Cp N1f'C.sG(o <br /> Test Duration: P t ww./-,I <br /> Change in Resding(Itr-Rt): l:f o cit. Jtl G <br /> PasslFail Threshold or Criteria: <br /> Test Result: urpafil ❑FaB RTM R Fall O Pass ❑ an 01 as D 11 <br /> Was sensor removed far testing? as D No D NA es ONo DNA Yes ONo 11 es ONo D A <br /> Was sensor properlyreplacedasd Yes ONo RNA Yes 0 N DNA Oyes ONo ❑ 1 CjYes ONO ON <br /> verified functional after testin 7 <br /> Commen fa—Enclude information an r airs made prior 10 resrinq•,and recommended fallow-up for failed tests) <br /> if the entire depth of the sump is not tested,specify how much was tested. If the answer to soy of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire sump must be tested, (See SWRCB LG-160) <br />