Laserfiche WebLink
F. In-Tank K:;augning/ SIR I;gou5,,,�t: IB C-beck this box if tank%,Aing is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the followin checklist: " <br /> LfYes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were Al items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com le_te the 10 owing checklist: <br /> es FLIN/A <br /> For equipment start-up or annual equipment ccrc&ation, was a leak simulated to verify LLD performance? <br /> (Check all that apply) Simulated leak rate: ®�g.p.h.; ❑0.1 g.p.h ; ❑0.2 g.p.h. <br /> es ❑ No* Were all LLDs confumed operational and accurate within regulatory requirements? <br /> s ❑ No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> .❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> U_WA <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> �N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br /> Q'9/A or fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> td N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />