Laserfiche WebLink
Jul 21 06 12t51p Afforda Test (209) 744-0116 p. 5 <br /> T.esNMninlenance: <br /> I�AC'ILI'1'Y IsMPLOYEL'TRAININC --- _ N NA <br /> V <br /> IS All GGcility employees have received the required on-the-job training within_tlx P&qt car. <br /> 16 <br /> All.facility ern rn ees hued within the p=30 days have received the re wired on-the-job training- <br /> Note: <br /> rainio _Note: Any answer of"N"should he explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Comments: <br /> Items Requiring Follow-Up Actions: <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated LJST Operator,who <br /> Possesses a current"California UST System Operator"certification issued by the International Code <br /> Council, <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator,but <br /> not to the State Water Resources Control Board. <br /> The Designated tJST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The LIST Owner Or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must he maintained on-site or, if approved by the <br /> local agency, off-site at a readily available location. <br />