My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
1950
>
2300 - Underground Storage Tank Program
>
PR0504240
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 9:25:04 AM
Creation date
11/8/2018 9:45:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0504240
PE
2361
FACILITY_ID
FA0006136
FACILITY_NAME
QUICK TRUCK REPAIR
STREET_NUMBER
1950
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15308006
CURRENT_STATUS
02
SITE_LOCATION
1950 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MINER\1950\PR0504240\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
8/17/2016 3:41:51 PM
QuestysRecordID
3168581
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> STATE OF CALIFORNIA `- <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> iF Jr i <br /> C, COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. °��,�°.+• <br /> MARK ONLY IM 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ ? PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ e TANK ROVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: A+ EM�� <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> iA. OWNER'S TANK I.D.# V K NO VJ A.$ B. MANUFACTURED BY: E <br /> C. DATE INSTALLED(MO/DAY/YEAR) V K �••,0 t✓ 0. TANK CAPACITY IN GALLONS: : 0 000 <br /> ILTANKCONTENTS IFA-11SMARKED,C0MPLETE ITEMC. <br /> A P4 1 MOTOR VEHICLE FUEL EJ4 OIL B. , C. ❑ taUN LE D 3 DIESEL � 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ tb PREMIUM 4 GASAHOL ❑ T METHANOL <br /> UNLEADED ❑ 5 JETFUEL <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A.B,AND C,AND ALLTHAT APPLIES IN BOX D AND <br /> A. TYPE OF 1w 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ ;4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ® 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 9. POLYVINYL CHLORIDE ❑ ? ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING ❑ 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER N O^/ C <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> I <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION p 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A©2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A e 4 FIBERGLASS PIPE <br /> CORROSION A U S ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100x METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR Lo�2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> ONBORING 99 OTHER <br /> V.TANK LEAK DETECTION <br /> j ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING 4 AUTOMATICTANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> ❑ 6 TANK TESTING ® ? INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTI M T D A LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS F RM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME I )AN t`. ,t.l'-C--' • IL, DATE <br /> (PRINTED a SIGNATURE) -� A"bO GcRU`C ` J �7 �d <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSEDOF THE 611 NUMBERS BELOW 7 <br /> COUNTY# JURISDICTION# FACILITY# TANK* <br /> STATE I.D.# m <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PENIMIT EXPIRATIONDATE <br /> F� �0RM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. I <br /> 1 V11A -/1'V I ` FOROOl4B.R5 l <br />
The URL can be used to link to this page
Your browser does not support the video tag.