Laserfiche WebLink
Sacramento Equipment Maintenance Company, Inc. <br /> Date `) 129 /Sf4f Worl:: Order #Syo3n <br /> St oto # / x y ProductIQ'7G,,c�e1j "- <br /> Addfess 2r.sn nai, /J;og(g sF,,A-r j)CV1 STP Brand— rj <br /> RED JACKET LEAK DETECTOR TEST <br /> F'RODUCT: Regular. Unleaded, Premium Unleaded, Diesel (Circle one) <br /> NOTE: USE SEPARATE FORM FOR EACH TANK. <br /> ( 1 ) Running pressure____�� . (C) Shut-off pressure__2S, <br /> ( T) Amount of product released thru. Bibcock: tc zerc_____Q oz . <br /> (4) With valve open, start STF . List pressure_____—_6f F'S1. <br /> (5) Reduce floc: to rate of 7 oz . per minute, list pressure at <br /> tis flow rateF'. S. I . <br /> (o) 'Turn STF' off. Let pressure drop to zero thru leak iust <br /> created. List time for ga.uoe to reach zero- r min. -3_fl_.sec <br /> (7) Turn the STF baI on. h:eep leak rate at Bibcock. List <br /> pressureF'SI . Flow rate at nozzle <br /> (S) Stop leak: with STP still on. Does leak: detector reset? <br /> y s no. If yes, how long to reset? __min <br /> (9) Turn STP off . List pressure__ 7 !c/ PSI. <br /> 10) Turn STP back: on. List time to reach pressure rise. <br /> min. sec. <br /> 11 ) List pressure <br /> 12) Open zozzle and list pressure <br /> SATISFACTORY LEAK DETECTOR <br /> LEAK DETECTOR <br /> Model /16 -03-p Date Code &< Serial # / YrA2u/JAILr <br /> 2533 Connie Drive (916) 925.2716 Sacramento,California 95815 <br /> CALIFORNIA CONTRACTOR'S LICENSE#502377 <br />