My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
2650
>
2300 - Underground Storage Tank Program
>
PR0231191
>
COMPLIANCE INFO 1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:19 PM
Creation date
11/8/2018 9:45:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231191
PE
2381
FACILITY_ID
FA0003836
FACILITY_NAME
LOCAL FOOD MARKET
STREET_NUMBER
2650
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13311131
CURRENT_STATUS
02
SITE_LOCATION
2650 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MONTE DIABLO\2650\PR0231191\COMPLIANCE INFO 1986-1997.PDF
QuestysFileName
COMPLIANCE INFO 1986-1997
QuestysRecordDate
8/11/2017 6:31:58 PM
QuestysRecordID
3573212
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> / Required by Sections 2632(d) and 2641(h) CCR <br /> L <br /> Facility Name Loc-p,L, t•o El > (LE , <br /> Facility Address 6d, so A—/(or( r iF &L o <br /> 03 <br /> ti <br /> A Describe the frequency of performmonitoring: rM <br /> in the <br /> Tank �� 2 1or7 <br /> Piping lin t r —� >' Y \.,� H <br /> NAII/S='i ViP = <br /> B. What methods and equipment, identified by name and mode:, will be used for <br /> performing the monitoring: <br /> Tank <br /> IVA— <br /> Piping <br /> C. Describe the locations) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> <' 5-1= Ar oft= �u fJ <br /> D. 'List the names) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> L/A f A r n.1 • I -�i-/�r3 /e, P E rz-^--o 2 <br /> E. Reporting format for monitoring: <br /> Tank � ( wES'i 1 `t; EPC tLT+ N r MT rT <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L' months: <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipmepC: <br /> Of 7— <br />
The URL can be used to link to this page
Your browser does not support the video tag.