My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:44 PM
Creation date
11/8/2018 9:46:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\COMPLIANCE INFO 2017 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/5/2018 9:28:19 PM
QuestysRecordID
3909979
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN1 O A Q U I N Environmental Health Department <br /> COUNTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES [I NO b� <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> t <br /> t,U-(i Cl3"—Q" is GVAU civ t tins <br /> v�cdf. - - �. ; : I STP �to I �'�(( b B'1 ST'*o <br /> t-all <br /> t�TIJ 2t V Zi�t�, � ��L`�LI�Sr'i7T itL�O g7 ��� LICf �• l [f5t:� u��' is <br /> 4. List ofequipmentto be used (Attach manufacturer's specification shee-'tsI showing third-party approval): <br /> t-eVNAL out <br /> �1B <br /> ENv\ pEPP <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [] <br /> b. Identify contractor performing decontamination: <br /> Name Phone U <br /> Address City Zip <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.