Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YESQ NOM <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobslte as required by Title 8, <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done, (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> 1. For the work from last August in which ICON boots were installed;These will be replaced with NOV fiberglass hard <br /> fittings. <br /> 2. Remove both boots from 3"chase pipe to the 2"chase pipe between 87 and 91 fill sump; install termination fitting to <br /> make chase pipe come into the VPH system. <br /> 3.Remove both ends from chase pipe from 3"chase pipe to the 2"chase pipe between the diesel STP and diesel fill <br /> sump;install termination fitting to make chase pipe come into the VPH system <br /> 4.Should any other"disintegrating"penetrations be discovered,they will be replaced . <br /> 5.Add chase pipes and fittings to any other zones that are not presently monitored by the VPH system,should any other <br /> zones be discovered <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> NOV Fiberglass Systems,Termination fittings 3"to 2" <br /> AUG 2018 <br /> ENVIRONMENTAL HEALTH 2 <br /> DEPARTMENT <br />