My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
COMPLIANCE INFO_2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:44 PM
Creation date
11/8/2018 9:46:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
AISLE 1 #2356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\COMPLIANCE INFO 2017 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2017 - PRESENT
QuestysRecordDate
6/5/2018 9:28:19 PM
QuestysRecordID
3909979
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Product Data <br /> INSTALLATION WARNING: <br /> Refer to Smith Fibercast Manual No. F6000 or <br /> Manual No. F6080 for installation instructions. Air Testing: Hydrostatic test should be <br /> used instead of air or compressed gas if <br /> NOTE: It is highly recommended that assembly possible. When air or compressed gas is <br /> training be conducted by a FGS Smith Fibercast fac- used for testing, tremendous amounts of energy <br /> tory representative prior to installation start up, can be stored in the system. If a failure occurs, the <br /> energy may be released catastrophically, which can <br /> When connecting containment pipe and fittings, plain result in property damage and personal injury. In <br /> ends of the containment pipe are machined or thorough- cases where system contamination or fluid weight <br /> ly sanded to accept the two-piece containment fitting. prevents the use of hydrostatic test, air test may be <br /> Containment pipe must be positioned over the primary used with extreme caution. To reduce the risk of air <br /> piping before assembly and bonding of the primary pipe testing, use the use the table below to determine <br /> system. The size of the containment fittings may dictate maximum pressure. When pressurizing the system <br /> the minimum center line dimensions for the primary pip- with air or compressed gas,the area surrounding <br /> ing. the piping must be cleared of personnel to prevent <br /> injury. Hold air pressure for one hour, then reduce <br /> Upon completion of a successful primary pipe test the pressure to one half the original. Personnel can <br /> procedure,the two-piece secondary containment fittings then enter the area to perform soap test of all joints. <br /> may be installed. They are installed using threaded in- Again, extreme caution must be exercised during <br /> serts embedded in the fittings and the hex-head bolts air testing to prevent property damage or personnel <br /> supplied by Smith Fibercast. A system-matching adhe- injury. If air or compressed gas testing is used, FGS <br /> sive must be applied to all bonding surfaces just prior to will not be responsible for any resulting injury to <br /> being joined by the bolts. The secondary containment personnel or damage to property, including the pip- <br /> system must be given time for the adhesive to properly ing system. Air or compressed gas testing is done <br /> cure before testing the annular space. entirely at the discretion and risk of management at <br /> the job site. <br /> The testing of FGS Smith Fibercast secondary con- <br /> tainment piping systems is recommended to ensure the Maximum Allowable Air Test Pressure <br /> integrity of the pipe,fittings and joints of all types. The Pipe <br /> introduction of the test fluid during testing should be Dia. 3" 4" 6" 8" 10" 12" 14" 16" <br /> controlled to prevent sudden pressure surges (Water si 15 15 15 14 9 6 5 4 <br /> Hammer). Water Hammer can produce pressures that p g <br /> greatly exceed recommended system test pressure. <br /> ANCHORS <br /> THESE PROCEDURES MUST BE FOLLOWED TO Anchors are available to control pipe movement due to <br /> AVOID SERIOUS PERSONAL INJURY OR PROPERTY thermal expansion/contractions or fluid flow transients. <br /> DAMAGE. FAILURE TO DO SO WILL RESULT IN FGS Smith Fibercast secondary containment anchors <br /> LOSS OF WARRANTY. BUYER, INSTALLER, OR bond directly to the primary pipe and to the inside of <br /> ANY EMPLOYEE, AGENT, OR REPRESENTATIVE the secondary containment fittings to eliminate relative <br /> THEREOF ASSUMES THE RISK OF ANY DAMAGE movement between the two piping systems. The sec- <br /> OR INJURY TO PERSON OR PROPERTY, ondary piping can be anchored externally by the meth- <br /> ods in Manual No. E5000 as required. <br /> TESTING WITH AIR OR GAS CAN BE EXTREMELY <br /> DANGEROUS. REVIEW SAFETY PRECAUTIONS CUSTOM DESIGN <br /> BEFORE STARTING THE TEST AND FOLLOW ALL FGS Smith Fibercast can help you in solving sec- <br /> TESTING PROCEDURES ondary containment piping design problems. Smith <br /> Fibercast also has experience in designing and installing <br /> double-wall secondary containment systems 16"diam- <br /> eter and larger. Contact FGS Smith Fibercast for addi- <br /> tional information. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.