Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> RESPONSE PLAN- PAGE 1 (One fort per facility) <br /> TYPEOFACTION ❑ 1.NEW PLAN 91 X 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME)Raley's Aisle 1#356 <br /> BUSINESS SITE ADDRESS 4219 E Momda Lane Ro3. CITY Stockton - Roa. <br /> II. SPILL CONTROL AND CLEANUP METHOD$_:NV7r 7 <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facitity's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> Y Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed m hazardous waste. <br /> Y Absorbent material will be used to contain and clean up manageable spills of bazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-bazardous.Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropriately. <br /> Y Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords <br /> that it is non-hazardous.If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated.A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> Y We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE BUT AVAILABLE FOR USE IF NEEDED: (Complete on(v ifapplicable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIG. Mo. R30. <br /> RII. R21. 1131. <br /> R12. R22. 1112 <br /> R13. R23. R33, <br /> RK R24. R34. <br /> RIS. R25. i R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Dawn Dimksen R40. TITLE Aisle l Team Leader Mo. <br /> NAME Donna Mendes R41. TITLE Store Team Leader 1151. <br /> NAME Natalie Slatter Raz. TITLE District Team Leader R52, <br /> NAME Mike Gabbert R43. TITLE Director of Operations Administration R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> X Additional system testing or data collection X inspection by qualified persons X Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(3/2008)-1/3 <br />