Rat"Piping Legend & General Notes:
<br /> PIPING LEGEND 3" OVER 2" DOUBLE WALL FIBERGLASS PRODUCT PIPINGDOUBLE WALL
<br /> - - - - - - - - - - - - 3" OVER 2" O.G. DOUBLEWALLGFIBERGLSS VENTIPIPING SS VAPOR RECOVERY PIPING ,
<br /> G EXISTING UNDERGROUND UTILITIES (WATER, GAS, TELEPHONE, SEWER) rad'
<br /> \ NOTE: , t
<br /> \\ ---� CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN
<br /> INTENT AND THE CONDITIONS AND INSTALLATIONITECHN QUEBD TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD
<br /> G,F BE
<br /> • PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT
<br /> E n
<br /> „F PREFERRED. SIPHON PIPING TO SLOPE 1/4" PER FOOT. 4
<br /> RpgD ' SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT, VENT AND
<br /> VAPOR RECOVERY PIPING TO BE DOUBLE CONTAINMENT PIPE. PRODUCT PIPING TO BE ROUTED IN
<br /> VEEDER ROOT ALARM
<br /> CONTAINMENT DUCT. ` ,
<br /> � MONITOR SYSTEMt
<br /> ' a IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK & PIPING SYSTEM COMPLIANT WITH AB-2481 REQUIREMENTS 1 F - ) ;;"
<br /> O� 1 ❑ FOR CONTINUOUS MONITORING OF ALL TANK & PIPING SYSTEM COMPONENTS, ALL DOUBLE WALL PRODUCT, VENT
<br /> AND
<br /> SUMPS, FILL SUMPS,RDISPIPING ENSER SULMPSEANDNITORED MA VENT TRANSITION SUMP SHALLBEMONIITORING. ALL TANK ORED BY CONTINUOUS INE f Epi "FOODS
<br /> / / j " EMERGENCY PUMP
<br /> / I'"h�'J'('ll u SHUT-OFF SWITCH HYDROSTATIC SENSORS. ALL TANK ANNULAR SPACES SHALL BE MONITORED BY CONTINUOUS HYDROSTATIC + '"
<br /> / EMERGENCY PUMP SENSORS. ALL NATIONAL LEAKDETECTIONWOR GR UP.SYSTEMS SHALL BE CERTIFIED FOR USE IN CA UNDER LG-113 AND THE r'�t
<br /> SHUT-OFF SWITCH AND RESET (IND )® 1'7 iyl jl,© � 1rr T,�
<br /> (DUAL HOSE PER SIDE +" - Tank & Piping Installation Notes: ,1 `"� s r 1MMM©
<br /> BLENDING 3 + 1 +a rr< i,
<br /> PRODUCT MPD) p � I "
<br /> 17 17 (DUAL HOSE PER SIDE • ( INSTALL ONE (1) 20K REGULAR UNLEADED, ONE (1) 12K/10K PREMIUM UNEADED/DIESEL DUAL COMPARTMENT DOUBLE WALL
<br /> ���
<br /> Y "VEEDER ROOT"
<br /> 50 TANK AND
<br /> / -- ------------ --------- ------- BLENDING 3 + 1 ' _ PIPING MONITOR AND ALARM FIBERGLASS TANKS WITH N SYSTEM. ALL TINUOUS (TANK SUMPS TORING OF HYDROSTATIC
<br /> BEC DOUBLE WALL FROMANNULAR SPACES B OLLAR TO THE BOTTOM30F TANK SLAB. y�
<br /> " PRODUCT MPD) _-� _
<br /> / ISLAND BUMPER 36 DW 19P 2" DW FR 99 ' _-� `_ SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" MINI HYDROSTATIC SENSORS AND STANDARD LIQUID
<br /> POST (TYP. 4 PLC'.) _ SENSORS TIED INTO THE TLS-350 TANK & PIPING MONITOR AND ALARM SYSTEM PER LG-162-1 REQUIREMENTS. TANKS TO BE '" 500 WEST CAPITOL AVENUE
<br /> / a _ O _ _ _ _ SET MIN. 50" BELOW FINISH GRADE. SEE DETAILS FOR ADDITIONAL INFORMATION. TANKS TO BE ANCHORED UTILIZING XERXES WEST SACRAMENTO, CA
<br /> SUPPLIED DEADMEN ANCHORS AND STRAPS. TANK INSTALLATION & ANCHORING SHALL BE IN ACCORDANCE WITH MANUFACTURER'S y�;r
<br /> 2" DW FRP 7 _ _ _ INSTALLATION INSTRUCTIONS. Idg 95605
<br /> PRODUCT LINES 19 ® � INSTALL A 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY P.O. BOX 15618 SACRAMENTO, t
<br /> ® FORMING A CONCRETE CROWN WITH A 2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION.
<br /> 95852
<br /> ®!]p TANK SLAB SHALL BE THICKENED AT TANK SUMPS TO BE JUST BELOW ''fid REVISIONS
<br /> BLENDING TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER
<br /> (DUAL HOSE PER SIDE 17 ® ��� AB-2481 REQUIREMENTS. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS ON al e
<br /> (TYSINGLEHOSE SIg 3 + 1 17 as DRAWINGS M.5.10.12, M.5.10.15 AND M.5.90.25.
<br /> PRODUCT MPD) PER SIDE BLENDING 3
<br /> ® INSTALL FOUR (3) 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. (1) AT EACH TANK, AND (i) AT DIESEL
<br /> ® I PRODUCT MPD) ' o REMOTE FILL BOX.
<br /> 2" OW FR 6 B 3" OW FRP 6 2" DW FR 6 ® ® INSTALL FOUR (2) 3" EVR PHASE !I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. (1) AT EACH GASOLINE TANK. ,Fv
<br /> O 3" DW FR 6 19 19 -19 0°' _ �. L© Q ®• � INSTALL ONE (1) 2 HP FIX SPEED TURBINE EACH OF THE (3) UNDERGROUND STORAGE TANKS. INSTALL VACUUM SOURCES IN AL TURBINES FOR
<br /> O� VACUUM MONITORING REQUIREMENTS. TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO arab
<br /> Q BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH UST. SET TURBINE
<br /> TANK PAD 2 7 2" OW FRP QO • W INTAKES AT 5' FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES AND '..
<br /> PRODUCT LINES CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. ill
<br /> TURBINE (ITP.)
<br /> ©-
<br /> 11 5 19 20,OOQ,GAL. 2,00 � ( INSTALL 3" INSIDE 4" DOUBLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR "HEALY" VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER
<br /> 1 1 Q FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WARE I , ..
<br /> FILL, VENT, STAGE I & STAGE II �� �� H9 WITH VAPOR PIPING. TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION.
<br /> VAPOR RETURN AND GAUGE AGE 11 UNLEADED DIESEL THE VAPOR LINE'S INTERSTITIAL SPACE SHALL BE CONTINUOUSLY VACUUM MONITORED PER LG-162-i REQUIREMENTS. 1
<br /> 3 4 1 14 E 18 C-- Q 07 INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL FRP GASOLINE SUPPLY LINES TO DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S `u`3"�'�
<br /> Q SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8- PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN TO
<br /> THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO ��, - t
<br /> TANK ANCHORING SYSTEM I I 12 HYDROSTATIC '
<br /> � BACKFILL, PRIOR TO PAVING AND !BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACES SHALL BE CONTINUOUSLY VACUUM MONITORED
<br /> MONITOR 20 OVERFILL ALARM/STROBE n"Tn .. ., ... ,. . -
<br /> ' (TYP.) AND ACKNOWLEDGE - 8 INSTALL AND LINE ALARM CONTRODLEF NOOTMODEL /{ TLS-350R N BUILDING AT NORMALLY OCCUPIED �G H .4
<br /> STATIC GROUND ROD 19 i SWITCH. INSTALL i
<br /> EMERGENCY PUMP 9 (� EMERGENCY PUMP O O LOCATION IN BUILDING. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION.
<br /> SHUT-OFF SWITCH SHUTOFF SWATCH PER UFCiM )F".
<br /> p" DW FRP I REQUIREMENTS 5 (�D INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL FRP VENT LINES. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN.
<br /> ❑ ` CONTRACTOR TO INSTALL TRACER WIRE WITH VENT PIPING. THE INTERSTITIAL SPACE OF EACH OF THE VENT LINES SHALL BE CONTINUOUSLY ,XI m �.
<br /> y MONITORED VIA A VACUUM SENSOR TIED INTO THE "VEEDER-ROOT" TLS-350R CONSOLE PER LG-162-1 REQUIREMENTS. THE DOUBLE WALL VENT 17"
<br /> T I �� O PIPING SHALL BE TERMINATED IN A DOUBLE WALL VENT TERMINATION SUMP THAT WILL BE HYDROSTATICALLY MONITORED AND WILL ALSO HAVE A `
<br /> LIQUID SENSOR INSTALLED PER LG-162-1 REQUIREMENTS. I71,1 a U
<br /> J O 10 TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE
<br /> ,�• THAT CAN BE BUILT UPON, VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) SPARE v -'f. U'
<br /> ® g " 1" CONDUITS W/ PULL ROPE FROM GASOLINE VENT RISEF. TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS. INSTALL HEALY CLEAN AIR
<br /> 14 SEPARATOR TANK AND ASSOCIATED PIPING AND FITTINGS' PER NEW CARS EVR PHASE II STANDARDS AND E.O. INSTALLATION SHALL BE PER CARE 1r�IIi j. T/NG E N G TNE�
<br /> $$ E.0 AND MANUFACTURERS INSTRUCTIONS.
<br /> 9
<br /> <JD INSTALL THREE (3) 3/4" RIGID CONDUITS FOR SUBMERSiBLE PUMP POWER. (ONE FOR EACH TURBINE). NOTE THAT THE LAST 2 FEET z'wi
<br /> UOF ALL CONDUIT ENTERING TURBINE, FILL, DISPENSER OR VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID CONDUIT. �. "LAND PLANNING AND DESIGN SPECIALISTS"
<br /> © 12 INSTALL TWO (2) DUAL FLOAT TANK ANNULAR SPACE WOROSTATIC MONITORING SENSORS. „ �� ,` 18215 72ND AVENUE SOUTH
<br /> ""''' KENT, WASHINGTON 98032
<br /> III (13 INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES -6i VENT, STAGE I AND STAGE II VAPOR)RECOVERY AT TURBINE SIDE SUMP. j'; (425) 951 -R9?2
<br /> ,t—INSTALL VENT PIPING TERMINATIONimi,- -
<br /> \ BOX I 14 INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT EA�H NEW FILL SUMP LOCATION.
<br /> I"+
<br /> 15 TANKS SHALL BE PROPERLY MARKED AND TAGGED N iH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL MANHOLES. j w'iv
<br /> 0 (3) 2 DIA. GALV. STEEL VENT RISERS SHEET TITLE
<br /> 1
<br /> i6 CONTRACTOR TO INSTALL A NEW HEALY CLEAN AIR SEPARATOR ORVR/IVR PHASE II COMPLIANT UNIT AT THE NEW VENT RISER AREA. )�
<br /> WRAPPED TO GRADE. PAINT TO MATCH INSTALLATION AND EQUIPMENT TO COMPLY WITH EXECUTIVE ORDER #VR-201-A, AND SHALL BE IN CONFORMANCE 'NTH NFPA 30 & 30A.
<br /> SITE CONDITIONS ROUTE (2) SPARE 1" .
<br /> CONDUITS TO INTRINSICALLY SAFE WIREWAY 17 INSTALL (3) GILBARCO ENCORE SERIES (3+0) SINGLE HOSE PER SIDE, AND (3) GILBARCO ENCORE SERIES (3+1) DUAL HOSE PER SIDE, UST AND
<br /> --- .v INSTALL HEALEY CLEAN AIR SEPARATOR TANK MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH "HEALY" VAPOR ASSIST STAGE II HOSES AND NOZZLES, BREAKAWAY
<br /> SCALE: 1' 2O'-Q° AND PIPING PER CLE PHASE II REOUIOR TANK VALVES PER NEW CARS EVR PHASE II REQUIREMENTS. INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND
<br /> INSTALLATION SHAEVIRLL BE PER NEW GARB MONITORING SENSORS. DISPENSER' SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY „,; " . PIPING I N STAL I.
<br /> MONITORED PER LG-162-1 COMPLIANCE OPTION, THE LAST 2 FEET OF ALL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID.
<br /> EXECUTIVE ORDER AND PER MANUFACTURERS
<br /> )„I a
<br /> START UP BY MANUFACTURER REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES NTH A MINIMUM OF 200 GALLONS THROUGH EACH
<br /> 20 O 20 40 INSTALLATION INSTRUCTIONS T - ! SITE PLAN
<br /> HOSE/NOZZLE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS ,
<br /> WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS + "
<br /> TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW FILTERS. {
<br /> 18 FILL AND STAGE I VAPOR RECOVERY RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS. GROUND ROD SHALL (F"
<br /> BE DRIVEN IN NATIVE SOIL. �G
<br /> T� t�
<br /> ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE Y
<br /> FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD AND MAIN PRODUCT LINES OR SHALL PROVIDE AT LEAST 4 FEET OF Y4 Ai
<br /> STRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES.
<br /> 'lle 2O TO PROVIDE AN UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE.
<br /> O INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED ' ri,
<br /> f
<br /> iso sM Free
<br /> BCE #120
<br /> 04
<br /> W«O DAYS Compliance Notes:
<br /> BEFORE YOU 11 „il
<br /> #eta)t PROJECT NAME
<br /> Die
<br /> 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES,
<br /> ELEVATIONS AND EQUIPMENT LOCATIONS )tr1 RALEY'S
<br /> 2, ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY 4+N'
<br /> DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH
<br /> THE WORK. ,v p #356
<br /> 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0” w�vl xt
<br /> OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND.
<br /> 4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK
<br /> ,a
<br /> OPERATIONS. .,
<br /> ry
<br /> 5. ALL MATERIALS SHALL.BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL w'
<br /> CODES AND GOVERNING AUTHORITIES.
<br /> 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. SAN JOAQUIN COUNTY y1k3' ,
<br /> 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. ENVIRONWEBER MENTAL HEALTH DEPARTMENT
<br /> 8. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK 304 ESTOCKT N CA 95D FLQOR
<br /> STOCICTON CA 95202
<br /> INSTALLATION. " �.
<br /> 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) (209)488-3420 7r1,
<br /> SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): ❑ A ad
<br /> ',rl {; FRONTAGE ROAD &
<br /> A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. Approved with d+anges. See Remalke I, �f,: MORADA LANE
<br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES.
<br /> C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH i"l Disapproved: See RemSTOCKTON, CALIFORNIA
<br /> '
<br /> MANUFACTURER'S GUIDELINES. ...
<br /> PROJECT NO.
<br /> D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.
<br /> ■ 10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH2.3208.000
<br /> a/ STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT.
<br /> RECORD THE TEST RESULTS AND SUBMIT TO OWNER. �iw+
<br /> C4
<br /> 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING Appro le)d ndsonly tothatwhich18ahown deathbed ".
<br /> v AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. w' I$ DRAWN BY
<br /> hereon and does not authorize or approve any omi88ian or
<br /> _ �r
<br /> 12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK deviation from requirements of state laws or 1001 ordlnenoaIIII•
<br /> AND DISPENSER SUMPS
<br /> 13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION ,
<br /> 1
<br /> WITHIN 30 DAYS OF THE FINAL INSPECTION, r n
<br /> W i 1 SCALE
<br /> 14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY TANK OWNER).
<br /> AS SHOWN
<br /> 15. TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK
<br /> SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK SYSTEM IS -
<br /> PRODUCT TIGHT:
<br /> 1) ENHANCED LEAK DETECTION ELD TEST (TRACER TIGHT m) BY PRAXAIR OR LICENSED AFFILIATE. a~
<br /> DATE
<br /> 2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD
<br /> 23 JUNE 2005
<br /> 3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN
<br /> REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED 14
<br /> AND TESTED IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF CALIFORNIA HEALTH AND SAFETY 7
<br /> CODE SECTION 25292.5. PAGE N0.
<br /> tl 6 mm 1+ fii
<br /> 16. REFERENCED CODES SHALL INCLUDE 2001 CBC; 2001 CFC, ARTICLE 79; 2001 CEC; 2001 CMC. Q l T
<br /> 6 01
<br /> 17. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER _ 13
<br /> SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT. �� '9 CIV1V 1 �� T K 1 1
<br /> S,<rW
<br /> %" SHEET OF