Laserfiche WebLink
ASPHALT AND STONE PER <br /> ASPHALT & STONE AS PROJECT SPECIFICATIONS <br /> SPECIFIED BY PROJECT 14 <br /> SPECIFICATIONS EXTEND CONTINUOUS FILTER 14 <br /> FABRIC TO SLAB <br /> 3,N <br /> 1 <br /> NOTE: zn� /SAA 16 FILTER FABRIC BSAA/�\ <br /> oklR <br /> SLOPE SIDES OF TANK HOLE / /\ /\\ NOTE: STRAPS ARE RATED AT MINIMUM <br /> Q <br /> OR USE SHORING FOR ALL //\ 15 \ 25, 000 LBS, <br /> TANK EXCAVATIONS IN \\ 1 // <br /> ACCORDANCE WITH OSHA 1926 ��/\ 2' 10'-6" 3' 10'-6" 2' <br /> - EXCAVATBPART IONS;HFINALNR LES \� MIN. MIN. 3 1/4" <br /> OCTOBER 1, 1989 /\\ \ H0LD-l)0VN WRAPS HILL <br /> /\ TANK SLZE STRAP LENGTH 'L' L`. FOODS <br /> 7 8 1 \/\\\ _ _ _ _ /\ \ �p 3rd LIFT OF <br /> PEA GRAVEL 4' DLA, 8' --4 1!4' <br /> / I <br /> oo TO TOP OF 1 3f 8" 6' DIA, I2' -1` <br /> TANK 8' DLA. 151 -1- <br /> 1D' DIA, 18' -8 3/4' � %Xg <br /> E2' -6 3/4' <br /> N 2nd LIFT OF PEA GRAVEL GAL�IAhJLZED STRAP EYE ALUMINUM STRAP GUIDE <br /> 1st LIFT OF PEA GRAVEL ALUMINUM STRAP GUIDEa ' <br /> 4 TANK 3-GUIDE <br /> ., <br /> ..I •.. i •.� , i,.J +.. t , �, <br /> // 500 WEST CAPITOL AVENUE <br /> '\� ' ., .r.. . J•-Q• MIN'.•.••°. ��. � � -Q• MIN. •'• • \ N BED <br /> i / ! 6' TANK 4-GUIDES <br /> \\/\/\/ ` `\/ /\/\/\`\\�\ /\\'`\\��\�\\ \�� \\/� GALVANIZED STRAP EYE B' TANK 4-GUIDES WEST SACRAMENTO, CA <br /> 2 3 4 6 6" MAX. 10 12 10' TANK 4-GUIDES GALVANISED STRAP EYE 1 95605 <br /> FILTER FABRIC ON BOTTOM t8 12' TANK 3-GUIDES P.O. BOX 15618 SACRAMENTO <br /> 18' SIDES OF TANK HOLE 18" 18" 95852 <br /> 10 11 <br /> REVISIONS <br /> 7 1'-0" MIN. PEA GRAVEL INSTALLED <br /> NOTE: OVER COMPACTED SOIL. IN WET HOLE <br /> DEFLECTION MEASUREMENT BEFORE & AFTER INSTALLATIONS, INCREASE TO 18" <br /> TANK INSTALLATION SHALL BE ACCORDING TO MINIMUM PER MANUFACTURE'S <br /> MANUFACTURER'S REQUIREMENTS AND SHALL RECOMMENDED INSTALLATION <br /> BE WITHIN MANUFACTURER'S TOLERANCES. GUIDELINES. 'L° <br /> ALL INFORMATION SHALL BE COMPLETED AS <br /> PER THE MANUFACTURER'S WARRANTY '. <br /> DOCUMENTATION. FRP PULTRUDED STRAP <br /> �G H A CSS <br /> 1 TANK HOLE EXCAVATION, AND BACKFILL PROCEDURES 3 TANK STRAP DETAILSmP <Z <br /> o v <br /> c G`T�NG ENG\F�� <br /> "LAND PLANNING AND DESIGN SPECIALISTS" <br /> 18215 72ND AVENUE SOUTH <br /> KENT, WASHINrrnN 980-�2 <br /> (425) 251 -6222 <br /> SHEET TITLE <br /> TYPICAL TANK <br /> QTY UNIT DESCRIPTION ANCHORING <br /> „ <br /> <�> NOTES: UST INSTALLATION A NOTES: UST ANCHORING DETAILS <br /> 2 4 EA DEADMAN, 8 3/4'x18'x18' <br /> WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO ASSURE WORKMEN <br /> 1O SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. EA <br /> QSAFETY. SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY WITH OSHA <br /> t CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 SUBPART P, OSHA 12 EA GALVANIZED ANCHOR POINT <br /> OFIBER REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT STANDARDS-EXCAVATIONS: FINAL RULE OCTOBER 1, 1989. HARDHATS SHALL BE WORN I 12 EA COTTER PIN <br /> CONCRETE. BY ALL WORKMEN OPERATING IN EXCAVATION OR WHERE OVERHEAD WORK IS <br /> I ' <br /> O REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FROM PROGRESSING. <br /> SURFACE. TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR IS 3 <br /> Q2 REQUIRED BY LOCAL REGULATION. CONSULT WITH OWNER'S REPRESENTATIVE. <br /> 4 REINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" IN ' BCE #12004 <br /> OLENGTH. PLACE REBAR 6" FROM SIDES OF BOX. 0 INSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION INSTRUCTIONS. <br /> i <br /> ODIMENSIONS AND QUANTITIES OF DEADMAN FOR 10' DIA. TANKS PER MANUFACTURER (QTY. 2 7 REBAR <br /> NOT USED. Q SPECIFICATIONS. 1 �• • �•(�• I ••O •• ) PROJECT NAME <br /> ONOT USED. NOT USED • • ' - RALEY'S <br /> Qs � � 4,000 PS t COINCRETE <br /> USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN A" & ° <br /> 7 MAX OF Y4" IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL Q6 EACH TANK REQUIRES DEADMAN ON EACH SIDE.O (,• • ,SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S FIELD • • '� �0' • • •• #356 <br /> REPRESENTATIVE. HOLD DOWN STRAPS ARE REQUIRED FOR 20,000 & 22,000 GALLON TANKS AS <br /> SPECIFIED AND SUPPLIED BY TANK MANUFACTURER. < j <br /> • • • •U •' • © • • • � (QTY. Z) #6 REBAR <br /> ONOT USED. Q8 LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. Q <br /> O NOT USED. <br /> FASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND THROUGH THE o .° • ' .• • . , <br /> Ag END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL BE ALTERNATED 180' FROM <br /> OEACH OTHER. • 0 • <br /> 10 NOT USED. • tt Q • • •/1 <br /> ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY TIGHTEN ' y <br /> 11 NOT USED. 1 ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. MEASURE TANK • ° • ' <br /> DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO ENSURE NO TANK DEFLECTION. <br /> FRONTAGE ROAD & <br /> QNOT USED. 1 WIRE ROPE MINIMUM DIAMETER 1/2", OR AS PER MANUFACTURER'S SPECIFICATIONS SCALE ' 1/2 MORADA LANE <br /> QTANK PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER STOCKTON, CALIFORNIA <br /> THE FOOTPRINT OF THE TANKS. Q 'TURNBUCKLES: HOOK TYPE - 1-1/4" DIAMETER, JAW TYPE - 3/4" DIAMETER, EYE <br /> TYPE - 3/4" DIAMETER PROJECT NO. <br /> CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE CORNERS WHERE 2.3208.000 <br /> 14 <br /> MEETING CONCRETE. COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING BARS WITH <br /> ZA PITCHMASTIC. <br /> 15 NOT USED. 2 2 <br /> INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. 1 � DRAWN BY <br /> 16 NOT USED. A IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION MUST BE 4 FT. <br /> 1 <br /> SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, PLACEMENT, AND FROM BOTH SIDES AND ENDS (WITH FIBERGLASS TANKS) I " <br /> QORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED BY THE FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR WET HOLE <br /> LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL LOCATION INSTALLATIONS. FABRIC MUST EXTEND TO SLAB AND MAY BE PINNED TO SIDE OF HOLE p, o• ,' .�: o, ®. T SCALE <br /> SIGN-OFF SHALL BE DOCUMENTED. WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. o ' , o• ° , ri , AS SHOWN <br /> QpofESe/o,,/9 <br /> DATE <br /> 23 JUNE 2005 <br /> Yry ' <br /> 613ol67 PAGE NO. <br /> l �`� awn {e•'l <br /> 4 TYPICAL CONCRETE DEADMAN (+I V TK6- 1 <br /> U <br /> 4 <br /> SHEET <br /> ,E:� OF <br />