My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005 PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2005 PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:09:08 PM
Creation date
11/8/2018 9:46:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005 PLAN
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL PLAN 2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDROSTATIC SUMP RESERVOIR WITH 37 <br />SENSOR <br />FIX SPEED TURBINE W/ ELECTRONIC 19 <br />PRESSURE LINE MONITOR <br />35 <br />°'Q • <br />18) 42" DIA, ACCESS MANHOLE <br />18" <br />(TYP.) <br />J -BOX • • " <br />16" <br />zEF. <br />48" DOUBLE WALL e,3 <br />FIBERGLASS SUMP AND V <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />2"x24" FLEX 27 <br />FIX SPEED TURBINE W/19 <br />ELECTRONIC <br />PRESSURE LINE MONITOR 35 <br />3 -VACUUM SENSOR ASSEMBLY 0 fi <br />20,000 GAL. TRNK <br />-&- 36 <br />2 -VACUUM SENSOR ASSEMBLY 0 <br />12,000 GAL. TANK <br />PRODUCT & VAPOR 3 <br />TIGHT SUMP COVER <br />(ABOVE) <br />3" FLEX CONNECTOR C28 <br />VACUUM TUBING WITH <br />3 -WAY BALL VALVES ( I <br />(TYP.) I I <br />1-1/2" MIN. CROWN <br />(TYP. ALL OPENINGS) <br />��`3Fr:��+i•�iiu�� <br />2� 2" BALL VALVE <br />22D7 2" X 24" FLEX CONNECTOR <br />D3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />DISPENSERS <br />HYDROSTATIC SUMP RESERVOIR WITH 37 <br />SENSOR <br />FIX SPEED TURBINE W/ ELECTRONIC 1 <br />PRESSURE LINE MONITOR <br />35 <br />J -BOX -� <br />DOUBLE SIDED25 <br />CONDUIT <br />PENETRATIONS <br />" MONITORING CONDUIT <br />3/4" POWER CONDUIT-- <br />A'4 a c [ • <br />. •del{ <br />2-VACUU3g <br />M SENSOR <br />ASSEMBLY <br />48" DOUBLE WALL \ =. <br />FIBERGLASS SUMP AND <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />• <br />18) 42" DIA. ACCESS MANHOLE <br />18 , <br />1-1/2" MIN. CROWN <br />MID.) (TYP. ALL OPENINGS) <br />• -d4 ° n <br />a 4. <br />a • <br />d � <br />• d - <br />• � 3" PEA GRAVEL MIN. <br />20 2" BALL VALVE <br />27 2" X 24" FLEX CONNECTOR <br />:2)33" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />3 <br />U223" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />-,--- - - DISPENSERS <br />13 4X4 , <br />X3 X2 EXTRACTOR SUMP LIQUID 34 <br />FITTING & BALL FLOAT MONITORING SENSOR <br />14 SET AT 98% CAPACITY (PERMANENTLY BELOW <br />APEX OF TANK AT <br />LOWEST POINT) <br />3 Turbine Sump Section Diesel Tank <br />SCALE: 3/4" = 1'-0" <br />3" OVER 2" DOUBLE WALL FIBERGLASS <br />VENT LINE TO RISER <br />(VACUUM MONITORED) <br />23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />- 3" BLACK IRON PIPING <br />AND FITTINGS <br />27 2"x24" FLEX <br />22 3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />• PRODUCT PIPING TO <br />- - - - DISPENSERS <br />f; I%23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />i <br />13 14 4"X4"X3"X2" EXTRACTOR FITTING & <br />BALL FLOAT SET AT 98% CAPACITY <br />2" BLACK IRON PIPING <br />AND FITTINGS <br />SUMP MONITORING LIQUID <br />34 SENSOR <br />24 4" OVER 3" DOUBLE WALL <br />SMITH ENTRY FITTING <br />- - 22 4" OVER 3" DOUBLE WALL <br />FIBERGLASS VAPOR RETURN LINE <br />FROM DISPENSERS <br />(VACUUM MONITORED) <br />Turbine Sump Plan View Gasoline Tanks <br />2 <br />SCALE: 3/4" = 1 --0" <br />�n <br />_—........— ————— .r — — — — — — — — — — —— —— — — —— <br />� p a <br />I <br />r SUMP BODY t <br />I I <br />r t <br />t r <br />t E <br />! t <br />I ! coo <br />INSIDE FIELD LAY-UP OUTSIDE FIELD LAY-UP i o <br />t � <br />COLLAR I <br />ti <br />t <br />FACTORY LAY -U FACTORY LAY -UPI I <br />I ! I <br />I � I <br />NOTE: SUMP IS DW FROM TANK SURFACE INTO <br />THE ACCESS OPENING. <br />MONITORING RESERVOIR <br />(OPTIONAL) <br />42" WIDE OR 48" WIDE <br />1 X <br />TO TANK I '� <br />--------------' <br />--- <br />-----__----_----- <br />4" COLLAR <br />1 --PIECE <br />Flat Sided Turbine Sump Riser <br />7 . <br />SCALE, !NOT TO SCALE <br />TEST FITTING <br />OEM <br />48" DOUBLE WALL <br />FIBERGLASS SUMP AND <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />2"x24" FLEX 27 <br />FIX SPEED TURBINE W/ 19 <br />ELECTRONIC <br />PRESSURE LINE MONITOR 35 <br />2 -VACUUM SENSOR 36 <br />ASSEMBLY <br />PRODUCT & VAPOR <br />TIGHT SUMP COVER Q <br />(ABOVE) <br />1 3 4"X4"X2" EXTRACTOR <br />FITTING & BALL FLOAT <br />14 SET AT 98% CAPACITY <br />3" OVER 2" DOUBLE WALL FIBERGLASS <br />VENT LINE TO RISER <br />(VACUUM MONITORED) <br />923 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />27 2"x24" FLEX <br />22 3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />DISPENSERS <br />23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />4"X4"X2" EXTRACTOR FITTING & <br />13 14 BALL FLOAT SET AT 98% <br />CAPACITY <br />2" BLACK IRON PIPING <br />AND FITTINGS <br />DSUMP MONITORING LIQUID <br />34 SENSOR <br />4 <br />Turbine Sump Plan View Diesel Tank <br />SCALE: 3/4" = 1'--0" <br />TOP OPENING <br />28 3/4" I.D. <br />WATERTIGHT COVER <br />31 7/8" 0. D. <br />to <br />JOINT DETAILS <br />G) � <br />O CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE ATLO <br />CONNECTION FOLLOWING CURING OF ADHESIVE. SPECIFIC <br />ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING <br />REQUIREMENTS WILL DETECT THE SMALLEST OF FLAWS. ALL <br />TANK WALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, GASOLINE WITH <br />15 GASOLINE WITH 10 % ETCH. FIBERGLASS AND RESIN MUST <br />EXTEND 1/2" BEYOND COVERAGE OF ADHESIVE. <br />*NOTE: <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR <br />PROPER INSTALLATION & PREPARATION PER <br />MANUFACTURERS INSTRUCTIONS AND SHALL <br />REINSTALL SUMPS IF HYDROSTATIC TESTING SHOWS <br />LEAKING IN THIS AREA OF THE SUMP. <br />--- - --- ----------- ----- <br />I I <br />SECONDARY FIELD LAY-UP <br />SUMP TOP <br />I ! <br />k MYLAR <br />+ t <br />! t <br />! PRIMARY FIELD LAY-UP t <br />t I <br />r I <br />MONITORING RESERVOIR I I <br />(OPTIONAL) + ! <br />SUMP BODY� <br />I r <br />' 1 <br />--- -�--- -_ _ ---------------...------------ / <br />i <br />-- — — ' / <br />-- ---- ----- - - - - -- <br />! SUMP BODY <br />TEST FITTING ! ! <br />42" W DE OR 48 WIDE I r <br />24 OR 480?I r <br />PIPING AREA I I <br />I I <br />I r <br />I ' - - - - - - - - - - - - - - 1 TANK WALL INSIDE FIELD LAY-UP OUTSIDE FIELD LAY --UP <br />+ t - - - - -----..... - - -- <br />- i COLLAR <br />I <br />4" COLLAR <br />r I <br />2—PIECE i FACTORY LAY-UP FACTORY LAY-UP <br />t I <br />r I <br />-- - -- - - - - - - - - - - - - -------------- - - - - - - <br />f <br />l } <br />'J .2t HILL <br />FOOD <br />f:, <br />W <br />500 WEST CAPITOL AVENUE <br />WEST SACRAMENTO, CA <br />95605 <br />P.O. BOX 15618 SACRAMENTO, CA <br />95852 <br />REVISIONS <br />A <br />A <br />GH -40%SN <br />n C; <br />o � <br />ENG\N"- <br />iAND PLANNING AND DESIGN SPECIALISTS" <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />ED SHEET TITLE <br />TANK TURBINE, <br />SUMP & PIPING <br />INSTALL DETAILS <br />FRONTAGE ROAD & <br />MORADA LANE <br />STOCKTON, CALIFORNIA <br />PROJECT NO. <br />2.3208.000 <br />DRAWN BY <br />SCALE <br />AS SHOWN <br />0 DATE <br />23 JUNE 2005 <br />PAGE NO. <br />TK3-1 <br />SHEET OF <br />DOUBLE SIDED 25 <br />CONDUIT <br />PENETRATIONS <br />i <br />1" MONITORING CONDUIT <br />1 <br />3/4" POWER CONDUIT <br />i <br />: I <br />3 <br />3 -VACUUM SENSOR <br />E <br />ASSEMBLY 0 20,000 <br />GAL. TAN K <br />-&- 36 <br />- <br />2 -VACUUM SENSOR <br />ASSEMBLY ® 12,000 <br />GAL. TANK <br />1 <br />3 <br />E <br />48" DOUBLE WALL 3 <br />E <br />FIBERGLASS SUMP AND <br />- - - - - - <br />- <br />- - <br />- <br />- - - <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />SUMP LIQUID 34 <br />MONITORING SENSOR <br />(PERMANENTLY BELOW <br />APEX OF TANK AT <br />LOWEST POINT) <br />-10 <br />Turbine Sump Section <br />a Gasoline Tanks <br />1 <br />SCALE: 3/4" = 1'-0" <br />16" <br />zEF. <br />48" DOUBLE WALL e,3 <br />FIBERGLASS SUMP AND V <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />2"x24" FLEX 27 <br />FIX SPEED TURBINE W/19 <br />ELECTRONIC <br />PRESSURE LINE MONITOR 35 <br />3 -VACUUM SENSOR ASSEMBLY 0 fi <br />20,000 GAL. TRNK <br />-&- 36 <br />2 -VACUUM SENSOR ASSEMBLY 0 <br />12,000 GAL. TANK <br />PRODUCT & VAPOR 3 <br />TIGHT SUMP COVER <br />(ABOVE) <br />3" FLEX CONNECTOR C28 <br />VACUUM TUBING WITH <br />3 -WAY BALL VALVES ( I <br />(TYP.) I I <br />1-1/2" MIN. CROWN <br />(TYP. ALL OPENINGS) <br />��`3Fr:��+i•�iiu�� <br />2� 2" BALL VALVE <br />22D7 2" X 24" FLEX CONNECTOR <br />D3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />DISPENSERS <br />HYDROSTATIC SUMP RESERVOIR WITH 37 <br />SENSOR <br />FIX SPEED TURBINE W/ ELECTRONIC 1 <br />PRESSURE LINE MONITOR <br />35 <br />J -BOX -� <br />DOUBLE SIDED25 <br />CONDUIT <br />PENETRATIONS <br />" MONITORING CONDUIT <br />3/4" POWER CONDUIT-- <br />A'4 a c [ • <br />. •del{ <br />2-VACUU3g <br />M SENSOR <br />ASSEMBLY <br />48" DOUBLE WALL \ =. <br />FIBERGLASS SUMP AND <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />• <br />18) 42" DIA. ACCESS MANHOLE <br />18 , <br />1-1/2" MIN. CROWN <br />MID.) (TYP. ALL OPENINGS) <br />• -d4 ° n <br />a 4. <br />a • <br />d � <br />• d - <br />• � 3" PEA GRAVEL MIN. <br />20 2" BALL VALVE <br />27 2" X 24" FLEX CONNECTOR <br />:2)33" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />3 <br />U223" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />-,--- - - DISPENSERS <br />13 4X4 , <br />X3 X2 EXTRACTOR SUMP LIQUID 34 <br />FITTING & BALL FLOAT MONITORING SENSOR <br />14 SET AT 98% CAPACITY (PERMANENTLY BELOW <br />APEX OF TANK AT <br />LOWEST POINT) <br />3 Turbine Sump Section Diesel Tank <br />SCALE: 3/4" = 1'-0" <br />3" OVER 2" DOUBLE WALL FIBERGLASS <br />VENT LINE TO RISER <br />(VACUUM MONITORED) <br />23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />- 3" BLACK IRON PIPING <br />AND FITTINGS <br />27 2"x24" FLEX <br />22 3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />• PRODUCT PIPING TO <br />- - - - DISPENSERS <br />f; I%23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />i <br />13 14 4"X4"X3"X2" EXTRACTOR FITTING & <br />BALL FLOAT SET AT 98% CAPACITY <br />2" BLACK IRON PIPING <br />AND FITTINGS <br />SUMP MONITORING LIQUID <br />34 SENSOR <br />24 4" OVER 3" DOUBLE WALL <br />SMITH ENTRY FITTING <br />- - 22 4" OVER 3" DOUBLE WALL <br />FIBERGLASS VAPOR RETURN LINE <br />FROM DISPENSERS <br />(VACUUM MONITORED) <br />Turbine Sump Plan View Gasoline Tanks <br />2 <br />SCALE: 3/4" = 1 --0" <br />�n <br />_—........— ————— .r — — — — — — — — — — —— —— — — —— <br />� p a <br />I <br />r SUMP BODY t <br />I I <br />r t <br />t r <br />t E <br />! t <br />I ! coo <br />INSIDE FIELD LAY-UP OUTSIDE FIELD LAY-UP i o <br />t � <br />COLLAR I <br />ti <br />t <br />FACTORY LAY -U FACTORY LAY -UPI I <br />I ! I <br />I � I <br />NOTE: SUMP IS DW FROM TANK SURFACE INTO <br />THE ACCESS OPENING. <br />MONITORING RESERVOIR <br />(OPTIONAL) <br />42" WIDE OR 48" WIDE <br />1 X <br />TO TANK I '� <br />--------------' <br />--- <br />-----__----_----- <br />4" COLLAR <br />1 --PIECE <br />Flat Sided Turbine Sump Riser <br />7 . <br />SCALE, !NOT TO SCALE <br />TEST FITTING <br />OEM <br />48" DOUBLE WALL <br />FIBERGLASS SUMP AND <br />COLLAR WITH BRINE <br />FILLED ANNULUS <br />2"x24" FLEX 27 <br />FIX SPEED TURBINE W/ 19 <br />ELECTRONIC <br />PRESSURE LINE MONITOR 35 <br />2 -VACUUM SENSOR 36 <br />ASSEMBLY <br />PRODUCT & VAPOR <br />TIGHT SUMP COVER Q <br />(ABOVE) <br />1 3 4"X4"X2" EXTRACTOR <br />FITTING & BALL FLOAT <br />14 SET AT 98% CAPACITY <br />3" OVER 2" DOUBLE WALL FIBERGLASS <br />VENT LINE TO RISER <br />(VACUUM MONITORED) <br />923 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />27 2"x24" FLEX <br />22 3" OVER 2" DOUBLE <br />WALL FIBERGLASS <br />PRODUCT PIPING TO <br />DISPENSERS <br />23 3" OVER 2" DOUBLE WALL <br />SMITH ENTRY FITTING <br />4"X4"X2" EXTRACTOR FITTING & <br />13 14 BALL FLOAT SET AT 98% <br />CAPACITY <br />2" BLACK IRON PIPING <br />AND FITTINGS <br />DSUMP MONITORING LIQUID <br />34 SENSOR <br />4 <br />Turbine Sump Plan View Diesel Tank <br />SCALE: 3/4" = 1'--0" <br />TOP OPENING <br />28 3/4" I.D. <br />WATERTIGHT COVER <br />31 7/8" 0. D. <br />to <br />JOINT DETAILS <br />G) � <br />O CONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE ATLO <br />CONNECTION FOLLOWING CURING OF ADHESIVE. SPECIFIC <br />ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING <br />REQUIREMENTS WILL DETECT THE SMALLEST OF FLAWS. ALL <br />TANK WALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, GASOLINE WITH <br />15 GASOLINE WITH 10 % ETCH. FIBERGLASS AND RESIN MUST <br />EXTEND 1/2" BEYOND COVERAGE OF ADHESIVE. <br />*NOTE: <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR <br />PROPER INSTALLATION & PREPARATION PER <br />MANUFACTURERS INSTRUCTIONS AND SHALL <br />REINSTALL SUMPS IF HYDROSTATIC TESTING SHOWS <br />LEAKING IN THIS AREA OF THE SUMP. <br />--- - --- ----------- ----- <br />I I <br />SECONDARY FIELD LAY-UP <br />SUMP TOP <br />I ! <br />k MYLAR <br />+ t <br />! t <br />! PRIMARY FIELD LAY-UP t <br />t I <br />r I <br />MONITORING RESERVOIR I I <br />(OPTIONAL) + ! <br />SUMP BODY� <br />I r <br />' 1 <br />--- -�--- -_ _ ---------------...------------ / <br />i <br />-- — — ' / <br />-- ---- ----- - - - - -- <br />! SUMP BODY <br />TEST FITTING ! ! <br />42" W DE OR 48 WIDE I r <br />24 OR 480?I r <br />PIPING AREA I I <br />I I <br />I r <br />I ' - - - - - - - - - - - - - - 1 TANK WALL INSIDE FIELD LAY-UP OUTSIDE FIELD LAY --UP <br />+ t - - - - -----..... - - -- <br />- i COLLAR <br />I <br />4" COLLAR <br />r I <br />2—PIECE i FACTORY LAY-UP FACTORY LAY-UP <br />t I <br />r I <br />-- - -- - - - - - - - - - - - - -------------- - - - - - - <br />f <br />l } <br />'J .2t HILL <br />FOOD <br />f:, <br />W <br />500 WEST CAPITOL AVENUE <br />WEST SACRAMENTO, CA <br />95605 <br />P.O. BOX 15618 SACRAMENTO, CA <br />95852 <br />REVISIONS <br />A <br />A <br />GH -40%SN <br />n C; <br />o � <br />ENG\N"- <br />iAND PLANNING AND DESIGN SPECIALISTS" <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />ED SHEET TITLE <br />TANK TURBINE, <br />SUMP & PIPING <br />INSTALL DETAILS <br />FRONTAGE ROAD & <br />MORADA LANE <br />STOCKTON, CALIFORNIA <br />PROJECT NO. <br />2.3208.000 <br />DRAWN BY <br />SCALE <br />AS SHOWN <br />0 DATE <br />23 JUNE 2005 <br />PAGE NO. <br />TK3-1 <br />SHEET OF <br />'J .2t HILL <br />FOOD <br />f:, <br />W <br />500 WEST CAPITOL AVENUE <br />WEST SACRAMENTO, CA <br />95605 <br />P.O. BOX 15618 SACRAMENTO, CA <br />95852 <br />REVISIONS <br />A <br />A <br />GH -40%SN <br />n C; <br />o � <br />ENG\N"- <br />iAND PLANNING AND DESIGN SPECIALISTS" <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />ED SHEET TITLE <br />TANK TURBINE, <br />SUMP & PIPING <br />INSTALL DETAILS <br />FRONTAGE ROAD & <br />MORADA LANE <br />STOCKTON, CALIFORNIA <br />PROJECT NO. <br />2.3208.000 <br />DRAWN BY <br />SCALE <br />AS SHOWN <br />0 DATE <br />23 JUNE 2005 <br />PAGE NO. <br />TK3-1 <br />SHEET OF <br />
The URL can be used to link to this page
Your browser does not support the video tag.