Laserfiche WebLink
ASPHALT & STONE AS <br />SPECIFIED BY PROJECT <br />SPECIFICATIONS <br />um 1 <br />SLOPE SIDES OF TANK HOLE <br />OR USE SHORING FOR ALL 15 <br />TANK EXCAVATIONS IN 2� <br />ACCORDANCE WITH OSHA 1926 <br />SUBPART P, OSHA STANDARDS ,\\ MIN <br />- EXCAVATIONS; FINAL RULE <br />OCTOBER 1, 1989 <br />10' — 6,p <br />\�� .• <br />t 6 0" MIN. <br />,18 „F LTER FABRIC ON BOTTOM 6" MAX. <br />& SIDES OF TANK HOLE <br />3' <br />18" 118" <br />ASPHALT AND STONE PER <br />PROJECT SPECIFICATIONS <br />EXTEND CONTINUOUS FILTER 14 <br />FABRIC TO SLAB <br />ffe-Nn. <br />NOTE: -- <br />DEFLECTION MEASUREMENT BEFORE & AFTER <br />TANK INSTALLATION SHALL BE ACCORDING TO <br />MANUFACTURER'S REQUIREMENTS AND SHALL <br />BE WITHIN MANUFACTURER'S TOLERANCES. <br />ALL INFORMATION SHALL BE COMPLETED AS <br />PER THE MANUFACTURER'S WARRANTY <br />DOCUMENTATION. <br />TANK HOLE EXCAVATION, AND BACKFILL PROCEDURES <br />16 FILTER FABRIC <br />15 <br />le 2' <br />MIN. <br />(IFT OF <br />D 3rd <br />L <br />PEA GRAVEL <br />\l\�I oo TO TOP OF <br />TANK <br />• �'\ 2nd LIFT OF PEA GRAVEL <br />••.. \ 1st LIFT OF PEA GRAVEL <br />MIN.c4_ BED <br />18" <br />1'-0" MIN. PEA GRAVEL INSTALLED <br />OVER COMPACTED SOIL. IN WET HOLE <br />INSTALLATIONS, INCREASE TO 18" <br />MINIMUM PER MANUFACTURE'S <br />RECOMMENDED INSTALLATION <br />GUIDELINES. <br />NOTES: UST INSTALLATION <br />3TRAP <br />TANI," <br />1O <br />SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. <br />OFIBER <br />REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT <br />QSAFETY. <br />CONCRETE. <br />OREINFORCING <br />BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FROM <br />1 c' <br />SURFACE. <br />OREINFORCE <br />CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" IN <br />15' <br />LENGTH, PLACE REBAR 6 FROM SIDES OF BOX. <br />ONOT <br />USED. <br />ONOT <br />USED. <br />le <br />USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN )b°' & <br />OMAX <br />OF )4" IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. ALL <br />QNOT <br />SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S FIELD <br />Q6 <br />REPRESENTATIVE. <br />O <br />NOT USED. <br />ONOT <br />USED. <br />10 <br />NOT USED. <br />11 <br />NOT USED. <br />QNOT <br />USED. <br />QTANK <br />PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER <br />ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY <br />THE FOOTPRINT OF THE TANKS. <br />14 <br />CUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE CORNERS WHERE <br />MEETING CONCRETE. <br />15 <br />NOT USED. <br />16 <br />NOT USED. <br />SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, PLACEMENT, AND <br />ORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED BY THE <br />1 <br />LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL LOCATION <br />SIGN --OFF SHALL BE DOCUMENTED. <br />16 FILTER FABRIC <br />15 <br />le 2' <br />MIN. <br />(IFT OF <br />D 3rd <br />L <br />PEA GRAVEL <br />\l\�I oo TO TOP OF <br />TANK <br />• �'\ 2nd LIFT OF PEA GRAVEL <br />••.. \ 1st LIFT OF PEA GRAVEL <br />MIN.c4_ BED <br />18" <br />1'-0" MIN. PEA GRAVEL INSTALLED <br />OVER COMPACTED SOIL. IN WET HOLE <br />INSTALLATIONS, INCREASE TO 18" <br />MINIMUM PER MANUFACTURE'S <br />RECOMMENDED INSTALLATION <br />GUIDELINES. <br />1 <br />NOTE: STR (%PS ARE RATED AT MINIMUM <br />25, 000 LYS, <br />GALVANIZED STRAP EYE <br />GALVANIZED STRAP EYE <br />CD_ <br />TANK STRAP DETAILS <br />J <br />SCALE: 1/2 <br />NOTES: UST ANCHORING <br />3TRAP <br />TANI," <br />.Slit= <br />WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO ASSURE WORKMEN <br />LENGTH 'L' <br />SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY WITH OSHA <br />QSAFETY. <br />CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 SUBPART P, OSHA <br />6' <br />STANDARDS -EXCAVATIONS: FINAL RULE OCTOBER 1, 1989. HARDHATS SHALL BE WORN <br />1 c' <br />BY ALL WORKMEN OPERATING IN EXCAVATION OR WHERE OVERHEAD WORK IS <br />G' <br />PROGRESSING. <br />15' <br />ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR IS <br />QTANK <br />REQUIRED BY LOCAL REGULATION. CONSULT WITH OWNER'S REPRESENTATIVE. <br />QINSTALL <br />DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION INSTRUCTIONS. <br />le <br />AND QUANTITIES OF DEADMAN FOR 10' DIA. TANKS PER MANUFACTURER <br />L�DIMENSIONS <br />SPECIFICATIONS. <br />QNOT <br />USED <br />Q6 <br />EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br />QHOLD <br />DOWN STRAPS ARE REQUIRED FOR 20,000 & 22,000 GALLON TANKS AS <br />SPECIFIED AND SUPPLIED BY TANK MANUFACTURER, <br />8 <br />LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br />WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND THROUGH THE <br />QFASTEN <br />END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL BE ALTERNATED 180' FROM <br />EACH OTHER. <br />ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY <br />1 <br />TIGHTEN ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. <br />MEASURE TANK DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO ENSURE NO <br />TANK DEFLECTION. <br />1 <br />WIRE ROPE MINIMUM DIAMETER 1/2", OR AS PER MANUFACTURER'S SPECIFICATIONS <br />QTURNBUCKLES: <br />1 <br />HOOK TYPE - 1-1/4" DIAMETER, JAW TYPE - 3/4" DIAMETER, EYE <br />TYPE - 3/4" DIAMETER <br />COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING BARS WITH <br />1 <br />PITCHMASTIC. <br />INSTALL USTs SO THAT TOP OF TANKS ARE AT SAME HEIGHT. <br />/a <br />IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION MUST BE 4 FT. <br />L� <br />FROM BOTH SIDES AND ENDS WITH FIBERGLASS TANKS <br />FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR WET HOLE <br />1 <br />INSTALLATIONS. FABRIC MUST EXTEND TO SLAB AND MAY BE PINNED TO SIDE OF HOLE <br />WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. <br />1 <br />NOTE: STR (%PS ARE RATED AT MINIMUM <br />25, 000 LYS, <br />GALVANIZED STRAP EYE <br />GALVANIZED STRAP EYE <br />CD_ <br />TANK STRAP DETAILS <br />J <br />SCALE: 1/2 <br />-ALUN MH S7PAP GLI I BE <br />4' TANK B-6LIIDES <br />6' TANK 4 -GUIDES <br />8' TANK 4 -GUIDES <br />10' TANI, 4 -GUIDES ` <br />12? TANK 3 -GUIDE'S <br />LN: <br />(QTY. 2) #7 DEBAR <br />/)LUPE N —1 STPAP GUIDE <br />CALVAN17EI .STRAP EYE <br />FFP PIULTRUDED TR6P <br />4,000 PSI CONCRETE <br />(QTY. 2) #6 REBAR <br />TYPICAL CONCRETE DEADMAN <br />QTY <br />HEILR-=DOWN <br />3TRAP <br />TANI," <br />.Slit= <br />STPAP <br />LENGTH 'L' <br />W <br />DLA. <br />?w' -4 1/4' <br />6' <br />311. <br />1 c' <br />-1' <br />G' <br />DIA, <br />15' <br />—1. <br />10, <br />DLA <br />3' <br />-a 3r4' <br />le <br />DIA, <br />EL' <br />-6 3 4' <br />-ALUN MH S7PAP GLI I BE <br />4' TANK B-6LIIDES <br />6' TANK 4 -GUIDES <br />8' TANK 4 -GUIDES <br />10' TANI, 4 -GUIDES ` <br />12? TANK 3 -GUIDE'S <br />LN: <br />(QTY. 2) #7 DEBAR <br />/)LUPE N —1 STPAP GUIDE <br />CALVAN17EI .STRAP EYE <br />FFP PIULTRUDED TR6P <br />4,000 PSI CONCRETE <br />(QTY. 2) #6 REBAR <br />TYPICAL CONCRETE DEADMAN <br />QTY <br />UNIT <br />DESCRIPTION <br />4 <br />EA <br />DEADMAN, 8 3/4'x18'x18" <br />EA <br />12 <br />EA <br />GALVANIZED ANCHOR POINT <br />12 <br />EA <br />COTTER PIN <br />500 WEST CAPITOL AVENUE <br />WEST SACRAMENTO, CA <br />95605 <br />P.O. BOX 15618 SACRAMENTO, CA <br />95852 <br />REVISIONS <br />�G H A CIS <br />� U <br />O Z <br />2 � <br />Grr�NG ENG�N��� <br />"LAND PLANNING AND DESIGN SPECIALISTS" <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251 --6222 <br />Q SHEET TITLE <br />TYPICAL TANK <br />ANCHORING <br />DETAILS <br />PROJECT NAME <br />IALEY'S <br />#356 <br />FRONTAGE ROAD & <br />MORADA LANE <br />STOCKTON, CALIFORNIA <br />Ig PROJECT NO, <br />2.3208.000 <br />Q DRAWN BY <br />SCALE <br />AS SHOWN <br />DATE <br />23 JUNE 2005 <br />ED PAGE NO. <br />TK6-1 <br />SHEET OF <br />