/�4
<br />+/r
<br />O
<br />Q
<br />EMERGENCY PUMP
<br />SHUT-OFF SWITCH
<br />(DUAL HOSE PER SIDE
<br />BLENDING 3 + 1
<br />PRODUCT MPD)
<br />17
<br />ISLAND BUMPER
<br />POST (TYP. 4 PLCS.)
<br />2" DW FRP
<br />PRODUCT LINES
<br />(DUAL HOSE PER SIDE
<br />BLENDING 3 + 1
<br />PRODUCT MPD)
<br />2" DW FRP
<br />3" DW FRP(_6 ..
<br />TANK PAD
<br />TURBINE (TYP.)
<br />(E)CE19
<br />FILL, VENT, STAGE I & STAGE 11
<br />VAPOR RETURN AND GAUGE (TYP.)
<br />3 4 13 14 15 18
<br />TANK ANCHORING SYSTEM
<br />i
<br />STATIC GROUND ROD
<br />EMERGENCY PUMP
<br />SHUT-OFF SWITCH
<br />SCALE: 1"=20'-O"
<br />20 0 20 40
<br />w
<br />Cal Tofl Free
<br />1 (800) 2272600
<br />TWO
<br />WORKING DAYS
<br />BEFORE YOU
<br />DIG
<br />0
<br />17 (DUAL HOSE PER SIDE
<br />BLENDING 3 + 1
<br />PRODUCT MPD)
<br />(TYP. SINGLE HOSE
<br />PER SIDE BLENDING 3
<br />PRODUCT MPD)
<br />OVERFILL ALARM/STROBE
<br />AND ACKNOWLEDGE
<br />SWITCH. INSTALL
<br />EMERGENCY PUMP
<br />SHUTOFF SWITCH PER UFC
<br />REQUIREMENTS
<br />INSTALL VENT PIPING TERMINATION
<br />BOX
<br />(3) 2" DIA. GALV. STEEL VENT RISERS
<br />WRAPPED TO GRADE. PAINT TO MATCH
<br />SITE CONDITIONS ROUTE (2) SPARE 1"
<br />CONDUITS TO INTRINSICALLY SAFE WIREWAY
<br />INSTALL HEALEY CLEAN AIR SEPARATOR TANK
<br />AND PIPING PER EVR PHASE 11 REQUIREMENTS.
<br />INSTALLATION SHALL BE PER NEW CARB
<br />EXECUTIVE ORDER AND PER MANUFACTURERS
<br />INSTALLATION INSTRUCTIONS
<br />Compliance Notes:
<br />A4D
<br />1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES,
<br />ELEVATIONS AND EQUIPMENT LOCATIONS
<br />2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY
<br />DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH
<br />THE WORK.
<br />3• GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0"
<br />OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND.
<br />4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK
<br />OPERATIONS.
<br />5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL
<br />CODES AND GOVERNING AUTHORITIES.
<br />6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED.
<br />7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
<br />S. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK
<br />INSTALLATION.
<br />g. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4)
<br />SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS):
<br />A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST.
<br />B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES,
<br />C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH
<br />MANUFACTURER'S GUIDELINES.
<br />D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM.
<br />10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH
<br />STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT.
<br />RECORD THE TEST RESULTS AND SUBMIT TO OWNER.
<br />11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING
<br />AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION.
<br />12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK
<br />AND DISPENSER SUMPS.
<br />13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION
<br />WITHIN 30 DAYS OF THE FINAL INSPECTION.
<br />14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY TANK OWNER).
<br />15. TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK
<br />SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK SYSTEM IS
<br />PRODUCT TIGHT:
<br />1) ENHANCED LEAK DETECTION ELD TEST (TRACER TIGHT ne) BY PRAXAIR OR LICENSED AFFILIATE.
<br />2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD
<br />3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN
<br />REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED
<br />AND TESTED IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF CALIFORNIA HEALTH AND SAFETY
<br />CODE SECTION 25292.5.
<br />16. REFERENCED CODES SHALL INCLUDE 2001 CBC; 2001 CFC, ARTICLE 79; 2001 CEC; 2001 CMC.
<br />17. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER
<br />SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT.
<br />VEEDER ROOT ALARM
<br />MONITOR SYSTEM
<br />EMERGENCY PUMP
<br />SHUT-OFF SWITCH
<br />AND RESET (INDOOR)
<br />a
<br />Piping Legend & General Notes:
<br />PIPING LEGEND '- 3" OVER 2" DOUBLE WALL FIBERGLASS PRODUCT PIPING
<br />3" OVER 2" OR 4" OVER 3" F.G. DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING
<br />— "'- — — — — — — — — — — 3" OVER 2" F.G. DOUBLE WALL FIBERGLASS VENT PIPING
<br />G EXISTING UNDERGROUND UTILITIES (WATER, GAS, TELEPHONE, SEWER)
<br />NOTE:
<br />CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN
<br />INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD
<br />CONDITIONS AND INSTALLATION TECHNIQUES.
<br />• PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT
<br />PREFERRED. SIPHON PIPING TO SLOPE 1/4" PER FOOT.
<br />* SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT, VENT AND
<br />VAPOR RECOVERY PIPING TO BE DOUBLE CONTAINMENT PIPE, PRODUCT PIPING TO BE ROUTED IN
<br />CONTAINMENT DUCT.
<br />* IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK & PIPING SYSTEM COMPLIANT WITH AB -2481 REQUIREMENTS
<br />FOR CONTINUOUS MONITORING OF ALL TANK & PIPING SYSTEM COMPONENTS. ALI_ DOUBLE WALT. PRODUCT, VENT
<br />AND VAPOR RECOVERY PIPING SHALL BE MONITORED VIA CONTINUOUS VACUUM MONITORING. ALL TANK TURBINE
<br />SUMPS, FILL SUMPS, DISPENSER SUMPS AND VENT TRANSITION SUMP SHALL BE MONITORED BY CONTINUOUS
<br />HYDROSTATIC SENSORS. ALL TANK ANNULAR SPACES SHALL BE MONITORED BY CONTINUOUS HYDROSTATIC
<br />SENSORS. ALL MONITORING DEVICES & SYSTEMS SHALL BE CERTIFIED FOR USE IN CA UNDER LG -113 AND THE
<br />NATIONAL LEAK DETECTION WORKGROUP.
<br />Tank & Piping Installation Notes:
<br />INSTALL ONE (1) 20K REGULAR UNLEADED, ONE (1) 12K/10K PREMIUM UNLEADED/REGULAR UNLEADED DUAL COMPARTMENT
<br />DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING OF HYDROSTATIC ANNULAR SPACES BY "VEEDER ROOT" TLS -350
<br />TANK AND PIPING MONITOR AND ALARM SYSTEM. ALL TANK SUMPS SHALL BE DOUBLE WALL FROM COLLAR TO THE BOTTOM OF
<br />TANK SLAB. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" MINI HYDROSTATIC SENSORS AND
<br />STANDARD LIQUID SENSORS TIED INTO THE TLS --350 TANK & PIPING MONITOR AND ALARM SYSTEM PER LG -162-1 REQUIREMENTS.
<br />TANKS TO BE SET MIN. 50" BELOW FINISH GRADE. SEE DETAILS FOR ADDITIONAL INFORMATION. TANKS TO BE ANCHORED
<br />UTILIZING XERXES SUPPLIED DEADMEN ANCHORS AND STRAPS. TANK INSTALLATION & ANCHORING SHALL BE IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTALLATION INSTRUCTIONS.
<br />0
<br />INSTALL A 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS, SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY
<br />FORMING A CONCRETE CROWN WITH A 2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION.
<br />TANK SLAB SHALL BE THICKENED AT TANK SUMPS TO BE JUST BELOW TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER
<br />AB -2481 REQUIREMENTS. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS ON
<br />DRAWINGS M.5.10.12, M.5.10.15 AND M.5.10.25.
<br />'O
<br />INSTALL FOUR (3) 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. (1) AT EACH TANK, AND (1) AT DIESEL
<br />REMOTE FILL BOX.
<br />®
<br />INSTALL FOUR (2) 3" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. (1) AT EACH GASOLINE TANK.
<br />0
<br />INSTALL ONE (1) 2 HP FIX SPEED TURBINE EACH OF THE (3) UNDERGROUND STORAGE TANKS. INSTALL VACUUM SOURCES IN ALL TURBINES FOR
<br />VACUUM MONITORING REQUIREMENTS, TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO
<br />ui
<br />BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST. SET TURBINE
<br />INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES AND
<br />CONTROLLERS AS TO WHICH PRODUCT THEY SERVE.
<br />©
<br />INSTALL 3" INSIDE 4" DOUBLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR "H.MY" VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER
<br />FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WIRE
<br />WITH VAPOR PIPING.
<br />TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION.
<br />THE VAPOR LINE'S INTERSTITIAL SPACE SHALL BE CONTINUOUSLY VACUUM MONITORED PER LG -162-1 REQUIREMENTS.
<br />INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL ZBP- GASOLINE SUPPLY LINES TO DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S
<br />SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN TO
<br />THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO
<br />BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACES SHALL BE CONTINUOUSLY VACUUM MONITORED
<br />PER LG -162-1 REQUIREMENTS AND TIED INTO THE "VEEDER-ROOT" TLS -350R CONSOLE.
<br />Q
<br />INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL # TLS -3508 IN BUILDING AT NORMALLY OCCUPIED
<br />LOCATION IN BUILDING. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION.
<br />INSTALL THREE (3).2" INSIDE 3" DOUBLE WALL ERP _VENT LINES. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN.
<br />CONTRACTOR TO INSTALL TRACER NRE WITH VENT PIPING, THE INTERSTITIAL SPACE OF EACH OF THE VENT LINES SHALL BE CONTINUOUSLY
<br />MONITORED VIA A VACUUM SENSOR TIED INTO THE "VEEDER-ROOT" TLS -350R CONSOLE PER LG --162-1 REQUIREMENTS. THE DOUBLE WALL VENT
<br />PIPING SHALL BE TERMINATED IN A DOUBLE WALL VENT TERMINATION SUMP THAT WILL BE HYDROSTATICALLY MONITORED AND WILL ALSO HAVE A
<br />LIQUID SENSOR INSTALLED PER LG -162-1 REQUIREMENTS.
<br />10
<br />TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE
<br />THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) SPARE
<br />1" CONDUITS W/ PULL ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS. INSTALL HEALY CLEAN AIR
<br />SEPARATOR TANK AND ASSOCIATED PIPING AND FITTINGS PER NEW CARB EVR PHASE 11 STANDARDS AND E.O. INSTALLATION SHALL BE PER CARB
<br />E.0 AND MANUFACTURERS INSTRUCTIONS.
<br />11
<br />INSTALL THREE (3) 3/4" RIGID CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). NOTE THAT THE LAST 2 FEET
<br />OF ALL CONDUIT ENTERING TURBINE, FILL, DISPENSER OR VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID CONDUIT.
<br />12
<br />INSTALL TWO (2) DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS.
<br />13
<br />INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VENT, STAGE I AND STAGE It VAPOR RECOVERY AT TURBINE SIDE SUMP
<br />14
<br />INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT EACH NEW FILL SUMP LOCATION.
<br />15
<br />TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL MANHOLES.
<br />16
<br />CONTRACTOR TO INSTALL A NEW HEALY CLEAN AIR SEPARATOR ORVR/EVR PHASE II COMPLIANT UNIT AT THE NEW VENT RISER AREA.
<br />INSTALLATION AND EQUIPMENT TO COMPLY WITH EXECUTIVE ORDER #VR -201--A, AND SHALL BE IN CONFORMANCE WITH NFPA 30 & 30A.
<br />17
<br />INSTALL (3) GILBARCO ENCORE SERIES (3+0) SINGLE HOSE PER SIDE, AND (3) GILBARCO ENCORE SERIES (3+1) DUAL HOSE PER SIDE,
<br />MULTI -PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH "HEALY" VAPOR ASSIST STAGE 11 HOSES AND NOZZLES, BREAKAWAY
<br />VALVES PER NEW CARB EVR PHASE II REQUIREMENTS. INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND
<br />MONITORING SENSORS. DISPENSER SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY
<br />MONITORED PER LG -162-1 COMPLIANCE OPTION. THE LAST 2 FEET OF ALL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID.
<br />START UP BY MANUFACTURER REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH
<br />HOSE/NOZZLE, ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS
<br />WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS
<br />TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW FILTERS,
<br />1$
<br />FILL AND STAGE I VAPOR RECOVERY RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS. GROUND ROD SHALL
<br />BE DRIVEN IN NATIVE SOIL.
<br />19
<br />ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE
<br />FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD AND MAIN PRODUCT LINES OR SHALL PROVIDE AT LEAST 4 FEET OF
<br />STRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES.
<br />20
<br />INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED
<br />TO PROVIDE AN UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE.
<br />BE f I
<br />N, HILL
<br />FOODS
<br />500 WEST CAPITOL AVENUE
<br />WEST SACRAMENTO, CA
<br />95605
<br />P.O. BOX 15618 SACRAMENTO, CA
<br />95852
<br />Lj REVISIONS
<br />HW
<br />H A (S
<br />s7 U
<br />O
<br />2� ?
<br />GCT7NC ENG\0F
<br />"LAND PLANNING AND DESIGN SPECIALISTS"
<br />18215 72ND AVENUE SOUTH
<br />KENT, WASHINGTON 98032
<br />(425) 251-6222
<br />SHEET TITLE
<br />UST AND
<br />PIPING INSTALL
<br />SITE PLAN
<br />0 PROJECT NAME
<br />RALEY'S
<br />#356
<br />FRONTAGE ROAD &
<br />MORADA LANE
<br />STOCKTON, CALIFORNIA
<br />PROJECT NO.
<br />2.3208.000
<br />DRAWN BY
<br />SCALE
<br />AS SHOWN
<br />DATE
<br />23 JUNE 2005
<br />PAGE NO.
<br />TK1-1
<br />SHEET OF
<br />
|