Laserfiche WebLink
/�4 <br />+/r <br />O <br />Q <br />EMERGENCY PUMP <br />SHUT-OFF SWITCH <br />(DUAL HOSE PER SIDE <br />BLENDING 3 + 1 <br />PRODUCT MPD) <br />17 <br />ISLAND BUMPER <br />POST (TYP. 4 PLCS.) <br />2" DW FRP <br />PRODUCT LINES <br />(DUAL HOSE PER SIDE <br />BLENDING 3 + 1 <br />PRODUCT MPD) <br />2" DW FRP <br />3" DW FRP(_6 .. <br />TANK PAD <br />TURBINE (TYP.) <br />(E)CE19 <br />FILL, VENT, STAGE I & STAGE 11 <br />VAPOR RETURN AND GAUGE (TYP.) <br />3 4 13 14 15 18 <br />TANK ANCHORING SYSTEM <br />i <br />STATIC GROUND ROD <br />EMERGENCY PUMP <br />SHUT-OFF SWITCH <br />SCALE: 1"=20'-O" <br />20 0 20 40 <br />w <br />Cal Tofl Free <br />1 (800) 2272600 <br />TWO <br />WORKING DAYS <br />BEFORE YOU <br />DIG <br />0 <br />17 (DUAL HOSE PER SIDE <br />BLENDING 3 + 1 <br />PRODUCT MPD) <br />(TYP. SINGLE HOSE <br />PER SIDE BLENDING 3 <br />PRODUCT MPD) <br />OVERFILL ALARM/STROBE <br />AND ACKNOWLEDGE <br />SWITCH. INSTALL <br />EMERGENCY PUMP <br />SHUTOFF SWITCH PER UFC <br />REQUIREMENTS <br />INSTALL VENT PIPING TERMINATION <br />BOX <br />(3) 2" DIA. GALV. STEEL VENT RISERS <br />WRAPPED TO GRADE. PAINT TO MATCH <br />SITE CONDITIONS ROUTE (2) SPARE 1" <br />CONDUITS TO INTRINSICALLY SAFE WIREWAY <br />INSTALL HEALEY CLEAN AIR SEPARATOR TANK <br />AND PIPING PER EVR PHASE 11 REQUIREMENTS. <br />INSTALLATION SHALL BE PER NEW CARB <br />EXECUTIVE ORDER AND PER MANUFACTURERS <br />INSTALLATION INSTRUCTIONS <br />Compliance Notes: <br />A4D <br />1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, <br />ELEVATIONS AND EQUIPMENT LOCATIONS <br />2. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. ANY <br />DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH <br />THE WORK. <br />3• GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" <br />OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. <br />4. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK <br />OPERATIONS. <br />5. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL <br />CODES AND GOVERNING AUTHORITIES. <br />6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. <br />7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br />S. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK <br />INSTALLATION. <br />g. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) <br />SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): <br />A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. <br />B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES, <br />C. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH <br />MANUFACTURER'S GUIDELINES. <br />D. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. <br />10. ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH <br />STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. <br />RECORD THE TEST RESULTS AND SUBMIT TO OWNER. <br />11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING <br />AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. <br />12. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES OF TANK <br />AND DISPENSER SUMPS. <br />13. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION <br />WITHIN 30 DAYS OF THE FINAL INSPECTION. <br />14. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY TANK OWNER). <br />15. TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK <br />SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK SYSTEM IS <br />PRODUCT TIGHT: <br />1) ENHANCED LEAK DETECTION ELD TEST (TRACER TIGHT ne) BY PRAXAIR OR LICENSED AFFILIATE. <br />2) AN INERT GAS PRESSURE TEST THAT HAS BEEN CERTIFIED BY A THIRD PARTY AND APPROVED BY THE BOARD <br />3) A TEST METHOD DEEMED EQUIVALENT TO ENHANCED LEAK DETECTION OR AN INERT GAS PRESSURE TEST BY THE BOARD IN <br />REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE. AN UNDERGROUND STORAGE TANK INSTALLED <br />AND TESTED IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS OF CALIFORNIA HEALTH AND SAFETY <br />CODE SECTION 25292.5. <br />16. REFERENCED CODES SHALL INCLUDE 2001 CBC; 2001 CFC, ARTICLE 79; 2001 CEC; 2001 CMC. <br />17. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER <br />SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT. <br />VEEDER ROOT ALARM <br />MONITOR SYSTEM <br />EMERGENCY PUMP <br />SHUT-OFF SWITCH <br />AND RESET (INDOOR) <br />a <br />Piping Legend & General Notes: <br />PIPING LEGEND '- 3" OVER 2" DOUBLE WALL FIBERGLASS PRODUCT PIPING <br />3" OVER 2" OR 4" OVER 3" F.G. DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING <br />— "'- — — — — — — — — — — 3" OVER 2" F.G. DOUBLE WALL FIBERGLASS VENT PIPING <br />G EXISTING UNDERGROUND UTILITIES (WATER, GAS, TELEPHONE, SEWER) <br />NOTE: <br />CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN <br />INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br />CONDITIONS AND INSTALLATION TECHNIQUES. <br />• PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT <br />PREFERRED. SIPHON PIPING TO SLOPE 1/4" PER FOOT. <br />* SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT, VENT AND <br />VAPOR RECOVERY PIPING TO BE DOUBLE CONTAINMENT PIPE, PRODUCT PIPING TO BE ROUTED IN <br />CONTAINMENT DUCT. <br />* IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK & PIPING SYSTEM COMPLIANT WITH AB -2481 REQUIREMENTS <br />FOR CONTINUOUS MONITORING OF ALL TANK & PIPING SYSTEM COMPONENTS. ALI_ DOUBLE WALT. PRODUCT, VENT <br />AND VAPOR RECOVERY PIPING SHALL BE MONITORED VIA CONTINUOUS VACUUM MONITORING. ALL TANK TURBINE <br />SUMPS, FILL SUMPS, DISPENSER SUMPS AND VENT TRANSITION SUMP SHALL BE MONITORED BY CONTINUOUS <br />HYDROSTATIC SENSORS. ALL TANK ANNULAR SPACES SHALL BE MONITORED BY CONTINUOUS HYDROSTATIC <br />SENSORS. ALL MONITORING DEVICES & SYSTEMS SHALL BE CERTIFIED FOR USE IN CA UNDER LG -113 AND THE <br />NATIONAL LEAK DETECTION WORKGROUP. <br />Tank & Piping Installation Notes: <br />INSTALL ONE (1) 20K REGULAR UNLEADED, ONE (1) 12K/10K PREMIUM UNLEADED/REGULAR UNLEADED DUAL COMPARTMENT <br />DOUBLE WALL FIBERGLASS TANKS WITH CONTINUOUS MONITORING OF HYDROSTATIC ANNULAR SPACES BY "VEEDER ROOT" TLS -350 <br />TANK AND PIPING MONITOR AND ALARM SYSTEM. ALL TANK SUMPS SHALL BE DOUBLE WALL FROM COLLAR TO THE BOTTOM OF <br />TANK SLAB. SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY "VEEDER ROOT" MINI HYDROSTATIC SENSORS AND <br />STANDARD LIQUID SENSORS TIED INTO THE TLS --350 TANK & PIPING MONITOR AND ALARM SYSTEM PER LG -162-1 REQUIREMENTS. <br />TANKS TO BE SET MIN. 50" BELOW FINISH GRADE. SEE DETAILS FOR ADDITIONAL INFORMATION. TANKS TO BE ANCHORED <br />UTILIZING XERXES SUPPLIED DEADMEN ANCHORS AND STRAPS. TANK INSTALLATION & ANCHORING SHALL BE IN ACCORDANCE WITH <br />MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />0 <br />INSTALL A 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS, SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY <br />FORMING A CONCRETE CROWN WITH A 2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. <br />TANK SLAB SHALL BE THICKENED AT TANK SUMPS TO BE JUST BELOW TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER <br />AB -2481 REQUIREMENTS. CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS ON <br />DRAWINGS M.5.10.12, M.5.10.15 AND M.5.10.25. <br />'O <br />INSTALL FOUR (3) 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS. (1) AT EACH TANK, AND (1) AT DIESEL <br />REMOTE FILL BOX. <br />® <br />INSTALL FOUR (2) 3" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS AND CAPS. (1) AT EACH GASOLINE TANK. <br />0 <br />INSTALL ONE (1) 2 HP FIX SPEED TURBINE EACH OF THE (3) UNDERGROUND STORAGE TANKS. INSTALL VACUUM SOURCES IN ALL TURBINES FOR <br />VACUUM MONITORING REQUIREMENTS, TURBINE SYSTEMS TO BE EQUIPPED WITH 3 GPH ELECTRONIC LINE LEAK DETECTION. LEAK DETECTORS ARE TO <br />ui <br />BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST. SET TURBINE <br />INTAKES AT 5" FROM BOTTOM OF TANKS. TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS. CONTRACTOR IS TO LABEL TURBINES AND <br />CONTROLLERS AS TO WHICH PRODUCT THEY SERVE. <br />© <br />INSTALL 3" INSIDE 4" DOUBLE WALL FIBERGLASS STAGE II VAPOR RECOVERY HEADER FOR "H.MY" VAPOR RECOVERY SYSTEM. SLOPE 1/8" PER <br />FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WIRE <br />WITH VAPOR PIPING. <br />TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br />THE VAPOR LINE'S INTERSTITIAL SPACE SHALL BE CONTINUOUSLY VACUUM MONITORED PER LG -162-1 REQUIREMENTS. <br />INSTALL THREE (3) 2" INSIDE 3" DOUBLE WALL ZBP- GASOLINE SUPPLY LINES TO DISPENSERS. PIPING SHALL BE INSTALLED PER MANUFACTURER'S <br />SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN TO <br />THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO <br />BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACES SHALL BE CONTINUOUSLY VACUUM MONITORED <br />PER LG -162-1 REQUIREMENTS AND TIED INTO THE "VEEDER-ROOT" TLS -350R CONSOLE. <br />Q <br />INSTALL "VEEDER ROOT" TANK AND LINE ALARM CONTROL PANEL MODEL # TLS -3508 IN BUILDING AT NORMALLY OCCUPIED <br />LOCATION IN BUILDING. SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION. <br />INSTALL THREE (3).2" INSIDE 3" DOUBLE WALL ERP _VENT LINES. SLOPE 1/4" PER FOOT (1/8" PER FOOT MINIMUM) TO TANKS AS SHOWN. <br />CONTRACTOR TO INSTALL TRACER NRE WITH VENT PIPING, THE INTERSTITIAL SPACE OF EACH OF THE VENT LINES SHALL BE CONTINUOUSLY <br />MONITORED VIA A VACUUM SENSOR TIED INTO THE "VEEDER-ROOT" TLS -350R CONSOLE PER LG --162-1 REQUIREMENTS. THE DOUBLE WALL VENT <br />PIPING SHALL BE TERMINATED IN A DOUBLE WALL VENT TERMINATION SUMP THAT WILL BE HYDROSTATICALLY MONITORED AND WILL ALSO HAVE A <br />LIQUID SENSOR INSTALLED PER LG -162-1 REQUIREMENTS. <br />10 <br />TERMINATION POINT OF TANK VENTS TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE <br />THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS. INSTALL TWO (2) SPARE <br />1" CONDUITS W/ PULL ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS. INSTALL HEALY CLEAN AIR <br />SEPARATOR TANK AND ASSOCIATED PIPING AND FITTINGS PER NEW CARB EVR PHASE 11 STANDARDS AND E.O. INSTALLATION SHALL BE PER CARB <br />E.0 AND MANUFACTURERS INSTRUCTIONS. <br />11 <br />INSTALL THREE (3) 3/4" RIGID CONDUITS FOR SUBMERSIBLE PUMP POWER. (ONE FOR EACH TURBINE). NOTE THAT THE LAST 2 FEET <br />OF ALL CONDUIT ENTERING TURBINE, FILL, DISPENSER OR VENT TRANSITION SUMPS SHALL BE PVC COATED RIGID CONDUIT. <br />12 <br />INSTALL TWO (2) DUAL FLOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS. <br />13 <br />INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIES FOR VENT, STAGE I AND STAGE It VAPOR RECOVERY AT TURBINE SIDE SUMP <br />14 <br />INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT EACH NEW FILL SUMP LOCATION. <br />15 <br />TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL MANHOLES. <br />16 <br />CONTRACTOR TO INSTALL A NEW HEALY CLEAN AIR SEPARATOR ORVR/EVR PHASE II COMPLIANT UNIT AT THE NEW VENT RISER AREA. <br />INSTALLATION AND EQUIPMENT TO COMPLY WITH EXECUTIVE ORDER #VR -201--A, AND SHALL BE IN CONFORMANCE WITH NFPA 30 & 30A. <br />17 <br />INSTALL (3) GILBARCO ENCORE SERIES (3+0) SINGLE HOSE PER SIDE, AND (3) GILBARCO ENCORE SERIES (3+1) DUAL HOSE PER SIDE, <br />MULTI -PRODUCT DISPENSERS AS SHOWN. DISPENSERS TO BE FITTED WITH "HEALY" VAPOR ASSIST STAGE 11 HOSES AND NOZZLES, BREAKAWAY <br />VALVES PER NEW CARB EVR PHASE II REQUIREMENTS. INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND <br />MONITORING SENSORS. DISPENSER SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY <br />MONITORED PER LG -162-1 COMPLIANCE OPTION. THE LAST 2 FEET OF ALL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID. <br />START UP BY MANUFACTURER REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH <br />HOSE/NOZZLE, ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS <br />WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING, CONTRACTOR IS <br />TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW FILTERS, <br />1$ <br />FILL AND STAGE I VAPOR RECOVERY RISERS SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS. GROUND ROD SHALL <br />BE DRIVEN IN NATIVE SOIL. <br />19 <br />ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE <br />FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD AND MAIN PRODUCT LINES OR SHALL PROVIDE AT LEAST 4 FEET OF <br />STRAIGHT FRP PIPE RUN BEFORE A CHANGE OF DIRECTION OF MORE THAN 30 DEGREES. <br />20 <br />INSTALL OVERFILL ALARM & ACKNOWLEDGMENT SWITCH, ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN. ALARM AND SWITCH TO BE LOCATED <br />TO PROVIDE AN UNOBSTRUCTED VIEW TO TRUCK DRIVER. PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE. <br />BE f I <br />N, HILL <br />FOODS <br />500 WEST CAPITOL AVENUE <br />WEST SACRAMENTO, CA <br />95605 <br />P.O. BOX 15618 SACRAMENTO, CA <br />95852 <br />Lj REVISIONS <br />HW <br />H A (S <br />s7 U <br />O <br />2� ? <br />GCT7NC ENG\0F <br />"LAND PLANNING AND DESIGN SPECIALISTS" <br />18215 72ND AVENUE SOUTH <br />KENT, WASHINGTON 98032 <br />(425) 251-6222 <br />SHEET TITLE <br />UST AND <br />PIPING INSTALL <br />SITE PLAN <br />0 PROJECT NAME <br />RALEY'S <br />#356 <br />FRONTAGE ROAD & <br />MORADA LANE <br />STOCKTON, CALIFORNIA <br />PROJECT NO. <br />2.3208.000 <br />DRAWN BY <br />SCALE <br />AS SHOWN <br />DATE <br />23 JUNE 2005 <br />PAGE NO. <br />TK1-1 <br />SHEET OF <br />