Laserfiche WebLink
8. a. Describe the method that will be utilized to purge andlor inert the tank(s): <br /> b. TankMPingpr. <br /> Haule /� <br /> Name I -r4- f` <br /> Address City ZIP <br /> Phone No.( <br /> Hauler Registration f+(if hauled as bazardous) <br /> C. TanMPing Disposal Site: <br /> Name <br /> Address City ZIP <br /> Phone No( 1 <br /> EPA M#(if transported to a permitted TSD facility) <br /> 9. is the sampling firm an Independent third party from the contractor? YES< NO[[ <br /> 9a. Describe,In detan,bow the son and/or water sample(s)beneath the tank and piping will be obtained: <br /> i, <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> 11. Handling o[excavated soI:l <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Sall Hazardous Waste Hauler. <br /> Name Hauler Registration d <br /> Address Clty Zip <br /> Phone No.( ) <br /> EH 23 046(Revised 08113199) Page 5 <br /> j <br />