Laserfiche WebLink
SWRCB,January 2002 Page 2. <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑I{ Tank Manufacturer Industry Standard Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: M Pressure Vacuum Hydrostatic <br /> El Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> PlpingRm# 1 UNL REG pipingR,,# 2 SUP SUP PipiugRm# Piping Rue# <br /> Piping Material: fiberglass fiberglass <br /> Piping Manufacturer: smith smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 40' 40' <br /> Product Stored: UNLEADED SUPREME <br /> Method and location of sump sump <br /> piping-ran isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min <br /> starting test: <br /> Test Start Time: 8:36 8:38 <br /> Initial Reading(P4 3psi 3psi <br /> Test End Time: 9:36 9:3 8 <br /> Final Reading(RF ): 3psi 3psi <br /> Test Duration: lhr lhr <br /> Change in Reading(RF-R[ ): 0 0 <br /> Pass/Fail Threshold or 0 0 <br /> Criteria: <br /> Pass �gFail R Pass F <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />