My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designatea'Underground Storage Tank (US Tj�Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name: <br /> Date: <br /> Facilit Address: <br /> Zi Code: <br /> Designated UST Op erator Con duc[in the Ins ection: ;'-,'��,. - ic_. <br /> International Code Council Certification#: �? •!/ Ex iration <br /> Signature, Phone: . - F;M' <br /> FrinrY Yes,N=No,NA=Not Applicable <br /> y <br /> MONITORING PANEL/ALARM HISTORY Y N NA <br /> torin♦;system is owered on and in ro cr operating mode. <br /> orin s stem is no[cutrentl showin an alarms or warnings. <br /> history report/log for the previous month is available,and has been reviewed by the <br /> Hated UST O erator. Attach a co y ofthe alarm histm-v re ort/lo to this form tfavailable. <br /> larm for the revious month has been res onded to a ro riatel . <br /> rs located in tank-to containment sum s have not alarmed in the astmonth---•ist all tank-top sumps where alarms occurred is the-paYi month:ae:Stmrps where an alann Gasoccunedin thepaet month must be inspectedunless aguolif:edservice technician respondedto,and <br /> operly addressed the Cause r f the ahnar.Attach documentation relfbvg appropriate service to this report. <br /> sump inspecBon is regained,recordrendls in item 6.br7otr. <br /> UST SYSTEM INSPECTIONop containment sumps are free of water,debris, and hazardous substance. Sensors are located properly. <br /> Note: Visual inspection o('smnps is only re ed in stmtps rnc�rc un,dorm has occurred in the past month for which there is no service record. <br /> Y N <br /> Sum Location: _ Sunip Location: _ <br /> Surra Locatfde: Sump Location: <br /> Sum�Location:' Sum Loc lion.' <br /> 7 Spill containment structures are free of water,debris, and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1 —Contents. Tank 3—Contents: <br /> Tank 2— Contents: I I I / Tank 4—Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are locatedro erl . <br /> Y N NA Y N NA <br /> Dispenser 112 Dispenser 9110 <br /> Dis enser 3/4 Dispenser 11/12 <br /> DIS enser S/6 Dis tenser 73/14 <br /> Dimenser 7/8 Dis penser 15/16 <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitorin s stem certification has been completed within past 12 months. <br /> 10 Seconda containment tests have been completed within the required timeframe. <br /> 11 S ill containment stmeture(bucket)testingwas completed within the past year. <br /> 12 Tank ti htness testin was com leted within re uired timeframe. <br /> 13 Line tightness testing was completed within required timeframe. <br /> 14 Other required testing/maintenance was completed within required timeframe. (List tesf/maintenance items below.) <br /> TestlMaintenance: <br /> Test/Maintenance- <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING YN NA <br /> 15 1 All facility employees have received the required on-the-job training within the past year. <br /> 16 1 All facility employees hired within the past 30 days have received the required on-the-job training. <br /> Note: Any answer of"N" should be explained in the comment section on the following page, and will require <br /> follow-up action. <br /> Page 1 of 2 September 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.