Laserfiche WebLink
02/28/2011 MON 10:32 FAX 2094683433 SJC END 12001 <br /> x+++++xxxxxx+x+++++++ <br /> *** FAX TX REPORT *** <br /> ++xxxxx+++++++++++xx+ <br /> TRANSMISSION OK <br /> JON NO. 3976 <br /> DESTINATION ADDRESS 919512705116 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID <br /> ST. TIME 02/28 10:31 <br /> USAGE T 01, 01 <br /> PGS. 2 <br /> RESULT OK <br /> San Joaquin County <br /> OPgU1N C Environmental Health Department DIRECTOR <br /> Donna Heran,REHS <br /> 600 East Main Street <br /> " < Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesoo,RENS,RDI <br /> Oq /F O RN`P Website:www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209)468-3420 Linda Turkatte,REHS <br /> February 17, 2011 Fax: (209)464.0138 <br /> Dulcinea Coven <br /> Walton Engineering, Inc <br /> PO Box 1025 <br /> West Sacramento, CA, 95691 <br /> Re: Circle K#2701205 SR0061978 <br /> 16470 Cambridge Drive, Lathrop, CA, 95330 <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to install a VMI 99 LD-2000 leak detector on the underground <br /> storage tank(UST)system at the above noted address. The permit has been approved with the <br /> following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Thuy Tran at(209)468-8257 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval. <br /> a. Leak detector test: Leak detector must be tested to confirm that the device can <br /> detect a leak of 3 gallons per hour at 10 psi. <br /> Please be aware that the facility cannot operate the 87 tank prior to the EHD <br /> inspection and approval. <br /> 4. Update and submit a copy of the"UST Monitoring Plan"for EHD approval. An approved <br /> copy will be returned for on site records. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br />