Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> C in fete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Cl Yes No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to oper te, or is electrically disco ected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply)AQ umpfri'mch Sensors; epenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; ❑ No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention.valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? V. <br /> Yes* ❑ No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that appll) <br /> ❑ Product; ❑Water. If yes, describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or 'will be corrected. <br /> E. Comments: 91 AWMALAQ— SPac� c�Et1�[s2 i`�P�tLE �1112t Dwelt:6l <br /> C 12T T t�s—r C/��cE� —r�NK�1a�c�IY d ct iF` I ✓ CotJTe�cfot <br /> t LE�y Ao2 /M11-1ED/.4 E Aek- <br />