Laserfiche WebLink
04/19/05 TUE 09:31 FAX 9512705121 CIRCLE K STORES 01006 <br /> SWRCB,January 2002 Page 'S of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By. D Piping Manufacturer yadustrY Standard D Professional Engineer <br /> D Other(Specify) - <br /> Test Method Used: ure D Vacuum D Hydrostatic <br /> D Otter(Specifyl <br /> Test Equipment Used: ia(� . ((, n 1'L� lt(Q5 Equipment Resolution: <br /> Piping Run#Y 7 Piping Run# Piping Run# _ Piping Run# - <br /> Piping Matenal. <br /> Piping Manufact uer: w <br /> Piping Diameter 3` 3 �• <br /> Length of Piping Run: _- <br /> Product Stored: <br /> Method and location of <br /> nm isolation: <br /> Wait time between applying <br /> press relvacuum/water and <br /> starting test <br /> Test Start Time: <br /> Initial Reading(Rr): <br /> Test End Time: <br /> Final Reading 0?,,): <br /> Test Duration: i 6 Ur I t b t 11 <br /> Change in Reading 0R -Ril: <br /> Pass/Fail Threshold or <br /> Criteria: rf XJ <br /> Test'it esuttc D Psas ail i] Passail D Pass D Fail 'U Pass: ❑Fail <br /> COmIUCIIta—(mchide information on repahT2 <br /> ade rior to rerun and recommended ollow- or ailed tests <br /> F'M I Ont g-7 -f q ( SL5r,71V ri �t <br /> /Ven V& 1 h1 i P !l 3 k'L o(t } I-ek./ o0"r S /N 'Tu"I r S <br /> mouse T1sr Robb 5 ARE tN UaC S Arils) Tbo ���k�/c� <br /> Circle K - #2701205 <br /> 16470 Cambridge Dr <br /> Lathrop, CA 95330 <br /> N04312—SB 989 testing <br />