My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/19/05 TUE 10:04 FAX 9512705121 CIRCLE % STORES Z018 <br /> SWRCB,January 2002 �J. 100 1 Page I of� <br /> Circle K - #2701205 5. SECONDARY PIPE TESTING <br /> 16470 Cambridge Dr Piping Manufacturer ®Industry Standard Professional Engineer <br /> Lathrop, CA 95330 Other(Specify) <br /> N04312 —SB 989 testing APressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: see attached testing procedures Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: l 1 <br /> Piping Manufacturer: \ <br /> Piping Diameter: l <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of o 67 t� \ <br /> i io •run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 1` <br /> Test Start Time: `Q <br /> Initial Reading(Rt): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RO: <br /> Pass/Fail Threshold or 0 0 0 0 <br /> _ <br /> Criteria: <br /> _ n <br /> _. <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.