My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/27/04 TaT 07:07 FAX 714 498 8087 TOSCO HARII);RING COMPANY <br /> 2004 <br /> F.I In-Tank Gauging/SHL Equ:vment: XCheck this box if UMk gauging is used only for inventory control. <br /> Q Check this box if no tank gauging or SIA equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folloMM Checklist- <br /> 13 Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy,of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> Q Yes Q Na* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section A,below,describe how and when these deficiencies were or will he corrected. <br /> G. Line Leak Detectors (LLD): ❑ (heck this box if LLDs are not installed. <br /> Co fete the following checklist- <br /> es ❑ No* For equipment start-up or annual equipment catification, was a leak simulated to verify ILD puformance? <br /> ❑ N/A (Check all that apply) Simulated leak rate:X3 g.p.b.; 130.1 g.p.h; 12 0.2 g.p.h. <br /> es ❑ No* Were all LLbs confirmed operational and accurate within regulatorEaleak?ements7 <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> es O No* For mechanical I.Ms,does the LID restrict product flow if it deteMs <br /> Q N/A <br /> ❑ Yes Q No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> A <br /> ❑ Yes ❑ No* For electronic LIDS,does the turbine automatically shut off if any <br /> .KV/A or disconnected? portion of the monitoring system is disabled <br /> ❑ Yes 13 No* For electronic It-Ds,does the turbine automatically shut off if any portion of the monitoring system malfunetiotu <br /> A or fails a test? <br /> ❑ Yes Q No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In tete Section i3,below,dwMU how and when these deficiencies were or will be corrected. <br /> H. Comments- <br /> Page 3 of 3 <br /> o�or <br />
The URL can be used to link to this page
Your browser does not support the video tag.